HomeMy WebLinkAbout3425 S. SHIELDS ST. MIXED-USE - PDP - 28-07 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY3—Story
12 Unit
Residential with
4 Garage Spaces
Existing Full —Movement
Access to Richmond
Figure 2: Site Plan
Existing RI/RO
Access to Shields
1st-3,680 SF Specialty Retail
2nd-3,680 SF Office
3rd-3,680 SF Office
3 Stories
11.040 SF Total
1st-3,680 SF Specialty Retail
2nd-3.680 SF Office
3rd-3,680 SF Office
3 Stories
11,040 SF Total
N TS
or_s.
—Page 3—
Figure 1: Vicinity Map
1 "=200'
Original Scale
4
A �
1
.11FAr
Protect Siteqw
,
t _
Exist RIRO Access To Remain i
Exist Raised Center Median to Remain
Cunningham
Close Exist Access
Exist Full -movement Access to Remain
- - �_'ir—
Richrrpnd t.
s,.
f 4.� r
� t�K-, t t y
t
v
t w r
1 11NtMYt„ � ►....!-�
Horsetooth
Richmond
• � � !it iri>arM _F
'� to =
A AS t A.
U_�Su J■ : itf fit:
■/ 1.0 Introduction
The purpose of this Intermediate Traffic Impact Study (TIS) is to identify project traffic
generation characteristics, to identify potential traffic related impacts on the adjacent
street system, and to develop mitigation measures required for identified traffic impacts.
This TIS is for the proposed mixed -use development located in the northwest corner of
the Shields Street and Richmond Drive intersection (3425 S. Shields Street, Fort Collins,
CO 80526). The Vicinity Map illustration and project site location is shown in Figure 1.
The scope of this study determined the study intersections for the TIS to include:
Shields. and Richmond, and all access drives. The Transportation Impact Study Base
Assumptions form is provided in Appendix A.
Development Engineering Sciences (DES), LLC has prepared the TIS to document the
results of anticipated traffic conditions in accordance with the Larimer County Urban
Area Street Standards (revised on 4/1/07). The proposed development is anticipated to
include approximately: 36 townhomes„ 15 KSF of general office, and 7.5 KSF of
specialty retail. The current site plan illustrating the proposed development and access
locations are shown in Figure 2. The project is anticipated to generate approximately
708 daily weekday trips, 43 AM peak hour trips, and 62 PM peak hour trips.
Access to the site will be from an existing full -movement access to Richmond Drive and
an existing right-in/right-out (RI/RO) access to Shields Street. The existing full -
movement access to Richmond is located approximately 190 feet (centerline to
centerline) west of the Shields and Richmond intersection. Additionally the Shields and
Richmond intersection is a full -movement intersection located approximately 520 feet
(centerline to centerline) north of the Shields and Horsetooth intersection. The site's
other access is an existing RI/RO access to Shields Street which is access controlled by
an existing raised center median in Shields Street. See the Vicinity Map and access
descriptions in Figure 1.
TABLE OF CONTENTS (continued)
List of Figures:
Figure 1:
Vicinty Map
Figure 2:
Site Plan
Figure 3:
Existing Peak Hour Traffic
Figure 4:
Trip Distribution
Figure 5:
Site Generated Peak Hour Traffic
Figure 6:
Background (2010) Peak Hour Traffic
Figure 7:
Short Range (2010) Peak -Hour Traffic
List of Tables:
Table 1: Trip Generation
Table 2: Existing Peak Hour Operation
Table 3: Background (2010) Peak Hour LOS Operation
Table 4: Short Range (2010) Peak Hour LOS Operation
Appendices:
Appendix A: TIS Base Assumptions Form
Appendix B: Traffic Counts
Appendix C: LOS Descriptions and Fort Collins LOS Standards
Appendix D: Transfort Route 6 Route Map
Appendix E: HCS 2000 Calculations
Appendix F: Pedestrian and Bicycle LOS Worksheets
2
3
6
11
12
13
14
8
15
15
15
TABLE OF CONTENTS
1.0
Introduction
_ 2.0
Existing Conditions
2.1
Existing Roadway Network
2.2
Existing Site Land Uses and Access .
2.3
Existing Traffic Volume
2.4
Existing Operation
(� 2.5
t�
Existing Pedestrian and Bicycle Facilities
2.6
Existing Transit Facilities
3.0
Proposed Development
3.1
Trip Generation
3.2
Trip Distribution
3.3
Traffic Assignment
3.4
Short Range Total Peak Hour Traffic,
4.0
Traffic Operations Analysis
4.1
Analysis Methodology
4.2
Intersection and Access Drive Operational Analysis
4.3
Traffic Signal Warrants
5.0
Multimodal Transportation Facilities .
5.1
Pedestrian and Bicycles Facilities
5.2
Transit Facilities
6.0
Conclusions
Page #
1
4
4
4
5
5
5
7
7
9
9
90
10
16
16
16
16
Traffic Impact Study
3425 S. Shields Street, Fort Collins, CO 80526
Prepared For:
BCS, LLC
1643 Dogwood Court
Fort Collins, CO 80525
Prepared By:
Development Engineering Sciences, LLC
708 N. Fox Hill Road, Flagstaff, AZ 86004
970.381.3813 phone
928.527.7522 fax
June 2007
38650
O •, W
S/ONAL
Dr=S9A
Development Engineering Sciences, LLC
708 N. Fox Hill Road, Flagstaff, AZ 86004
970.381.3813 phone
928.527.7522 fax
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific
purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization from
Development Engineering Sciences, LLC shall be without liability to Development Engineering Sciences, LLC.