HomeMy WebLinkAboutAGNEW CAR WASH - PDP - 32-06 - CORRESPONDENCE - (7)Please see notes in drainage report and on the plans.
The Product 6 corridor line is missing from on the plat.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterMastewater
Number: 36 Created: 12/4/2006
[1/23/07]
[12/4/06] Label size of water service.
Number: 37 Created: 12/4/2006
[1/23/07] Add note to protect in place during construction.
[12/4/06] The 24-inch water main is cathodically protected. There is a CP test station west
of the existing air release MH. Show location of the test station and add note to protect
during construction.
Number: 39 Created: 12/4/2006
[1123/07] Add details noted on redlined utility plans. (I can email the details if needed.)
[12/4/06] At Final Compliance, include appropriate City standard details.
Number: 69 Created: 1 /23/2007
[1/23/07] See redlined utility plans for other comments.
Page 4
Number: 75 Created: 1 /23/2007
[1/23/07] Please correct minor line over text problems. See redlines.
Topic: Engineering - Utiltity Plan
Number: 18 Created: 12/1 /2006
[1/11/07] The required parking set back of 50 feet minimum has still not been met. Please
submit a formal variance request with justification.. See redline comments.
[12/1/06] The first few parking stalls off of the frontage road driveway do not meet the
minimum parking set back requirement, see LCUASS Figure 19-6. You may submit a formal
variance request for consideration which will be granted or denied based on site conditions
and justification provided.
Number: 21 Created: 12/1 /2006
[1/11/07] Street cut limits should be shown east of the proposed dive approach near the
easterly property boundary.
[12/1/06] Show and label the proposed limits of street cut on the Overall Utility Plan sheet
just east of the proposed driveway cut and east of the proposed sanitary sewer connection.
Topic: Technical Services - Survey
Number: 51 Created: 12/6/2006
[1/11/07]
[12/6/06] Please show how Mulberry & Lemay were dedicated.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 68 Created: 1 /22/2007
[1/22/07] Please refer to the Floodplain Development Review Checklists (50% and 100%)
for items to be on the plat, plans and drainage report. These forms are available on our
website: http://fcgov.com/stormwater/floodplain-forms.php - REPEAT COMMENT
Please include the FEMA cross-section line on the grading plan. Only the BFE line was
shown. — REPEAT COMMENT
Please include the following notes on the grading plan and also discuss in the drainage
report: - REPEAT COMMENT
• BFE at upstream end of building
• Regulatory flood protection elevation (BFE + 24 inches)
• All HVAC and electrical must be elevated or floodproofed above the regulatory flood
protection elevation.
• Type of foundation (i.e. slab -on -grade)
The BFE given in the drainage report is at the upstream side of the property. Please give
the BFE at the upstream side of the building. This is what their flood insurance rates will be
based on. Therefore, you don't want to have a higher BFE listed that what should be put on
the elevation certificate.
There is one chemical, The Option, that would make this facility a critical facility because in
concentrate form it is considered a corrosive. Please try to find a different chemical and
resubmit that MSDS for review.
Page 3
[1/11/07] Please relocate the sign monument out of the ROW.
Number: 63 1 Created: 1 /11 /2007
[1/11/07] The detached sidewalk around the cul-de-sac shall be constructed in the Ultimate
location/elevation. Please revise the typical Frontage Road Section and Grading Plan to
show that the concrete sidewalk and parkway will be graded and constructed approximately
6 inches higher than the street pavement. Standard cross slope for sidewalks and parkways
is 2 percent. Per CDOT, no curb and gutter is required to be constructed on the frontage
road for this project. An earth swale may be needed in the parkway to collect and convey
any street drainage in the cul-de-sac since no gutter is proposed. See redline comments for
clarification.
Number: 64 Created: 1 /11 /2007
[1/11/07] There is an existing drain pipe at the end of the frontage road that is labelled to be
plugged and abondoned. Please explain how your frontage road design allows for this to
occur. Where will the the water go that was being carried by this pipe. I am assuming that
the existing flow is coming from the ditch near Mulberry and is being conveyed south
through the pipe toward the property and leading to the river ?
Number: 65 Created: 1 /11 /2007
[1/11/07] Please show drainage patterns on the cul-de-sac using arrows. If drainage is
being conveyed toward the parkway, a swale may be needed in the parkway since no curb
and gutter is being proposed.
Number: 66 Created: 1 /11 /2007
[1/11/07] Please provide all elevations, dimensions and slopes per LCUASS Figure 7-19 on
your street design for the cul-de-sac.
Number: 67 Created: 1 /16/2007
[1/16/07] The minimum radius required for the turn around is 50 feet per the LCUASS
standards and PFA requirements. The proposed design shows a 48 foot radius. You will
need to submit a variance request with adequate justification for the reduced radius
dimension for consideration and a letter of approval from PFA must be provided.
Topic: Engineering - Technical services
Number: 70 Created: 1 /23/2007
[1/23/071 Boundary and Legal close.
Number: 71 Created: 1/23/2007
[1/23/07] Product - 6 - line is too light / fine to show well for scanning or copying purposes.
Please use heavier line type.
Number: 72 Created: 1 /23/2007
[1/23/07] Cap LS no. at SE corner ?
Number: 73 Created: 1 /23/2007
[1/23/07] Provide distances to locate existing storm drainage easement.
Number: 74 Created: 1 /23/2007
[1/23/07] Mulberry ROW should have been obtained by CDOT. Lemey ROW should have
been granted to the City. Please contact Real Estate Services for clarification.
Page 2
��
STAFF PROJECT REVIEW
City of Fort Collins
JOHN AGNEW & ANDREA AGNEW Date: 01/24/2007
P.O. BOX 827
FRISCO, CO 80443
Staff has reviewed your submittal for AGNEW CAR WASH PDP - TYPE I, and we offer the
following comments:
ISSUES:
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 54 Created: 1 /11 /2007
[1/11/07] Please add the month and year below the title and legal description on the cover
sheet.
Number: 55 Created: 1 /11 /2007
[1/11/07] Revise the index on the cover sheet to include the Plat for reference as sheet 2
and move the detail sheet to the end of the plan set.
Number: 56 Created: 1 /11 /2007
(1/11/07] Per LCUASS Appendix E, 2 City of Fort Collins benchmarks shall be provided.
Revise the BM info on the cover sheet accordingly.
Number: 57 Created: 1 /11 /2007
[1111/07] A variance request will be required for the parking set back from the frontage
road. Please submit a formal variance request with justification and include this variance
request on the cover sheet, General Note No. 48
Number: 58 Created: 1 /11 /2007
[1/11/07] The approximate limits of street cut should be located east of the proposed drive
approach near the easterly property boundary.
1
Number: 59 Created: 1 /11 /2007
[1/11/07) The isting concrete walk at the corner of Mulberry and Lemay was constructed
o purpose of providing bicyclists a connection to the frontage road to keep them off of
Mulberry. Please provide a concrete walk/path connection from the existing walk to the
proposed frontage road pavement as shown on the redlines. The path should be no less
than 5 feet in width.
Number: 60 Created: 1 /11 /2007
[1/11/07] Please show the proposed power connection to the transformer shown on the
west side of the property.
Number: 61 Created: 1 /11 /2007
[1/11/07] If a connection is being made to a.Fort Collins -Loveland water main or Boxelder
sewer, a signature block for that district must be provided on the plans. Cover sheet and
Overall Utility Plan sheet.
Number: 62
Created: 1 /11 /2007
Page 1