Loading...
HomeMy WebLinkAbout3425 S. SHIELDS ST. MIXED-USE - PDP - 28-07 - REPORTS - TRAFFIC STUDYi uj Existing RI/RO N TS Access to Shields 1st-3,680 SF Specialty Retail 2nd-3,680 SF Office 3rd-3,680 SF Office 3 Stories ` 11,040 SF Total 3—Story Ir I 12 Unit I•. Residential with M v• 4 Garage Spaces - -a ..95 . t UI I N d 0 1 N N O N � N � Existing Full —Movement Access to Richmond 1st-3,680 SF Specialty Retail 2nd-3,680 SF Office 3rd-3,680 SF Office ' 3 Stories 11,040 SF Total Figure 2: Site Plan 'S D E —Page 3— 1 "=200' Original Scale e Figure 1: Vicinity Map I Exist RIRO Access To Remain i qN * , Exist Raised Center Median to Remain Cunningham j.: Close Exist Access Project Siteam 19 i 7. cgs__' vp�_ Exist Full -movement Access to Remain —'r-, Richmond 1. Richmond Horsetooth !� Mowo L mks L 22. N 1.0 Introduction The purpose of this Intermediate Traffic Impact Study (TIS) is to identify project traffic generation characteristics, to identify potential traffic related impacts on the adjacent street system, and to develop mitigation measures required for identified traffic impacts. This TIS is for the proposed mixed -use development located in the northwest comer of the Shields Street and Richmond Drive intersection (3425 S. Shields Street, Fort Collins, CO 80526). The Vicinity Map illustration and project site location is shown in Figure 1. The scope of this study determined the study intersections for the TIS to include: Shields. and Richmond, and all access drives. The Transportation Impact Study Base Assumptions form is provided in Appendix A. Development Engineering Sciences (DES), LLC has prepared the TIS to document the results of anticipated traffic conditions in accordance with the Lanmer County Urban Area Street Standards (revised on 4/1/07). The proposed development is anticipated to include approximately: 36 townhomes„ 15 KSF of general office, and 7.5 KSF of specialty retail. The current site plan illustrating the proposed development and access locations are shown in Figure 2. The project is anticipated to generate approximately 708 daily weekday trips, 43 AM peak hour trips, and 62 PM peak hour trips. Access to the site will be from an existing full -movement access to Richmond Drive and an existing right-in/right-out (RI/RO) access to Shields Street. The existing full - movement access to Richmond is located approximately 190 feet (centerline to centerline) west of the Shields and Richmond intersection. Additionally the Shields and Richmond intersection is a full -movement intersection located approximately 520 feet (centerline to centerline) north of the Shields and Horsetooth intersection. The site's other access is an existing RI/RO access to Shields Street which is access controlled by an existing raised center median in Shields Street. See the Vicinity Map and access descriptions in Figure 1. TABLE OF CONTENTS (continued) List of Figures: Figure 1: Vicinty Map 2 Figure 2: Site Plan 3 Figure 3: Existing Peak Hour Traffic 6 Figure 4: Trip Distribution 11 Figure 5: Site Generated Peak Hour Traffic 12 Figure 6: Background (2010) Peak Hour Traffic 13 Figure 7: Short Range (2010) Peak -Hour Traffic 14 List of Tables: Table 1: Trip Generation 8 Table 2: Existing Peak Hour Operation 15 Table 3: Background (2010) Peak Hour LOS Operation 15 Table 4: Short Range (2010) Peak Hour LOS Operation 15 Appendices: Appendix A: TIS Base Assumptions Form Appendix B: Traffic Counts Appendix C: LOS Descriptions and Fort Collins LOS Standards Appendix D: Transfort Route 6 Route Map Appendix E: HCS 2000 Calculations Appendix F: Pedestrian and Bicycle LOS Worksheets TABLE OF CONTENTS 1.0 Introduction 2.0 Existing Conditions 2.1 Existing Roadway Network 2.2 Existing Site Land Uses and Access . 2.3 Existing Traffic Volume 2.4 Existing Operation 2.5 Existing Pedestrian and Bicycle Facilities 2.6 Existing Transit Facilities 3.0 Proposed Development 3.1 Trip Generation 3.2 Trip Distribution 3.3 Traffic Assignment 3.4 Short Range Total Peak Hour Traffic. 4.0 Traffic Operations Analysis 4.1 Analysis Methodology 4.2 Intersection and Access Drive Operational Analysis. 4.3 Traffic Signal Warrants 5.0 Multimodal Transportation Facilities . 5.1 Pedestrian and Bicycles Facilities 5.2 Transit Facilities 6.0 Conclusions . Page # 1 4 4 4 5 5 5 7 7 7 9 9 9 9 9 10 10 16 16 16 16 Traffic impact Study 3425 S. Shields Street, Fort Collins, CO 80526 Prepared For: BCS, LLC 1643 Dogwood Court Fort Collins, CO 80525 Prepared By: Development Engineering Sciences, LLC 708 N. Fox Hill Road, Flagstaff, AZ 86004 970.381.3813 phone 928.527.7522 fax June 2007 38650 ; o 0 w S/0NAL Dr=SA Development Engineering Sciences, LLC 708 N. Fox Hill Road, Flagstaff, AZ 86004 970.381.3813 phone 928.527.7522 fax This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization from Development Engineering Sciences, LLC shall be without liability to Development Engineering Sciences, LLC.