mounted HVAC system that will be concealed behind a
parapet wall so it won't be visible or audible at the ground
level. The residential units will have central air but we have
not designed the system yet. There will not be any window
units and the handlers will be concealed in some way.
20. Question: Will the buildings have elevators?
Answer: The commercial building will for ADA accessibility but the
residential units are not big enough to warrant the cost of
three elevators. ADA accessible units will be on the ground
level.
21. Comment: Chris Matkins: If you have any further questions, please feel
free to contact me on my cell phone, which is 231-9632.
Meeting concluded at about 7:30pm.
6
16. Question: I live in Chaparral. There is an existing fence between the
property and our neighborhood. Will it stay? Chaparral
residents are only allowed to build 4 1/2 foot tall fences per
our HOA. What else do you plan to do to buffer the project
from the neighborhood?
Answer: We plan to preserve the existing fence. It is about 6 feet tall.
It was in some disrepair so we went out and fixed a few
sections. We plan to reface one side of it at least when we're
done with construction. We will also be planting trees and
other landscaping per our plans. We will work directly with
the immediate neighbors both in Chaparral and to the south
to optimize the placement and type of plantings for each
impacted neighbor when we're further along. We designed
our site to buffer between the project and the existing
neighborhoods by placing the buildings more centrally to
provide a much greater distance from the property line that
we are required by the City. We also designed around a
couple of very large and healthy cottonwoods on the west
property line and a large existing conifer that is just to the
west of where the commercial building will be.
17. Question: Will the parking lot be asphalt or concrete?
Answer: Mostly asphalt though there may be some areas that will be
concrete for durability and easier maintenance.
18. Question: What are the Type II uses that will be allowed if approved
with this request?
Answer: Anne Aspen: Reading from the Land Use Code,
"(c) Commercial and Retail Uses:
1. Personal and business service shops.
2. Offices, financial services, clinics and small
animal veterinary clinics.
3. Restaurant, limited mixed -use."
19. Question: Do you know yet how you will handle air conditioning noise?
Answer: Not entirely. The commercial building will have a rooftop-
5
the summer and neighborhood grants. If you would like any
assistance with coordinating, you can call Ginny Sawyer at
(970)224-6046.
11. Comment: We're nervous because you're dealing with several million
dollars' worth of residential investments.
Response: We hope that our high -quality architecture and design will
enhance the value of the area.
12. Question: Will the project be phased? How?
Answer: The commercial building will be done first by a separate
builder and then later we will construct the residential
buildings.
13. Question: Do you have other examples of similar projects that have
been built?
Answer: We have built one other project out-of-state in South Dakota.
We don't have anything else locally and nothing with a
commercial component like this. My full-time job is as a
Civil Engineer, so I am very familiar with thee kinds of
projects and the engineering aspects in particular.
14. Comment: (from Chris Matkins): I'll describe what we envision —
probably more retail -oriented uses on the ground level of the
commercial building and then small offices for an insurance
office or accountants or the like on the upper floors.
15. Question: What can be done if a use goes in that is not allowed by the
approval?
Answer: Anne Aspen: The City inspects the property when it is built
to ensure that it was built according to the plans and
approvals, including a zoning inspection. If a violation of the
approval is suspected at a later date, any citizen can contact
the Zoning Department to request information and, if
warranted, a citation. A citation will be sent to the offending
party which will require compliance within a short period of
time, usually 2-4 weeks. If they do not comply, they are
charged up to $2000/day, which usually does the trick!
0
Answer: A Traffic Impact Study (TIS) was prepared for this proposal
by a licensed traffic engineer. The report included both the
Type I uses and the Type II commercial and retail uses.
Anne Aspen: City Staff is very aware of the difficulty of that
intersection and the surrounding street network. Many
years ago, before our current Land Use Code, the
neighborhoods around this site (Casa Grande, Chaparral etc)
developed without providing any street connectivity with this
site. Nowadays we would require that and it would be much
easier for this developer to provide good access. As it is,
there is no physical way to punch through an internal street,
so they've done the best they can and it meets the City's
traffic requirements.
8. Comment: If you advertise with the Collegian and get a lot of students,
the traffic patterns will really change and the Richmond to
northbound Shields movement will be used heavily.
9. Comment: Even if not students, won't most people want to head into
town and likely cut through the neighborhood?
Response: We really aren't marketing to students. We don't think this
project has the kinds of amenities students are looking for.
It's really aimed more for young professionals. And the cut -
through through the neighborhood is really the long way
around. Some might take it, sure, but it isn't the best
option.
10. Comment: During construction and after, the developer and new
neighbors could come to some of the neighborhood
association meetings and update us, get to know us. That
way, we can assess together what's working and what's not
and work together to solve any issues amongst ourselves.
Response: That's a great idea and would continue our efforts to engage
with existing neighbors. Before this required meeting, we
have held three other non -required meetings with the
neighborhood and associations. We will certainly make
efforts to follow through with this through construction and
with the new residents. Anne Aspen: The City has a
Neighborhood Services department that coordinates
neighborhood associations and HOAs throughout the City.
They're the ones who coordinate Neighborhood Night Out in
3
2. Question: What will the demographics of the new residents be?
Answer: No developer or realtor can control who rents or buys the
units, but we are appealing to middle and upper -middle
condo market with our high quality exterior materials and
colors.
3. Question: What will be the price of the units?
Answer: We plan to rent the units for the first few years and then sell
them. At the time we sell them, I imagine a 2-bedroom unit
would go for about $150,000 in today's dollars.
4. Question: Where will you advertise for renters?
Answer: We are working with a broker right now. Well also be
marketing with signs along Shields. I imagine will put ads in
the Coloradoan.
5. Question: I'm concerned about commercial lighting at night. How will
the light levels be managed?
Answer: We hired a professional lighting consultant who designed the
site lighting to meet the City's stringent standards for
lighting. Anne Aspen: The standards dictate that the light
levels be less than 0.1 footcandle of light past the property
line (for reference, the light that hits the ground from a full
moon is approximately 2.0 footcandles). The lighting fixtures
must be completely shielded and down -directional. The
consultant Chris chose is one of our best in town. He is very
sensitive to neighbors concerns.
6. Question: What about access on Shields?
Answer: The north access (on Shields) will be right -in -right -out only.
There is a raised median in Shields. The southern access
will be off of Richmond and through the full movement
intersection of Richmond and Shields.
7. Question: What if the renters are mostly students? They'll all want to
go north on Shields to CSU and at peak hours. The left
hand turn from Richmond onto Shields is nasty.
E
Planning, evelopment and Transportatio. )ervices
Planning and Zoning
NEIGHBORHOOD INFORMATION MEETING
PROJECT: 3425 S. Shields
DATE: January 9, 2008
APPLICANT: Chris Matkins, Wes Lamarque
CITY PLANNER: Anne Aspen
This is a request to add Type II commercial and retail uses to the approved
Type I project which is a redevelopment of an existing single family lot with
outdoor storage to a mixed -use project with one commercial building on
Shields and three 3-story residences behind. The property is located within the
City of Fort Collins and is zoned MMN—Medium Density Mixed -Use
Neighborhood.
The meeting started at about 6:35pm. After a general introduction by Anne
Aspen with an overview of the City's development review process, Chris
Matkins walked the audience through the proposal. Anne opened up the
meeting to a question and answer session. The following questions and
comments are those posed by audience members. Answers and responses
were provided by the applicant unless otherwise noted. There were seven
members of the public in attendance.
QUESTIONS, CONCERNS, COMMENTS, RESPONSES
1. Question: Will there be enough parking?
Answer: The project meets the City's parking ratios and minimum
requirements. All but four of the spaces needed for
residential parking are available in the rear portion of the
site near the residences. The remaining parking, closer to
Shields and the commercial building (all but four spaces) is
for the commercial building. There is a good opportunity for
shared parking for guests and overflow parking on weekends
since the commercial parking will be largely vacated at
nights and on weekends.