HomeMy WebLinkAboutAGNEW CAR WASH - FDP - 32-06/A - CORRESPONDENCE - DRAINAGE REPORTMulberry Crossing Car Wash
March 21, 2007
Floodplain Comments
The floodplain needs to be shown on the site plan — please see the floodplain
development review checklist - REPEAT COMMENT
We did not receive updated MSDS for the chemicals being used. Please resubmit to
address our previous comment: There is one chemical, The Option, that would make this
facility a critical facility because in concentrate form it is considered a corrosive. Please
try to find a different chemical and resubmit that MSDS for review. — REPEAT
COMMENT
Some of the floodplain regulations for the Poudre River changed in February:
• The Product 6 corridor line is no longer regulated. Please remove this line
from the plat and plans.
• The floodway changed from a 0.1 ft. rise to a 0.5 ft rise. Please revise the
floodway line shown on the plans.