Loading...
HomeMy WebLinkAboutWATERFIELD THIRD FILING - PDP - PDP130037 - CORRESPONDENCE - (5)drawings and nowo on Shts OU1 and U1 to indicate connection Lo the ELCO main in the vicinity of the cul-de-sac on Mandarin Drive. Department: Zoning Contact: Ali van Deutekom, 970-416-2743, avandeutekom,@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/27/2013 11/27/2013: No comments Comment Number: 8 Lomment Originated: 01/08/2014 01/08/2014: City is unable to allow the 3/4 movement on New Vine at Cape Teal. The eastbound left at Merganser requires most of the space between Merganser and Cape Teal. Inadequate space remains for a westbound left at Cape Teal. City is acceptable with it as a Ri/Ro access. Needs to be revised before Hearing. Comment Number: 9 Comment Originated: 01/08/2014 01/08/2014: Please revise the Eb & Wb left turn lane designs on new Vine @ Merganser, the EbL @ Existing Timberline (interim) and the NbL on existing Timberline @ new Vine per the emailed details. Call Ward Stanford (970-221-6820) with any questions or concerns. Can be done at FDP. Department: Water -Wastewater Engineering Contact: Eric Garner, , Topic: General Comment Number: 1 Comment Originated: 11/26/2013 11/26/2013: Sheet EX2: Existing District infrastructure is incorrectly labeled. The existing BSD sanitary sewer is 10-inch diameter (106) , not 8-inch diameter (86) Comment Number: 2 Comment Originated: 11/26/2013 11/26/2013: Sheet EX2: Label existing District manholes using District labels. Beginning at northernmost manhole (PDI 0820), and decline in increments of ten (10) to the final southwest manhole located north of Vine Drive (PDI 0750). Please let me know if clarification is needed. Comment Number: 3 Comment Originated: 11/26/2013 11/26/2013: Sheet DE3: The existing District sanitary sewer crossing Vine Drive is 16-inch diameter, not 12-inch diameter shown. Comment Number: 4 Comment Originated: 11/26/2013 11/26/2013: Sheet OU1: Coordinate callouts of existing District sanitary sewers with previous comments; 10-inch and 12-inch. Sheet OU1 indicates 8-inch, 10-inch, and 15-inch. Comment Number: 5 Comment Originated: 11/26/2013 11/26/2013: The District has more than adequate treatment plant capacity to service the property referenced above. Any written agreements required to complete sanitary sewer connections to the property will be completed subsequent to the land approval process. Comment Number: 6 Comment Originated: 11/26/2013 11/26/2013: The District is a participant in the region's 208 Water Quality Planning Association. The District is in full compliance with applicable federal and state water quality requirements. Comment Number: 7 Comment Originated: 11/26/2013 11/26/2013: If there are questions, please contact meat 970-498-0604. Thank you. Sincerely, Eric Garner, P.E. District Engineer Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: General Comment Number: 8 Comment Originated: 11/27/2013 11/27/2013: Water service in this area is provided by the ELCO Water District. Revise the Comment Num►..,.: 42 „umment Originated: 12/04/2013 12/04/2013: There are text over text issues. See redlines. Comment Number: 43 Comment Originated: 12/04/2013 12/04/2013: The outer boundary distance along Timberline Road does not match the Waterfield P.U.D. First Filing. See redlines. Comment Number: 44 Comment Originated: 12/04/2013 12/04/2013: Please label the line marked running parallel to Timberline Road on sheets 7 & 9. See redlines. Comment Number: 45 Comment Originated: 12/04/2013 12/04/2013: All centerlines must have bearings & distances and/or curve data. Comment Number: 46 Comment Originated: 12/04/2013 12/04/2013: All street & alley rights of way must show the width. Comment Number: 47 Comment Originated: 12/04/2013 12/04/2013: Please show the record distance at the east end of Outlot A on sheet 9. See redlines. Comment Number: 48 Comment Originated: 12/04/2013 12/04/2013: Please switch the bearings and distances marked on sheet 9. See redlines. Comment Number: 49 Comment Originated: 12/04/2013 12/04/2013: Please show the east right of way line of Timberline Road on sheets 7 & 9. See redlines. Comment Number: 50 Comment Originated: 12/04/2013 12/04/2013: Please show Conifer Street across Outlot A on sheet 10. See redlines. Topic: Site Plan Comment Number: 11 Comment Originated: 12/02/2013 01/13/2014: There are still issues on sheets 2 & 3. See redlines. 12/02/2013: There are line over text issues on sheet 2. See redlines. Comment Number: 51 Comment Originated: 01/13/2014 01/13/2014: Please match the titles between the index and sheet 7. See redlines. Comment Number: 52 Comment Originated: 01/13/2014 01/13/2014: Please mask all text within hatching on sheets 2 & 3. See redlines. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcqov.com Topic: Construction Drawings Comment Number: 6 Comment Originated: 11/26/2013 01/08/2014: Comment continued for reference. Change can be made at FDP stage. 11/26/2013: New Vine Drive and also New Timberline Drive P&P sheets: Please design the median noses to conform to LCUASS Standard Drawing 801. Can be done at FDP. Comment Number: 7 Comment Originated: 11/26/2013 01/08/2014: Continued for reference. 11/26/2013: No Signing and Striping Plans. Ok to provide at FDP stage. a Comment Number: 26 Comment Originated: 12/04/2013 12/04/2013: Waterfield P.U.D. Second Filing. shows a Public Service Co. easement. Is it to be vacated ? If so please show it on sheet 3 and provide an acknowledgement block for PSCO. If not, show it on sheets 4 & 5. Comment Number: 27 Comment Originated: 12/04/2013 12/04/2013: Please adjust the outer boundary shown along Vine Drive on sheet 3. See redlines. Comment Number: 28 Comment Originated: 12/04/2013 12/04/2013: Rights of way shown on sheet 3 as being vacated by the Plat, must be vacated by City Council action. Comment Number: 29 Comment Originated: 12/04/2013 12/04/2013: Please change all "Vine Drive" for the proposed realignment to "New Vine" Drive (Final Name To Be Determined By City Council By Resolution). See redlines. Comment Number: 30 Comment Originated: 12/04/2013 12/04/2013: Please change "Outlot A" to "Outlot B" on sheet 3. See redlines. Comment Number: 31 Comment Originated: 12/04/2013 12/04/2013: Outer boundary bearings & distances would be helpful as an overview on sheet 3, along with ties to section corners & section lines. See redlines. Comment Number: 32 Comment Originated: 12/04/2013 12/04/2013: Please add a key map to sheets 4-10. Comment Number: 33 Comment Originated: 12/04/2013 12/04/2013: Please show the sidelines on all easements. See redlines. Comment Number: 34 Comment Originated: 12/04/2013 12/04/2013: All easements must be dimensioned and locatable. See redlines. Comment Number: 35 Comment Originated: 12/04/2013 12/04/2013: Please add marks for all point of tangency. See redlines. Comment Number: 36 Comment Originated: 12/04/2013 12/04/2013: Please add bearings & distances to all lot lines. See redlines. Comment Number: 37 Comment Originated: 12/04/2013 12/04/2013: All existing streets must show dedication information. Comment Number: 38 Comment Originated: 12/04/2013 12/04/2013: Street names need to be shown on all sheets. See redlines. Comment Number: 39 Comment Originated: 12/04/2013 12/04/2013: Please label all surrounding subdivisions. See redlines. Comment Number: 40 Comment Originated: 12/04/2013 12/04/2013: Please label & describe the aligout corners. See redlines. Comment Number: 41 Comment Originated: 12/04/2013 12/04/2013: Is there non continuity in the curves on sheet 6? See redlines. Topic: Landscape Pla,.a Comment Number: 9 Comment Originated: 12/02/2013 01/13/2014: There is aline over text issue on sheet 7. See redlines. 12/02/2013: There are line over text issues on sheets 3, 4 & 5. There are many more issues than what is marked. Removing the contours would clean these sheets up a lot. See redlines. Topic: Plat Comment Number: 13 Comment Originated: 12/04/2013 12/04/2013: Please remove "P.U.D." from the title on all sheets. Comment Number: 14 Comment Originated: 12/04/2013 12/04/2013: Please add "A Portion Of" to the sub -title on all sheets. See redlines. Comment Number: 15 Comment Originated: 12/04/2013 12/04/2013: Please add "except the south xx' of the East Vine Drive right of way" to the legal description. See redlines. Comment Number: 16 Comment Originated: 12/04/2013 12/04/2013: Please revise the legal description. See sheet 3. Comment Number: 17 Comment Originated: 12/04/2013 12/04/2013: The boundary & legal description close. Comment Number: 18 Comment Originated: 12/04/2013 12/04/2013: Please check the next to last call in the boundary. The legal description & plat do not match for the distance. See redlines. Comment Number: 19 Comment Originated: 12/04/2013 12/04/2013: Please provide current acceptable monument records for the aliqout corners shown on the Plat. Comment Number: 20 Comment Originated: 12/04/2013 12/04/2013: If you are vacating Boxelder's easement (Reception #98090191), an acknowledgement and signature from them will be necessary. Comment Number: 21 Comment Originated: 12/04/2013 12/04/2013: If you are vacating Poudre School District's drainage easement (Reception #98094713), an acknowledgement and signature from them will be necessary. Comment Number: 22 Comment Originated: 12/04/2013 12/04/2013: Please update the title commitment information as appropriate. Comment Number: 23 Comment Originated: 12/04/2013 12/04/2013: Please add a note for the ownership, maintenance and proposed usage ( i.e. easements) for all Tracts & Outlots. Comment Number: 24 Comment Originated: 12/04/2013 12/04/2013: Conifer Street should remain. See redlines. Comment Number: 25 Comment Originated: 12/04/2013 12/04/2013: Is the easement(as drawn in on sheet 3) dedicated by Waterfield P.U.D. Second Filing being vacated by this Plat? See redlines. need a 404 permit. This should be determined sooner than later. For the FDP please submit changes to the plans, escrow and report. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com 11/19/2013: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials. Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-21B-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 2 Comment Originated: 11/26/2013 01/10/2014: Per the meeting on 1/9/14, the PDP is ready for a public hearing. Please email a pdf of the LID revisions labeled on the drainage plan for our file prior to hearing. 11/26/2013: Please quantify how the site is meeting the LID requirements. List LID measures that are being proposed for the various sub -basins and preliminarily calculate the volume required and where these measures will be located. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 11/29/2013 11/29/2013: There is a "R" missing from sheets R20-R22 in the sheet index. See redlines. Comment Number: 2 Comment Originated: 11/29/2013 11/29/2013: Please change the benchmarks shown on sheet CS2 to Fort Collins benchmarks. The benchmarks on sheets CS1 & CS2 should match. See redlines. Comment Number: 3 Comment Originated: 11/29/2013 11/29/2013: There are line over text issues on several sheets. See redlines. Comment Number: 4 Comment Originated: 11/29/2013 11/29/2013: Please change all "Vine Drive" for the proposed realignment to "New Vine" Drive (Final Name To Be Determined By City Council By Resolution). See redlines. Comment Number: 5 Comment Originated: 11/29/2013 11/29/2013: There are text over text issues on several sheets. See redlines. Comment Number: 6 Comment Originated: 12/02/2013 12/02/2013: There is text on several sheets that needs to be rotated 180 degrees. See redlines. Comment Number: 7 Comment Originated: 12/02/2013 12/02/2013: There is cut off text on sheet R16. See redlines. Comment Number: 8 Comment Originated: 12/02/2013 12/02/2013: Please increase the size of the marked text on the cross sections. See redlines. Comment Number: 2 uomment Originated: 01/07/2014 01/07/2014: The plans are showing existing electric facilities. Have these been field located? Some of the facilities don't seem to be in the right locations. Please have the electric facilities field verified and shown on the plans. Comment Number: 3 Comment Originated: 01/07/2014 01/07/2014: The plans show relocating several electric vaults. Just an fyi, sometimes it's difficult to move these vaults without damaging them and most of the time the cable has to be removed and new cable pulled in. Therefore in some areas it maybe more cost effective to install new system and abandon some of the existing electric facilities. Just a fyi. Comment Number: 4 Comment Originated: 01/07/2014 01/07/2014: Any relocation or modification to existing electric facilities will beat the developers expense. Comment Number: 5 Comment Originated: 01/07/2014 01/07/2014: Developer will be responsible for Electric Capacity Fee, Building Site charges and any system modification charges where applicable. Comment Number: 6 Comment Originated: 01/07/2014 01/07/2014: Water services are not shown on the utility plans. Will these be stubbed near the lot line? If so, this can cause utility conflicts with vaults, streetlights and electric services. Light & Power would prefer the water services NOT be installed near the lot line. Comment Number: 7 Comment Originated: 01/07/2014 01/07/2014: Any commercial services for pumps, clubhouses, irrigation, etc. will require a C-1 Form and One -line diagram be submitted. Contact Light & Power Engineering @ 970-221-6700 with any questions. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, llynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 11/26/2013 11/26/2013: PRIOR COMMENTS All prior PFA comments have been addressed to this point. Comment Number: 2 Comment Originated: 11/26/2013 11/26/2013: GARGANEY DRIVE TRAVEL WIDTHS The proposed 14' travel lanes for Garganey Drive (on either side of median) may pose a problem for emergency vehicle access. If parking is to be allowed on Garganey, then the net available road width is insufficient to allow for fire apparatus movement and operations. Further review and discussion is needed. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 11/19/2013 12/31/2013: Erosion Control Plan was reviewed since it was present. The plan lacked 1) Sequence Chart 2) Phases for building such a large property. 117 Acres 3) addressing the steep slopes and high velocity water ditches with adequate BMPs. The plan also had a number of issues with the 1) Detail Sheets and 2) cluttered plans. Also a side note, the wetlands might The ECS also needs to address the removal of the Russian olives and how that will be mitigated for, in accordance with recent Land Use Code updates. Comment Number: 10 Comment Originated: 11/27/2013 11/27/2013: Please note that fugitive dust requirements from Larimer County may apply. Contact their Health Department for more information. Comment Number: 11 Comment Originated: 01/07/2014 01/07/2014: Environmental Planning is ready for a hearing. Comment Number: 12 Comment Originated: 01/08/2014 01/08/2014: Environmental Planning staff will also work with the applicants and Parks to see if there are additional options for plantings on the proposed park t6 the west of the wetland. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tuchanan@fcaov.com Topic: Landscape Plans Comment Number: 13 01/10/2014: Comment Originated: 01/10/2014 Please show stop sign locations and provide at least 20 feet between street trees and stop signs. Also avoid locating street trees very close to intersection corners. Provide some set back from corners for visibility. Separation between trees and driveways should be 8 feet. Comment Number: 14 01/10/2014: Comment Originated: 01/10/2014 Provide typical lot details that show street tree location in reference to utility separation standards, stop signs, streetlights and driveways. Comment Number: 15 01/10/2014: Comment Originated: 01/10/2014 Please add this landscape note it does not already exist. Minor Changes in species and plant locations may be made during construction as required by site conditions or availability of material. Overall quality and design concept shall be consistent with approved landscape plans. Any changes will be provided to the Landscape Architect and City of Fort Collins for review and approval. Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/07/2014 01/07/2014: Light & Power has a large major duct bank running along the North side of Vine Dr. adjacent to this site along with a 3-phase duct line running along the West side of Timberline Rd. There are also 3-phase electric facilities in Merganser Dr. that were installed in an earlier filing. Note that some of these facilities also serve the Bull Run Townhomes. Light & Power does have a small portion of overhead running along the East side of Timberline with the rest of the overhead in the area believed to be Poudre Valley REA. Comment NumL,-. uumment Originated: 11/26/2013 1/10/2014: As discussed with Cody from Northern Engineering it would be hepful to be provided with an exhibit or overall map showing what is intended to be vacated and what is intended to remain as well as how the legals will be prepared to hopefully save time and frustration. 11/26/2013: Some right of way that is existing should not be vacated and should remain. The right of way on Merganser, Conifer and the portion of Turnberry between conifer and New vine should remain. Per state statute it is very likely that most of the "Tract X on the plat will be given back to Bull Run once it has been vacated. We should discuss further how this project will approach this vacation, if at all. We will not support vacating the portion until Merganser is constructed and accepted. Perhaps the applicant would pursue a separate agreement or quick deed to transfer this land for Tract J. Comment Number: 6 Comment Originated: 11/26/2013 1/10/2014: Per the applicant the additional right of way along the west side of timberline is to be vacated by separate document after public hearing and will not affect the site plan significantly and will only be increasing the area of Tract along Timberline. 11/26/2013: Timberline is a 4 lane arterial per our master street plan so 115' of right of way is required and it appears the plat is dedicating right of way for a 6 lane arterial. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, Iex@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 11/27/2013 01/07/2014: Please change "Environmental Engineer° to Environmental Planner. 11/27/2013: Please add the Environmental Planner signature to the Utility Plans. Topic: General Comment Number: 4 Comment Originated: 11/27/2013 01/07/2014: The applicants did an excellent job addressing this comment -thank you! Staff concurs with the ECS recommendation to develop a long term management plan and weed management plan. This can be addressed further at final plan. 11/27/2013: 11/27/2013: The ECS for the project indicates the total wetland is 8.46 acres and 0.18 acres are proposed to be developed through the.project. The wetland is non -jurisdictional, per the ACOE letter, and only City regulations apply to this wetland. The applicants have proposed to mitigate the 0.18 acres of wetlands through upland enhancements. I've reviewed the ECS and the proposed plans and do think that the ecological value lost from the 0.18 acres of wetlands could be replaced through upland habitat enhancements, especially as the hydrology data from 2013 (and observations since the early 2000s) indicate the large wetland may be drying up. However, the plans as they are currently proposed need to provide a much higher level of buffering and vegetation enhancements to achieve the standards set forth in Section 3.4.1 of the Land Use Code. I've tried to graphically depict the areas where I think additional enhancements are necessary, but perhaps a meeting with the applicants, Cedar Creek Associates, and myself would be beneficial? Let me know if that would work for you. Comment Number: 21 Comment Originated: 01/13/2014 01/13/2014: For all pedestrian connections, please label each as "Pedestrian Connection" and state the width and surface treatment. These connections should be concrete. If asphalt is selected, then the edges need to be secured with concrete curbs. Comment Number: 22 Comment Originated: 01/13/2014 01/13/2014: On the Landscape Plan, in the legend, please add a symbol for Evergreen Trees. Please note that at Final, additional Evergreen Trees will be needed in the buffer yards. Comment Number: 23 Comment Originated: 01/13/2014 01/13/2014: On the plat, please provide a key map on pages 4 -10. Comment Number: 24 Comment Originated: 01/13/2014 01/13/2014: On the plat, please match the Site Plan and refer to "New Vine" Drive (Final Name to be Determined by City Council by Resolution.) Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: Construction Drawings Comment Number: 11 Comment Originated: 11/26/2013 1/10/2014: This will be discussed further at Final Compliance. 11/26/2013: Will the project be phased for construction? If so, how many and which portions will be phased? Comment Number: 14 Comment Originated: 11/26/2013 1/10/2014: Per conversations with Cody and Ward Stanford the 3/4 turn at Cape Teal and New Vine should be removed and only a right in right out. This should be shown on the site plan for hearing along with showing the ultimate right in right out at Garganey and Timberline on the Site plan. 11/26/2013: Please show the appropriate line work for the medians on New Vine and Timberline for the right in/right out and 3/4 turn lanes. Comment Number: 23 Comment Originated: 11/26/2013 1/10/2014: Please contact me to discuss what we would like to have specifically shown on these sheets. 11/26/2013: Sheet R1 -At final review we will need to see 4 Flowline profiles for timberline and new vine that includes both median flowlines and both outer roadway flowlines. Comment Number: 36 Comment Originated: 11/27/2013 1/10/2014: At final compliance please look at the tie-in to existing for Mandarin to ensure it will be able to intersect with Conifer as it crosses the Ditch. 11/27/2013: Sheet R19 -Dedicate right of way for Mandarin all the way to Conifer Street right of way. The roadway may be phased and only constructed to the cul de sac shown. However, do not build a formal cul de sac, construct the roadway and rollover curb as a normal street, end with a barricade and provide temporary turnaround outside of the rollover curb with temporary asphalt, road base, etc. The turnaround area may be dedicated as an access easement instead of the right of way as shown. Topic: Plat Comment Number: 2 Comment Originated: 11/26/2013 1/10/2014: As discussed with Cody from Northern Engineering it would be helpful to be provided with an exhibit or overall map showing what is intended to be vacated and what is intended to remain as well as how the legals will be prepared to hopefully save time and frustration. 11/26/2013: Right of Way may not be vacated by Plat. It will need to be vacated by separate document and go through City Council approval which includes two readings after the project has been approved through public hearing. City d shins F Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax tcgov. com/developmentreview January 13, 2014 Stephanie Sigler Ripley Design Inc. 401 W Mountain Ave. Fort Collins, CO 80521 RE: Waterfield Third Filing, PDP130037, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Current Planning Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 17 Comment Originated: 01/09/2014 01/09/2014: The six-foot wide trail that loops around the wetlands should be specified to be either concrete or a soft path featuring gravel or crusher fines. A highly used amenity would call for concrete. Amore naturalistic ambiance, however, would call for a soft surface. Staff would support either and the choice is up to the developer depending on how the usage of this trail is envisioned. Asphalt that is not contained within vertical concrete curbs will deteriorate and become an undesirable surface and become a maintenance liability. Comment Number: 18 Comment Originated: 01/09/2014 01/09/2014: Be sure to label the 10-foot wide community trail as being concrete. Comment Number: 19 Comment Originated: 01/09/2014 01/09/2014: Please label the irrigation lateral in the northeast area (Barker Lateral) as being re -located. Comment Number: 20 Comment.Originated: 01/09/2014 01/09/2014: Please add a table that lists the Tracts and state the purpose of each Tract. Also, please note that the Tract designations refer to the same designations as on the plat.