Loading...
HomeMy WebLinkAboutAGNEW CAR WASH - PDP - 32-06 - SUBMITTAL DOCUMENTS - ROUND 1 - RECOMMENDATION/REPORTUNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests" Soil Classification Group Symbol Group Namea Coarse Grained Soils Gravels Clean Gravels Cu z 4 and 1 s Cc s 3E GW Well -graded gravel` More than 50% retained More than 50% of coarse fraction retained on Less than 5% fines` Cu <4 and/or 1 > Cc> 31 GP Poorly graded gravel` on No. 200 sieve No. 4 sieve Gravels with Fines More Fines classify as ML or MH GM Silty gravel`•`•" than 12% finesc Fines classify as CL or CH GC FGH Clayey gravel Sands Clean Sands Cu a 6 and 1 s Cc s 36 SW Well -graded sand' 50% or more of coarse fraction passes Less than 5% fines° Cu < 6 and/or 1 > Cc > 3E SP Poorly graded sand' No. 4 sieve Sands with Fines Fines classify as ML or MH SM Silty sand'"' More than 12% fines° Fines Classify as CL or CH SC Clayey sands"' Fine -Grained Soils Sifts and Clays inorganic PI > 7 and plots on or above "A" line' CL Lean clay"" 50% or more passes the . Liquid limit less than 50 PI <4 or plots below "A" line' ML Silt"` No. 200 sieve organic Liquid limit - oven dried Organic day"" "' < D.75 OL Liquid limit - not dried Organic SiltK 1 M O Silts and Clays inorganic PI plots on or above "A" line CH Fat clay"•"" Liquid limit 50 or more PI lots below 'A* line MH Elastic Silt""' organic Liquid limit - oven dried Organic clay' <0.75 OH Liquid limit - not dried Organic siltK-'�O Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat "Based on the material passing the 3-in. (75-mm) sieve e If field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. °Gravels with 5 to 12% fines require dual symbols: GW-GM well -graded gravel with silt, GW-GC well -graded gravel with clay, GP -GM poorly graded gravel with silt, GP -GC poorly graded gravel with clay. °Sands with 5 to 12% fines require dual symbols: SW-SM well -graded sand with silt, SW -SC well -graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay z FCu = Deo/Dro Cc = (D,, Dio X Deo F If soil contains >_ 15% sand, add 'with sand" to group name. off fines classify as CL-ML, use dual symbol GC -GM, or SC-SM. 60 50 d W 40 Z Y 30 U g20 n- 10 7 4 "If fines are organic, add "with organic fines" to group name. If soil contains > 15% gravel, add "with gravel" to group name. ' If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel," whichever is predominant. L If soil contains >_ 30% plus No. 200 predominantly sand, add "sandy" to group name. °Alf soil contains >_ 30% plus No. 200, predominantly gravel, add "gravelly" to group name. "PI >_ 4 and plots on or above "A" line. °PI < 4 or plots below "A" line. PI plots on or above "A" line. OR plots below "A" line. — --r_ j — For classification of fine-grained soils and fine-grained fraction _of coarse -grained soils ___ _—�xp0,'� I ce Equation of "A" • line Horizontal at P1=4 to LL=25.5. F_ then PI=0.73 (LL-2o) i Equation of "U" -line O dI, '-- Vertical at LL=16 to PI=7, --'-- —� �— then PI=0.9 (LL-8) O I I ' MH or OH _ 77; ML or OL I � 0 10 16 20 30 40 50 60 70 90 90 100 110 LIQUID LIMIT (ILL) Irerracon Fom 111--6/98 GENERAL NOTES DRILLING & SAMPLING SYMBOLS SS: Split Spoon - 1 3/8" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger ST: Thin -Walled Tube - 2" O.D., unless otherwise noted PA: Power Auger RS: Ring Sampler- 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger DB: Diamond Bit Coring - 4", N, B RB: Rock Bit BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-inch O.D. split -spoon sampler (SS) the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the "Standard Penetration" or "N-value". For 3" O.D. ring samplers (RS) the penetration value is reported as the number of blows required to advance the sampler 12 inches using a 140-pound hammer falling 30 inches, reported as "blows per foot," and is not considered equivalent to the "Standard Penetration"or "N-value ". WATER LEVEL MEASUREMENT SYMBOLS WL: Water Level WS: While Sampling N/E: Not Encountered WCI: Wet Cave in WD: While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB: After Boring ACR: After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse -grained soils are defined on the basis of their in -place relative density and fine-grained soils on the basis of their consistency. CONSISTENCY OF FINE-GRAINED SOILS Standard Unconfined Penetration or Compressive N-value (SS) Strength, Qu, psf Blows/Ft. Consistency < 500 <2 Very Soft 500 — 1,000 2-3 Soft 1,001 — 2,000 4-6 Medium Stiff 2,001 — 4.000 7-12 Stiff 4,001 — 8,000 13-26 Very Stiff 8,000+ 26+ Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL Descriptive Term(s) of other Percent of constituents Dry Weight Trace < 15 With 15 — 29 Modifier > 30 RELATIVE PROPORTIONS OF FINES Descriptive Term(s) of other Percent of constituents Dry Weight Trace < 5 With 5-12 Modifiers > 12 RELATIVE DENSITY OF COARSE -GRAINED SOILS Standard Penetration or N-value (SS) Ring Sampler (RS) Blows/Ft. Blows/Ft. Relative Density 0-3 0-6 Very Loose 4-9 7-18 Loose 10-29 19-58 Medium Dense 30 — 49 59-98 Dense 50+ 99+ Very Dense GRAIN SIZE TERMINOLOGY Maior Component of Sample Particle Size Boulders Over 12 in. (300mm) Cobbles 12 in. to 3 in. (300mm to 75 mm) Gravel 3 in. to #4 sieve (75mm to 4.75 mm) Sand #4 to #200 sieve (4.75mm to 0.075mm) Silt or Clay Passing #200 Sieve (0.075mm) PLASTICITY DESCRIPTION Term Plasticity Index Non -plastic 0 Low 1-10 Medium 11-30 High 30+ Irerracon r_>a»CHI MMR lrerracon -6 -4 -2 Cn M m r oil 0 n O z O r 0 2 D 1 O z 4 6 8 0.01 0.1 1 10 APPLIED PRESSURE, TSF e Specimen Identification Classification Y m 11 0 J h Notes: Z O U a C7 m 0 N O O O z CONSOLIDATION TEST a Project: Proposed Car Wash Facility Irerracon Site: S/E/C of Mulbery St. and Lemay Ave. Fort Collins, Colorado N 0 Job #: 20065109 Date: 8-14-06 Ya, pcf WC,% • 4 1.Oft FILL MATERIAL: CLAYEY SAND 122 7 cn m m r r 0 0 0 Z N O r O D O Z 3L J.1 APPLIED PRESSURE, TSF Specimen Identification Classification Yd, pcf WC,% G 3 4.Oft 1 SANDY LEAN CLAY 115 7 Notes: Z CONSOLIDATION TEST a y Project: Proposed Car Wash Facility Irerracon Site: S/E/C of Mulbery St. and Lemay Ave. Fort Collins, Colorado o Job M 20065109 U F Date: 8-14-06 0) m m r r n O z cn O r v D --I O z 6 4 2 00 4 6 8 0.1 1 11 APPLIED PRESSURE, TSF Specimen Identification Classification Ya, pcf WC,% 101 1 4.Oft SANDY LEAN CLAY 103 12 Notes: CONSOLIDATION TEST Project: Proposed Car Wash Facility Irerracon Site: S/E/C of Mulbery St. and Lemay Ave. Fort Collins, Colorado Job M 20065109 60 CL CH 50 P L A 40 s T I C T 30 Y I N 20 D E X 10 ML EH CL-ML 20 40 60 80 100 LIQUID LIMIT Specimen Identification LL PL PI %Fines Classification • 2 4.0ft NP NP NP 25 SILTY SAND with GRAVEL(SM) m 4 2.Oft 31 13 18 49 CLAYEY SAND(SC) 's i t , , , Irerracon ATTERBERG LIMITS RESULTS Project: Proposed Car Wash Facility Site: S/E/C of Mulbery St. and Lemay Ave. Fort Collins, Colorado Job #: 20065109 Date: 8-14-06 APPENDIX B LOG OF BORING NO. 4 Page 1 of 1 CLIENT ARCHITECT / ENGINEER John Agnew SITE S/E/C of MulberySt. and Lemay Ave. PROJECT Fort Collins, Colorado Proposed Car Wash Facility SAMPLES TESTS 0 DESCRIPTION p Co o 0 Cn m z z LLo zoco � a U iaU I Wz 00 > W U Approx. Surface Elev.: 97.48 ft o Z) z HIt Cn m of 0a z FILL MATERIAL Clayey Sand Brown, stiff to very stiff, trace gravel CL 1 IRS1 12 34 6.8 122 CL 2 �SS 1 12 32 4.5 3 94.5 SILTY SAND WITH GRAVEL SM 3 SS NR 31 Brown, dense to very dense 5 t SM 4 JACI '. g 88.5 0.8 BOTTOM OF BORING * "AC" DENOTES AUGER CUTTINGS COLLECTED DUE TO HOLE COLAPSE e m 0 Z 0 U Q K Wd' F The stratification lines represent the approximate boundary lines o between soil and rock types: in -situ, the transition may be gradual. o WATER LEVEL OBSERVATIONS, ft BORING STARTED 7-21-06 m WL �Z DRY WD IT 6 AB ifierracon BORING COMPLETED 7-21-06 WL RIG CME-55 FOREMAN CMG o WL m Water Level Reading on 8/15/06 APPROVED DAR I JOB # 20065109 LOG OF BORING NO. 3 Page 1 of 1 CLIENT ARCHITECT! ENGINEER John Agnew SITE S/E/C of Mulbery St. and Lemay Ave. PROJECT Fort Collins, Colorado Proposed Car Wash Facility SAMPLES TESTS DESCRIPTION O ❑ a Z L)UL 3 } r F cn W W O ?� 0Z " Approx. Surface Elev.: 98.96 ft o z r (t v, m F-Z � o } o a Z) v~i FILL MATERIAL Sandy Lean Clay with Gravel Brown, stiff to very stiff 2 97 SANDY LEAN CLAY Brown, hard CL 1 RS 12 36 6.9 115 5 6 93 SILTY SAND WITH GRAVEL Brown, dense to very dense, trace cobbles encountered SM 2 1 SS 12 50/0.1 4.3 � 10 SM 3 JACI 12 5.4 14 85 BOTTOM OF BORING 0 "'AC DENOTES AUGER CUTTINGS COLLECTED DUE TO HOLE COLAPSE 0 i 0 U Q K WK F The stratification lines represent the approximate boundary lines o between soil and rock types: in -situ, the transition may be gradual. o WATER LEVEL OBSERVATIONS, ft N Irerracon BORING STARTED 7-21-06 WL -7 DRY WD IT 10.0 AB 7-21-06 COME 0 WL s RIG55EDFOREMAN CMG m WL Water Level Reading on 8/15/O6 APPROVED DAR JOB # 20065109 LOG OF BORING NO. 2 Page 1 of 1 CLIENT ARCHITECT / ENGINEER John Agnew SITE S/E/C of Mulbery St. and Lemay Ave. PROJECT Fort Collins, Colorado Proposed Car Wash Facility SAMPLES TESTS DESCRIPTION F Z U U 0 42 z _ z F zz S ad rn W coW O zco 0 � OW (D Approx. Surface Elev.: 97.93 ft W o (n D z } W Of d� U) m a0 3 0 ofz� o a 7) rn FILL MATERIAL Sandy Lean Clay with Gravel Brown, stiff to very stiff 3 95 SILTY SAND WITH GRAVEL Brown, dense to very dense, trace cobbles encountered SM 1 RS 12 50/0.6133.0 5 i SM 2 SS 12 50/0.1 1.1 10 SM 3 �AC 12 3.2 14 &4 BOTTOM OF BORING "AC" DENOTES AUGER CUTTINGS COLLECTED DUE TO HOLE COLAPSE i i The stratification lines represent the approximate boundary lines between soil and rock types: in -situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft Irerraccin BORING STARTED 7-21-06 i WL DRY WD Z 6 AB COMPLETED7 -21-06 WL � Y ROBING CME-55I FOREMAN CMG WL Water Level Reading on 8/15/06 APPROVED DAR JOB # 20065109 LOG OF BORING NO. 1 Page 1 of 1 CLIENT ARCHITECT / ENGINEER John Agnew SITE S/E/C of Mulbery St. and Lemay Ave. PROJECT Fort Collins, Colorado Proposed Car Wash Facility SAMPLES TESTS c9 DESCRIPTION J m } o w n U_ Z LL~ ui U) U) W m W O z� W� ? ZZ OW Approx. Surface Elev.: 98.96 ft ❑ ai ❑ 7 z r w Q� a U) m QO 3: ❑ K ❑ a zlr ❑ U) FILL MATERIAL Sandy Lean Clay with Gravel CL 1 SS 12 26 4.7 Brown, very stiff 3 96 SANDY LEAN CLAY Brown, very stiff SM 2 RS 12 5010.6 12.2 103 5 7 92 SILTY SAND WITH GRAVEL Brown, dense to very dense, trace cobbles encountered SM 3 SS 12 50/0.1 2.1 10 J':14 SM 4 AC 12 5.6 85 BOTTOM OF BORING e "'AC" DENOTES AUGER CUTTINGS COLLECTED DUE TO HOLE COLAPSE Z 0 U Q cc WC F The stratification lines represent the approximate boundary lines o between soil and rock types: in -situ, the transition may be gradual. N o WATER LEVEL OBSERVATIONS, ft N Irerracon BORING STARTED 7-21-06 WL 4 DRY WD 1 10.5 AB COMPLETED7 1-06 o WL w BORING CMG m WL Water Level Reading on 8/15/06 APPROVED DAR JOB # 20065109 MULBERRY ST. FRONTAGE RD. rTBM I w I w _ #1 O U) cD z 0 J_ DO S U #2 o w 0- O 0- 0 a /1 #3 LEGEND FIGURE 1: SITE DIAGRAM & TEST BORING LOCATIONS - APPROXIMATE TEST BORING LOCATIONS. PROPOSED CAR WASH BUILDING S/E/C OF MULBERRY ST. & LEMAY AVE. - TBM = TEMPORARY BENCH MARK, SURVEYOR'S FORT COLLINS, COLORADO CONTROL POINT, ASSUME ELEV. = 100.0' Project Mngr. Project No. Designed ay. DAR 20065109 Designed lrerracan Scale - DAR Checked By: DAR 301 N. Howes Street Date: 8115106 Approved BY Fort Collins, Colorado 80521 Drawn By DIAGRAM IS FOR GENERAL LOCATION ONLY, DAR DJS AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES. File Name: 20065109-1 Figure No. 1 APPENDIX A Geotechnical Engineering Report 1rerramn Proposed Car Wash Facility SIEIC of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 Surface Drainage Positive drainage should be provided during construction and maintained throughout the life of each structure on the site. Infiltration of water into utility or foundation excavations must be prevented during construction. Planters and other surface features, which could retain water in areas adjacent to the building or pavements, should be sealed or eliminated. In areas where sidewalks or paving do not immediately adjoin the structure, we recommend that protective slopes be provided with a minimum grade of approximately 10-percent for at least 10 feet from perimeter walls. Backfill against footings, exterior walls, and in utility and sprinkler line trenches should be well compacted and free of all construction debris to reduce the possibility of moisture infiltration. Downspouts, roof drains or scuppers should discharge into splash blocks or extensions when the ground surface beneath such features is not protected by exterior slabs or paving. Sprinkler systems should not be installed within 10-feet of foundation walls. Landscaped irrigation adjacent to the foundation system should be minimized or eliminated. GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide testing and observation during excavation, grading, foundation and construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical 17 Geotechnical Engineering Report lrerracon Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 Additional Design and Construction Considerations Exterior Slab Design and Construction Compacted subgrade or existing clay soils will expand with increasing moisture content; therefore, exterior concrete grade slabs may heave, resulting in cracking or vertical offsets. The potential for damage would be greatest where exterior slabs are constructed adjacent to the building or other structural elements. To reduce the potential for damage, we recommend: • exterior slabs be supported on fill with no, or very low expansion potential • strict moisture -density control during placement of subgrade fills • placement of effective control joints on relatively close centers and isolation joints between slabs and other structural elements • provision for adequate drainage in areas adjoining the slabs • use of designs which allow vertical movement between the exterior slabs and adjoining structural elements In those locations where movement of exterior slabs cannot be tolerated or must be reduced, consideration should be given to: • Constructing slabs with a stem or key -edge, a minimum of 6 inches in width and at least 12 inches below grade; • supporting keys or stems on drilled piers; or • providing structural exterior slabs supported on foundations similar to the building. Underground Utility Systems All piping should be adequately bedded for proper load distribution. It is suggested that clean, graded gravel compacted to 75 percent of Relative Density ASTM D4253 be used as bedding. Utility trenches should be excavated on safe and stable slopes in accordance with OSHA regulations as discussed above. Backfill should consist of the on -site soils or imported material approved by the geotechnical engineer. The pipe backfill should be compacted to a minimum of 95 percent of Standard Proctor Density ASTM D698. 16 Geotechnical Engineering Report lliwacon Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 • Liquid Limit.................................................................................. 30 (max) • Plasticity Index............................................................................. 15 (max) • Group Index................................................................................. 10 (max) Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. It is recommended all fill material to placed on the site be compacted to at least 95 percent of Standard Proctor Density ASTM D698. On -site clay soils should be compacted within a moisture content range of 2 percent below, to 2 percent above optimum. Imported granular soils should be compacted within a moisture range of 3 percent below to 3 percent above optimum unless modified by the project geotechnical engineer. Excavation and Trench Construction Excavations into the on -site soils will encounter a variety of conditions. Excavations into the clays can be expected to stand on relatively steep temporary slopes during construction. However, caving soils and groundwater may also be encountered. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local and federal regulations, including current OSHA excavation and trench safety standards. The soils to be penetrated by the proposed excavations may vary significantly across the site. The preliminary soil classifications are based solely on the materials encountered in widely spaced exploratory test borings. The contractor should verify that similar conditions exist throughout the proposed area of excavation. If different subsurface conditions are encountered at the time of construction, the actual conditions should be evaluated to determine any excavation modifications necessary to maintain safe conditions. As a safety measure, it is recommended that all vehicles and soil piles be kept to a minimum lateral distance from the crest of the slope equal to no less than the slope height. The exposed slope face should be protected against the elements. 15 Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 1rerracnn Exposed areas, which will receive fill, once properly cleared and benched where necessary, should be scarified to a minimum depth of 12-inches, conditioned to near optimum moisture content, and compacted. It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. Based upon the subsurface conditions determined from the geotechnical exploration, the majority of the underlying subgrade soils exposed during construction are anticipated to be relatively stable; however soft compressible and/or unstable areas will be encountered during construction in close proximity to groundwater, or where the cohesive soils have a high moisture content. The stability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. If unstable conditions develop, workability may be improved by scarifying and drying. Overexcavation of wet zones and replacement with granular materials may be necessary. Use of lime, fly ash, kiln dust, cement or geotextiles could also be considered as a stabilization technique. Laboratory evaluation is recommended to determine the effect of chemical stabilization on subgrade soils prior to construction. Lightweight excavation equipment may be required to reduce subgrade pumping. Subgrade Preparation Subgrade soils beneath interior and exterior slabs should be scarified; moisture conditioned and compacted to a minimum depth of 12-inches below proposed controlled fill material. The moisture content and compaction of subgrade soils should be maintained until slab or pavement construction. Fill Materials and Placement Approved imported materials may be used as fill material and are suitable for use as compacted fill beneath interior or exterior floor slabs. Imported soils (if required) should conform to the following: Gradation Percent finer by weight (ASTM C136) 3"......................................................................................................... 100 No. 4 Sieve..................................................................................... 50-100 No. 200 Sieve.............................................................................. 35 (max) 14 Geotechnical Engineering Report lrerraron Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 investment for pavements. Prior to implementing any maintenance, additional engineering observation is recommended to determine the type and extent of preventive maintenance. Site grading is generally accomplished early in the construction phase. However as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, or rainfall. As a result, the pavement subgrade may not be suitable for pavement construction and corrective action will be required. The subgrade should be carefully evaluated at the time of pavement construction for signs of disturbance or excessive rutting. If disturbance has occurred, pavement subgrade areas should be reworked, moisture conditioned, and properly compacted to the recommendations in this report immediately prior to paving. Please note that if during or after placement of the stabilization or initial lift of pavement, the area is observed to be yielding under vehicle traffic or construction equipment, it is recommended that Terracon be contacted for additional alternative methods of stabilization, or a change in the pavement section. Earthwork General Considerations The following presents recommendations for site preparation, excavation, subgrade preparation and placement of engineered fills on the project. All earthwork on the project should be observed and evaluated by Terracon. The evaluation of earthwork should include observation and testing of engineered fill, subgrade preparation, foundation bearing soils, and other geotechnical conditions exposed during the construction of the project. Site Preparation Strip and remove any existing debris or other deleterious materials from proposed building and pavement areas. All exposed surfaces should be free of mounds and depressions that could prevent uniform compaction. After the required overexcavation is performed, the site should be initially graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed building addition. 13 Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 lrerrmon base course. Aggregate base course should be placed in lifts not exceeding six inches and should be compacted to a minimum of 95% Standard Proctor Density (ASTM D698). HMA pavement should be composed of a mixture of aggregate, filler, binders, and additives, if required, and approved bituminous material in accordance with the LCUASS Pavement Design Criteria. The HMA should conform to an approved mix design stating the Hveem and/or Superpave properties, optimum asphalt content, job mix formula and recommended mixing and placing temperatures. Aggregate used in the HMA should meet particular gradations, such as the Colorado Department of Transportation Grading S, SX or SG specifications. Mix designs should be submitted prior to construction to verify their adequacy. Asphalt material should be placed in maximum 3-inch lifts and should be compacted to a within a range of 92 to 96 % of Maximum Theoretical Density. Long-term pavement performance will be dependent upon several factors, including maintaining subgrade moisture levels and providing for preventive maintenance. The following recommendations should be considered the minimum: • Site grading at a minimum 2% grade away from the pavements; • The subgrade and the pavement surface have a minimum % inch per foot slope to promote proper surface drainage. • Consider appropriate edge drainage and pavement under drain systems, • Install pavement drainage surrounding areas anticipated for frequent wetting (e.g. garden centers, wash racks) • Install joint sealant and seal cracks immediately, • Seal all landscaped areas in, or adjacent to pavements to minimize or prevent moisture migration to subgrade soils; • Placing compacted, low permeability backfill against the exterior side of curb and gutter; and, • Placing curb, gutter and/or sidewalk directly on subgrade soils without the use of base course materials. Preventive maintenance should be planned and provided for through an on -going pavement management program. Preventive maintenance activities are intended to slow the rate of pavement deterioration, and to preserve the pavement investment. Preventive maintenance consists of both localized maintenance (e.g. crack and joint sealing and patching) and global maintenance (e.g. surface sealing). Preventive maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on 12 Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 lrerracon deformation due to shrink/swell related movement of the subgrade. It is, therefore, important to minimize moisture changes in the subgrade to reduce shrink/swell movements. Recommended alternatives for flexible and rigid pavements, summarized for each traffic area, are as follows: ",; ` s r RECOMMENDED MINIMUM PAVEMENT KNESS "INCHES THICt 4� . t �! to n : ` Aggregate Base , Traffic Area ' Alte matrves F a HMA Surtace x ,a HMA Surtace Class 5 Rr � AshµTreatedPo�and F , r n ,- � Grading S or SX Grading SG {Course t Y n +;Sub Baser- Cement �- Total �iA 1.5 2.5 6.0 10.0 Automobile B 3.5 6.0 12.0 21.5 Parking Areas C —1 6.0 6.0 C — 2 12.0 5.5 17.5 (3) A 2.0 3.0 7.0 12.0 Heavy B 1.5 2.5 6.0 12.0 22.0 Dutyrrruck Traffic Areas C —1 7.0 7.0 C — 2 12.0 6.0 18.0 (1) If the HMA surface course is to consist of Grading S, then the required minimum lift/thickness placed should be 2-inches. If the HMA surface course is to consist of Grading SX, the required minimum lift/thickness placed should be 1-1/2-inches. (2) If fly ash is utilized for the on -site pavement improvement areas to mitigate the soft subgrade materials, it is recommended that at least the upper 12-inches of the prepared subgrade be treated with fly ash. Terracon is available to provide the required laboratory soil and fly ash mix design as well as placement recommendations upon request. (3) Alternative A assumes a minimum of 2-feet of approved moisture conditioned/non-expansive fill material is positioned beneath the planned paved sections, after an approved proof -roll has been completed. Due to the properties of the existing cohesive on -site soils, full depth HMA pavement is not recommended. Each alternative should be investigated with respect to current material availability and economic conditions. Aggregate base course (if used on the site) should consist of a blend of sand and gravel, which meets strict specifications for quality and gradation. Use of materials meeting Colorado Department of Transportation (CDOT) Class 5 or 6 specifications is recommended for 11 Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 lferrecon consolidometer apparatus and inundated after a predetermined load, (approximately 150 psf to simulate the actual loading conditions experienced within an asphalt paved section underlain by an aggregate base course), is placed. The swell index is the resulting amount of swell as a percent of the sample's thickness after the inundation period. The swell potential for the subgrade soils, (i.e. subsoil samples collected approximately 1-foot below existing site grades in Test Boring No. 4), based on the LCUASS Pavement Design laboratory testing procedures, resulted in swell index value of (+) 5.0 %. This value exceeds the maximum 2 percent criteria established for determining if swell -mitigation procedures in the pavement sections are required. Therefore, it will be necessary to mitigate the cohesive subgrade soils prior to pavement operations due to swelling soils. Due to the relatively dry, stiff and swell potential characteristics of the existing fill material it is recommended to remove the fill material to the native subsoils below. The fill material is suitable for reuse provided the recommendations contained in the Earthwork" section are followed. We provide herein, site -specific recommendations for subgrade stabilization if necessary after proofrolling the subgrade section. Stabilization may include incorporation of a chemical treatment such as kiln dust, and/or fly ash to mitigate swell potential soils. An alternate would be to over -excavate and replace with approved materials or provide 2-feet of non -expansive granular soils. Proofrolling and recompacting the subgrade is recommended immediately prior to placement of the aggregate road base section. Soft or weak areas delineated by the proofrolling operations should be undercut or stabilized in -place to achieve the appropriate subgrade support. If the fly ash section is selected, Terracon recommends incorporating approximately 12 percent by weight, Class C fly ash, into the upper 12-inches of subgrade. Hot Mix Asphalt (HMA) underlain by crushed aggregate base course with or without a fly ash treated subgrade, and non -reinforced concrete pavement are feasible alternatives for the proposed on -site paved sections. Based on the subsurface conditions encountered at the site, and the laboratory test results, it is recommended the on -site private drives and parking areas be designed using a minimum R-value of 7. Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support. The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade such as the soils encountered on this project. Thus, the pavement may be adequate from a structural standpoint, yet still experience cracking and 10 Geotechnical Engineering Report lferracon Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 • Positive separations and/or isolation joints should be provided between slabs and all foundations, columns or utility lines to allow independent movement. • Control joints should be provided in slabs to control the location and extent of cracking. • A minimum 2-inch void space should be constructed above or below non -bearing partition walls placed on slabs on grade. Special framing details should be provided at doorjambs and frames within partition walls to avoid potential distortion. Partition walls should be isolated from suspended ceilings. • Interior trench backfill placed beneath slabs should be compacted in accordance with recommended specifications outlined below. • In areas subjected to normal, loading, a minimum 4-inch layer of clean -graded gravel or aggregate base course should be placed beneath upper level interior slabs. • Floor slabs should not be constructed on frozen subgrade. • Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1 R are recommended. Pavement Design and Construction Based on the subsurface conditions encountered during the site exploration, it is our opinion the proposed on -site pavement areas are feasible provided the following recommendations are implemented. The subsoils encountered throughout the site are generally plastictcohesive soils exhibiting low subgrade strength characteristics and low to high swell/expansive potential. This report provides recommendations to help mitigate the effects of soil shrinkage and expansion. Even if these recommendations are followed some pavement distress and exterior slab movement should be anticipated. To evaluate the existing on -site soils for use as subgrade material beneath on -site pavement sections, we elected to use the design criteria established in the Larimer County Urban Area Street Standards (LCUASS) Pavement Design document as a guideline. In the LCUASS guidelines, undisturbed samples usually obtained directly from a ring barrel sampler, California Barrel or a cylindrical Shelby Tube device are placed in a laboratory one-dimensional S Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 lferrecon The lateral earth pressures herein do not include any factor of safety and are not applicable for submerged soils/hydrostatic loading. Additional recommendations may be necessary if submerged conditions are to be included in the design. Fill against grade beams and retaining walls should be compacted to densities specified in Earthwork. Medium to high plasticity clay soils should not be used as backfill against retaining walls. Compaction of each lift adjacent to walls should be accomplished with hand -operated tampers or other lightweight compactors. Overcompaction may cause excessive lateral earth pressures, which could result in wall movement. Seismic Considerations The project site is located in Seismic Risk Zone I of the Seismic Zone Map of the United States as indicated by the 1997 Uniform Building Code. Based upon the nature of the subsurface materials, Soil Profile Type "Sc" should be used for the design of structures for the proposed project (1997 Uniform Building Code, Table No. 16-J). A site classification "C" should be used for the design of structures for the proposed project (2003 International Building Code, Table No. 1615.1.1). Floor Slab Design and Consideration Conventional -type slab -on -grade construction procedures are feasible for the site. As presented on the enclosed boring logs and swell -consolidation test results low to high expansive soils are present on this site. This report provides recommendations to help mitigate the effects of soil shrinkage and settlement. However, even if these procedures are followed, some movement and at least minor cracking in the structure's foundation and slabs should be anticipated. The severity of cracking and other cosmetic damage such as uneven floor slabs will probably increase if any modification of the site results in excessive wetting or drying of the compressible materials. Eliminating the risk of movement and cosmetic distress may not be feasible, but it may be possible to further reduce the risk of movement if significantly more expensive measures are used during construction. Some of these options, such as the use of structural floors or mechanically stabilizing the soft compressible materials are discussed in this report. We would be pleased to discuss other construction alternatives with you upon request. Additional floor slab design and construction recommendations for upper and lower level slabs are as follows: C Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 1rerracon dead -load pressure will also reduce differential settlement between adjacent footings. Total movement resulting from the assumed structural loads is estimated to be about 1-inch. Additional foundation movements could occur if water from any source infiltrates the foundation soils; therefore, it is imperative proper drainage should be provided and maintained in the final design and during construction for each structure. if the subsoils become wetted below the proposed structures, movement exceeding 1-inch is likely. If this type of movement can not be tolerated and the subsurface soils become wetted, consideration should be given to an overexcavation and replacement . procedure to minimize/reduce the swell potential. If this alternative is to be considered additional recommendations can be provided upon request. Final recommendations during 'open -hole" or foundation excavation observations may vary depending upon conditions at that time, additional overlot grading procedures or design elevations. Foundation excavations should be observed by the geotechnical engineer. If the soil conditions encountered differ significantly from those presented in this report, supplemental recommendations will be required. Foundation and walls should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. The use of joints at openings or other discontinuities in walls is recommended. Lateral Earth Pressures For soils above any free water surface, recommended equivalent fluid pressures for unrestrained foundation elements are: • Active: Cohesive soil backfill (on -site clay soils).................................45 psf/ft Cohesionless soil backfill (granular imported soils).................35 psf/ft • Passive: Cohesive soil backfill (on -site clay soils)...............................250 psf/ft Cohesionless soil backfill (granular imported soils)...............350 psf/ft • Adhesion at base of footing.....................................................500 psf Where the design includes restrained elements, the following equivalent fluid pressures are recommended: At rest: Cohesive soil backfill (on -site clay soils).................................60 psf/ft Cohesionless soil backfill (granular imported soils).................50 psf/ft 7 Geotechnical Engineering Report 1irracon Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 ENGINEERING ANALYSES AND RECOMMENDATIONS Geotechnical Considerations The site appears suitable for the proposed construction from a geotechnical engineering point of view. It is important to establish and maintain good/positive surface drainage, especially in the immediate area of the proposed building footprints during and after construction. The following foundation system was evaluated for use on the site for the proposed addition: • Conventional -type spread footings bearing on approved native subsoils, or engineered fill material, which extends to the native, undisturbed subsoils below. Footings should not be placed on the existing overlot fill material in its in -situ condition. Conventional slab -on -grade construction procedures are considered acceptable for use, provided the design and construction recommendations presented herein are followed. Consideration should be given to installing a perimeter drainage system around the foundation areas discharging into a sump pit or day lighting away from the buildings. Foundation Systems — Conventional Type Spread Footings Due to the anticipated loads, the type of construction proposed and the soil conditions encountered within test borings analyzed to date, it is recommended the proposed building be supported by the use a conventional type spread footing foundation systems bearing upon the native subsoils or engineered controlled fill material which extends to the native subsoils below. Due to the moderate swell potential of the existing on -site fill material and the uncontrolled characteristics, it is recommended that all footings bear on the native undisturbed subsoils or on engineered fill material, which extends to the native subsoils below. The on -site fill materials suitable for reuse provided the recommendations contained in the Earthwork" section of this report are followed. Footings for the proposed buildings should be designed using a maximum net allowable bearing pressure of 2,000 pounds per square foot (psf). In addition, all footings should be designed to maintain a minimum dead load pressure of 500 psf. Exterior footings should be placed a minimum of 30 inches below finished grade for frost protection and to provide confinement for the bearing soils. Finished grade is the lowest adjacent grade for perimeter footings. Footings should be proportioned to reduce differential foundation movement. Proportioning on the basis of equal total movement is recommended; however, proportioning to relative constant Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 lferraran Recommended Representative Swell Potential Descriptions and Corresponding Slab Performance Risk Categories J Representative Percent Swell Representative Percent,3well r, Slab Performance Risk Category � � � j � P� 9' j � '�(f 000 psf Surcharge) � Low 0 to < 3 0 < 2 Moderate 3 to < 5 2 to < 4 High 5to<8 4to<6 Very High > 8 > 6 Based on the laboratory test results, the samples of the native cohesive material analyzed for this project generally were within the low range, however the overlot grading fill material exhibited high swell potential. Due to the potential movement to occur if the underlying, relatively dry to moist, stiff cohesive foundation bearing strata increases in moisture content we recommend positive drainage be maintained prior to during and post construction to reduce the potential for surface water infiltration from impacting the on -site cohesive soils. Groundwater Conditions Groundwater was not encountered during the initial field exploration and when checked several days after drilling dry cave in (DCI) measurements were recorded at approximate depths of 6 to 10 % -feet below site grades. These observations represent groundwater conditions at the time of the field exploration, and may not be indicative of other times, or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions and the flow levels of the nearby Poudre River. Based upon review of U.S. Geological Survey maps ('Hillier, et al, 1983), regional groundwater is expected to be encountered in unconsolidated alluvial deposits on the site, at depths ranging from 10 to 20-feet below the existing ground surface at the project site. 1 Hillier, Donald E.; Schneider, Paul A., Jr.; and Hutchinson, E. Carter, 1983, Depth to Water Table (1979) in the Boulder - Fort Collins -Greeley Area, Front Range Urban Corridor, Colorado, United States Geological Survey, Map 1-855-I. 5 Geotechnical Engineering Report lrerracon Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 Field and Laboratory Test Results Field and laboratory test results indicate the overlot fill material exhibits moderate to high swell potential when inundated with water and low to moderate bearing capabilities. However at this time, we do not possess adequate information regarding whether the fill was placed under controlled conditions to warrant placement of footings, floor slabs, or pavement sections on the fill material encountered without additional testing. The native cohesive soils and clayey sand soils exhibited low swell potential when inundated with water and low to moderate bearing capabilities. Swell — Consolidation Test Results The swell -consolidation test is commonly performed to evaluate the swell or collapse potential of soils or bedrock for determining foundation, floor slab and pavement design criteria, as well as the rate of consolidation. In this test, relatively undisturbed samples obtained directly from the ring barrel sampler or Shelby Tube sampling devices are placed in a laboratory apparatus and inundated with water under a predetermined load. The swell -index is the resulting amount of swell or collapse as a percent of the sample's thickness after the inundation period. Samples obtained at the 0.5 to 1-foot intervals for pavement analyses are typically pre -loaded and inundated with water at approximately 150 pounds per square foot (psf) to simulate actual pavement loading conditions. Samples obtained at the 3 to 4-foot intervals are generally pre -loaded and inundated with water at approximately 500 pounds per square foot (psf), while samples obtained at the 7 to 9-foot intervals are pre -loaded and inundated with water at approximately 1,000 psf to simulate the overburden soil pressures. After the inundation period additional incremental loads are applied to evaluate the rate of consolidation. For this assessment, we conducted 3 swell -consolidation tests at various intervals/depths throughout the site. The swell index values for the soil samples tested at the 150 psf, 500 psf and 1,000-psf inundation pressures revealed low to moderate swell characteristics on the order of (+) 1.2 to (+) 5.0 %. Colorado Association of Geotechnical Engineers (CAGE) uses the following information to provide uniformity in terminology between geotechnical engineers to provide a relative. correlation of slab performance risk to measured swell. "The representative percent swell values are not necessarily measured values; rather, they are a judgment of the swell of the soil and/or bedrock profile likely to influence slab performance." Geotechnical engineers use this information to also evaluate the swell potential risks for foundation performance based on the risk categories. 4 Geotechnical Engineering Report lrerracon Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 Laboratory tests were conducted on selected soil and bedrock samples and are presented in Appendix B. The test results were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. All laboratory tests were performed in general accordance with the applicable local or other accepted standards. Selected soil and bedrock samples were tested for the following engineering properties: • Water Content • Atterberg Limits and % (-) No. 200 Sieve • Dry Density • Swell — Consolidation • Grain Size Analysis SITE CONDITIONS The site for the proposed carwash facility is presently a vacant tract of land located at the southeast comer of Mulberry Street and Lemay Avenue. The property is sparsely vegetated with native grass and weeds, along with a row of deciduous trees running parallel with Mulberry Street on the south side of the lot near the Poudre River. The parcel is relatively flat, exhibiting positive surface drainage in the south and east directions toward the Poudre River. A minor drainage swale runs along the north side of the site, running parallel with Mulberry Street. Mulberry Street borders the north side of the parcel and Lemay Avenue borders the site to the west. Existing single story commercial buildings border the east side of the lot and the Poudre River boarders the south side. SUBSURFACE CONDITIONS Soil Conditions The subsurface soils at the site consisted of an approximate 2 to 3 feet of overlot grading fill material underlain by native sandy lean clay and/or clayey sand, which extended to the granular stratum below. Silty sand with gravel was encountered at an approximate depth of 3 to 7-feet below existing site grades and extended to the depths explored, approximately 15-feet below existing site grades. The stratification boundaries shown on the enclosed boring logs represent the approximate locations of changes in soil types; in -situ, the transition of materials may be gradual. OR Geotechnical Engineering Report lferramon Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 SITE EXPLORATION The scope of the services performed for this project included a site reconnaissance by an engineering geologist, a subsurface exploration program, laboratory testing and engineering analyses. Field Exploration For this study a total of four (4) test borings were drilled on July 21, 2006, at the locations shown on the Test Boring Location Diagram, Figure 1 included in Appendix A. The test borings were drilled to approximate depths of 10 to 15-feet below existing site grades and were advanced with a truck -mounted drilling rig, utilizing 4-inch diameter solid stem augers. The borings were located in the field by using a hand held GPS unit referenced to existing site features. Ground surface elevations at each boring location were determined by the use of an engineer's level and referenced to a temporary benchmark (TBM), which consisted of a surveyors control point (CP) situated near the northwest comer of the site and using an assumed elevation of 100 feet. The accuracy of boring locations and elevations should only be assumed to the level implied by the methods used. Lithologic logs of each boring were recorded by the engineering geologist during the drilling operations. At selected intervals, samples of the subsurface materials were taken by means of driving split -spoon and ring barrel samplers. Penetration resistance measurements were obtained by driving the split -spoon (SS) and ring barrel (RS) into the subsurface materials with a 140-pound hammer falling 30 inches. The penetration resistance value is a useful index in estimating the consistency, relative density or hardness of the materials encountered. Laboratory Testing All samples retrieved during the field exploration were returned to the laboratory for observation by the project geotechnical engineer and were classified in general accordance with the Unified Soil Classification System described in Appendix C. At that time, the field descriptions were confirmed or modified as necessary and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Boring logs were prepared and are presented in Appendix A. 9 GEOTECHNICAL ENGINEERING REPORT PROPOSED CARWASH FACILITY — 2'/2 - ACRE PARCEL SOUTHEAST CORNER OF MULBERRY STREET AND LEMAY AVENUE FORT COLLINS, COLORADO TERRACON PROJECT NO.20065109 AUGUST 15, 2006 INTRODUCTION This report contains the results of our geotechnical engineering exploration for the proposed carwash facility to be located at a vacant tract of land situated the southeast corner of Mulberry Street and Lemay Avenue in Fort Collins, Colorado. The site is located in the Southwest % of Section 7, Township 7 North, Range 68 West of the 6th Principal Meridian, Larimer County, Fort Collins, Colorado. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: • subsurface soil conditions • groundwater conditions • foundation design and construction • floor slab design and construction • lateral earth pressures • pavement design and construction • earthwork • drainage The recommendations contained in this report are based upon the results of field and laboratory testing, engineering analyses, and experience with similar soil conditions, structures and our understanding of the proposed project. PROPOSED CONSTRUCTION The project as we understand it is to construct a single -story slab on grade carwash building ranging in plan dimensions from approximately 3,500 square feet to 4,000 square feet. The building will be constructed with load bearing masonry walls and steel framed members having assumed wall and column loads on the order of 1 to 4 kips per lineal foot and 15 to 150 kips, respectively. The project also will have associated parking and driveway areas as depicted on the enclosed site plan. We assume that finished floor elevation will at or slightly above existing site grades. TABLE OF CONTENTS Page No. Letterof Transmittal.....................................................................................................I INTRODUCTION............................................................................................................................. 1 PROPOSEDCONSTRUCTION..................................................................................................... 1 SITEEXPLORATION..................................................................................................................... 2 FieldExploration................................................................................................................... 2 LaboratoryTesting................................................................................................................ 2 SITECONDITIONS......................................................................................................................... 3 SUBSURFACECONDITIONS....................................................................................................... 3 SoilConditions...................................................................................................................... 3 Field and Laboratory Test Results........................................................................................ 4 Swell - Consolidation Test Results....................................................................................... 4 GroundwaterConditions....................................................................................................... 5 ENGINEERING ANALYSES AND RECOMMENDATIONS.......................................................... 6 Geotechnical Considerations................................................................................................ 6 Foundation Systems - Conventional Type Spread Footings ................................................ 6 Lateral Earth Pressures........................................................................................................ 8 SeismicConsiderations........................................................................................................ 8 Floor Slab Design and Consideration................................................................................... 8 Pavement Design and Construction..................................................................................... 9 Earthwork.............................................................................................................................. 9 General Considerations............................................................................................ 13 SitePreparation........................................................................................................ 13 SubgradePreparation............................................................................................... 14 Fill Materials and Placement..................................................................................... 14 Excavation and Trench Construction........................................................................ 15 Additional Design and Construction Considerations.......................................................... 16 Exterior Slab Design and Construction..................................................................... 16 Underground Utility Systems.................................................................................... 16 SurfaceDrainage....................................................................................................... 17 GENERALCOMMENTS.............................................................................................................. 17 APPENDIX A Boring Location Diagram Logs of Borings APPENDIX B Laboratory Test Results APPENDIX C General Notes Geotechnical Engineering Report Proposed Car Wash Facility S/E/C of Mulberry Street and Lemay Avenue Fort Collins, Larimer County, Colorado Project No. 20065109 1rerrecon We appreciate being of service to you in the geotechnical engineering phase of this project, and are prepared to assist you during the construction phases as well. If you have any questions concerning this report or any of our testing, inspection, design and consulting services please feel free to contact us. Sincerely, TERRACON Christopher . Gemperline, Engineeri g Geologist Copies to: Addressee (4) David A. Richer, P.E. Geotechnical Enqinei iger August 15, 2006 Mr. John Agnew P.O. Box 827 Frisco, Colorado 80443 Re: Geotechnical Engineering Report Proposed Car Wash Facility — 2 % -Acre Parcel Southeast Corner of Mulberry Street and Lemay Avenue Fort Collins, Colorado Terracon Project No. 20065/09 Irerracon Consulting Engineers & Scientists Terracon Consultants, Inc. 301 North Howes Fort Collins, Colorado 80521 Phone 970.484.0359 Fax 970.484.0454 www.terracon.com Terracon has completed a geotechnical engineering exploration for the proposed car wash facility and associated pavement areas to be located on vacant tract of land situated at southwest corner of Mulberry Street and Lemay Avenue in Fort Collins, Colorado. This study was performed in general accordance with Terracon's Proposal No. D2006239, dated June 30, 2006. The results of our recenf engineering study for the proposed car wash facility including the boring location diagram, laboratory test results, test boring records, and geotechnical recommendations needed to aid in the design and construction of foundations, floor slabs, on -site pavement areas, and other earth connected phases of this project are attached. Test Boring Nos. 1 through 3 were drilled within the proposed building footprint, while Boring No. 4 was drilled within the proposed pavement area to be constructed north and east of the carwash building. The subsurface soils at the site consisted of an approximate 2 to 3 feet of overlot grading fill material underlain by native sandy lean clay and/or clayey sand, which extended to the granular stratum below. Silty sand with gravel was encountered at an approximate depth of 3 to 7-feet below existing site grades and extended to the depths explored, approximately 15-feet below existing site grades. Groundwater was not encountered during the initial field exploration and when checked several days after drilling dry cave in (DCI) measurements were recorded at approximate depths of 6 to 10'/z -feet below site grades. The results of our field exploration and laboratory testing completed for this study indicated the overlot fill material exhibits low to moderate swell potential when inundated with water and low to moderate bearing capabilities. However at this time, we do not possess adequate information regarding whether the fill was placed under controlled conditions to warrant placement of footings, floor slabs, or pavement sections on the fill material encountered without additional testing. The native cohesive soils and clayey sand soils exhibited low swell potential when inundated with water and low to moderate bearing capabilities. Based on the subsurface conditions encountered, the proposed car wash building could be supported by conventional spread footings bearing on the native subsoils, or on approved engineered fill material, which extends to the undisturbed subsoils below. . Conventional floor slab construction is feasible for the site provided the recommendations contained herein are followed. Other design and construction recommendations based upon geotechnical conditions are presented in the report. Delivering Success for Clients and Employees Since 1965 More Than 70 Offices Nationwide GEOTECHNICAL ENGINEERING REPORT PROPOSED CARWASH FACILITY — 2'/z -ACRE PARCEL SOUTHEAST CORNER OF MULBERRY STREET AND LEMAY AVENUE FORT COLLINS, COLORADO TERRACON PROJECT NO.20065109 AUGUST 15, 2006 Prepared for: MR JOHN AGNEW P.O.BOX 827 FRISCO, COLORADO 80443 Prepared by: Terracon 301 North Howes Street Fort Collins, Colorado 80521 Irerracon