Loading...
HomeMy WebLinkAboutAGNEW CAR WASH - FDP - 32-06/A - CORRESPONDENCE - DRAINAGE REPORTMulberry Crossing Car Wash March 21, 2007 Floodplain Comments The floodplain needs to be shown on the site plan — please see the floodplain development review checklist - REPEAT COMMENT We did not receive updated MSDS for the chemicals being used. Please resubmit to address our previous comment: There is one chemical, The Option, that would make this facility a critical facility because in concentrate form it is considered a corrosive. Please try to find a different chemical and resubmit that MSDS for review. — REPEAT COMMENT Some of the floodplain regulations for the Poudre River changed in February: • The Product 6 corridor line is no longer regulated. Please remove this line from the plat and plans. • The floodway changed from a 0.1 ft. rise to a 0.5 ft rise. Please revise the floodway line shown on the plans.