Loading...
HomeMy WebLinkAboutREPEAT BOUTIQUE - PDP - 13-07 - CORRESPONDENCE -/ /07] Please provide a landscape plan showing existing landscaping and any proposed I scaping so that we can be sure it meets code requirements. Number: 5 Created: 5/23/2007 [5/23/07] Planning objectives letter states that most current use was a boarding house. The most current use was a spa/salon. We're ready to schedule your hearing. Please call me to set up a date and I will get the notification out. After the hearing, you'll need to submit final plans for review. We'll make sure the turnaround time for that is very short, probably one week. Contact me for a routing sheet so you'll know how many copies to submit. Be sure and return your redlined plans at that point. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6206. Sincerely, ;;1*1enJ5?Wn Anne H. Aspen City Planner Page 3 Number: 12 Created: 6/6/2007 [6/6/07] Please add the following construction details to the site plan which are from the Larimer County Urban Area Street Standards. These are available from Larimer County Engineering's website in PDF format. Drawing 2501 (Sidewalk Widening Details), Drawing 1601 (Standard Sidewalk), Drawing 1602 (Sidewalk Detail), Drawing 1603 (Access Ramp Details), Drawing 1607 (Truncated Dome Warning for Access Ramps). Number: 14 Created: 6/6/2007 [6/6/07] Please see redlined comments from Technical Services regarding the legibility of the plan set, which they bring up as a concern when the plans are scanned. Number:15 1 Created: 6/6/2007 [6/6/07] The sidewalk and access ramp construction will require payment of inspection fees prior to beginning any construction. In lieu of a Development Construction Permit (DCP) with its associated DCP fee, the inspection fee will be assessed under an excavation permit (reduced fee). The excavation permit will be determined at the time the plans are completed. Department: Light & Power Issue Contact: Janet McTague Topic: General Number: 1 Created: 5/18/2007 [5/18/071 no comments Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 13 Created: 6/6/2007 [6/6/07] PFA has no comments or concerns at this time. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 6 Created: 6/4/2007 [6/4/07] No comments. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 7 Created: 6/5/2007 [6/5/07] Show the two water services (domestic and irrigation) on the site and landscape plans, and adjust location of any new landscaping to meet required separation distances. Department: Zoning Issue Contact: Jenny Nuckols Topic: ZONING Number: 2 Created: 5/23/2007 [5/23/07] Note - the sign for the handicap space needs to also note that it is van accessible. umber: 3 Created: 5/23/2007 5/23/07] Planning Objective letter states that there will be a small parking area on the east side but I don't see any place that is accessible to park. If it is the area called out as existing agstone that won't work for parking. Please clarify. Number: 4 Created: 5/23/2007 Page 2 STAFF PROJECT REVIEW City of For( Collins LAURA M GREEN Date: 06/06/2007 3612 SODERBURG DR P*aA�al r„ 105L- FT COLLINS, CO 80526 "� Staff has reviewed your submittal for REPEAT BOUTIQUE 1502 S COLLEGE AVE - PDP - TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Topic: General Issue Contact: Anne Aspen The Post Office will continue to service this site as they have been doing. At the staff review, I provided you with a list of codes that the Building Department will use when reviewing this project for building permit approval. I encourage you to submit your plans to them as soon as possible so that they will be in the queue right after the hearing so they can be reviewed promptly assuming the hearing is successful. Number: 9 Created: 6/6/2007 [6/6/07] Lighting fixtures must meet the standards in Section 3.2.4 of the Land Use Code: they must be down -directional and fully shielded. This can be accomplished with the proposed fixtures if opaque panels are affixed behind the glass to limit glaring light spill. Department: Engineering Topic: General Number: 8 Issue Contact: Marc Virata Created: 6/5/2007 [6/5/07] As a heads -up, the right-of-way dedication for College Avenue will require a Transportation Development Review Fee of $250. In addition, recording fees will be assessed (payable to Larimer County) for the filing of the document. I can provide the standard right-of-way form for dedication electronically if desired. Also, a Transportation Development Review Fee of $1,000 is required at the time of final plan submittal. Number: 10 Created: 6/5/2007 [6/5/07] Please provide the following note on the site plan: "Damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. The limits of the repairs will be identified in the field by the City Engineering Inspector prior to and over the course of the project and will not be shown on the plans. All sidewalk work shall be complete prior to the issuance of the first Certificate of Occupancy." Number: 11 Created: 6/6/2007 [6/5/07] Was the access ramp location along Lake Street verified with Traffic Operations? If not, I may need to follow up with Eric Bracke. I have a concern that the handicap space might be too close to the College Avenue intersection. Eric is out this week. If this location hasn't been verified, perhaps a general note can be put on the plans specifying the handicap space and access ramp location is to be finalized with Traffic Operations, the location may be shifted in the field from the location shown on the plans. Page 1