Loading...
HomeMy WebLinkAboutAGNEW CAR WASH - PDP - 32-06 - CORRESPONDENCE - (3)Pete Wray RE: Mulber /Lena Ex r� Carwash Comments' - - _ Y P _ Page 1 From: Randy Maizland To: Frederickson, Deanne; Wray, Pete Date: 10/30/2006 11:49:09 AM Subject: RE: Mulberry/Lemay Express Carwash Comments I did briefly talk to the engineer regarding this set back issue. It may be a possibility to dedicate ROW to the back of Curb and place the parkway and sidewalk within an access easement (this has been done in the City) however, Mulberry is under CDOT jurisdiction and this proposal will need CDOT approval. I will try to get confirmation from CDOT by email correspondence. One other problem is that if the City needs to post signage for the frontage road, the signage needs to be within the ROW which becomes a problem since the ROW will only be to the back of the curb. It may be necessary to have the parkway within the ROW as well for signage needs by the City. The real question is, if the set back is measured from the back of curb or back of parkway, does this meet the "intent" of the setback requirement to have a sidewalk within a couple feet of the proposed building ? That I believe is a question Pete can probably answer better. The parkway area will need to be landscaped with the development which is another good reason to have the parkway strip contained within the ROW. I'll follow up once I get a reply from CDOT. Randy Maiziand >>> "Deanne Frederickson" <deanne@frederickson.us> 10/26 1:04 PM >>> We are trying to keep the building as close to the edge of the cul-de-sac as possible to keep the setback/ buffer from the river as wide as possible. Per Randy Maizland, we will be dedicating the R.O.W. at the flowline of the cul-de-sac, and placing the detached walk in a transportation and landscape easement. We were hoping to place the building approx. 2-3' behind the walk. Will this work? Also, will we be required to landscape the Mulberry frontage north of the Cul-de-sac? Deanne Frederickson The Frederickson Group, LLC 118 E. 29th St. suite C Loveland, CO 80538 (970)278-0240 fx (888)556-2740 dean ne oafrederickson us -----Original Message ----- From: Pete Wray fmailto:PWRAyaa fcoov coml Sent: Thursday, October 26, 2006 10:15 AM To: dean ne cDfrederickson us Subject: Mulberry/Lemay Express Carwash Comments Deanne, see attached comments from the preliminary design review. Please let me know if you have any question? thanks, Pete