Loading...
HomeMy WebLinkAbout1230 E. ELIZABETH STREET - MOD - 29-07 - CORRESPONDENCE - (5)Water Wastewater Contact Info: Roger Buffington, 221-6854, rbuffngton@fcgov.com 1. Existing mains: There is a 12-inch water main and an 8-inch sanitary sewer in Elizabeth. 2. Water conservation standards for landscape and irrigation will apply to this project. 3. Development fees and water rights will be due at time of building permit issuance. Natural Resources Contact Info: Dana Leavitt, 224-6143, dleavitt@fcgov.com 1. Your trash enclosure needs to be designed to accommodate recycling services. Please consult the City of Fort Collins Design Considerations Guidance Document at http://www.fcgov.com/recycling/adf/enclosure-guidelines08O4.pdf to determine the size and appropriate design for your enclosure. 2. Please contact Tim Buchanan (City Forester) at 221-6360 if any trees will be removed. Mitigation may be required. 3. Please consider using Fort Collins native plant species for any proposed landscaping. A plant guide may be found at hftp://fcqov.com/naturalareas/native-plants.PhD 4. Please consider'green solutions' to water quality issues such as green (sedum) roofs and bio-swales for landscaping islands with in the parking lot. 11 3. Please coordinate the location of the transformer with me. It must be located within 10 feet of a paved surface. . 4. A C-1 form and a one -line diagram will need to be submitted with this project. 5. Normal development fees apply, including electric capacity fees and building site charges. Stormwater Utility Contact Info: Glen Schlueter, 221-6700, gschlueter@fcgov.com 1. The design of this site must conform to the drainage basin design of the Spring Creek Drainage Master Drainage Plan as well the City's Design Criteria and Construction standards. 2. The city-wide development fee is $3,070/acre ($0.0705/sq.ft.) for new impervious area over 350 sq.ft. No fee is charged for existing impervious area. This fee is to be paid at the time the building permit is issued. 3. A drainage and erosion control report and construction plans are required. These must be prepared by a Professional Engineer registered in Colorado. 4. Onsite detention is required with a 2-year historic release rate for water quantity. Eextended detention is required for water quality treatment only if there is an increase in imperviousness greater than 1000 square feet. Parking lot water quantity detention can is allowed in the parking lot up to a foot of depth. Poudre Fire Authority Contact Info: Carle Dann, 416-2869, cdann@ poudre-fire.org 1. Ensure that your addressing is visible from Elizabeth using at least 6-inch high numerals on a contrasting background. 2. The project needs to be within 300 feet of a fire hydrant capable of delivering 1500psi water at 20psi residual pressure. 3. An emergency access easement with a minimum fire lane width of 20 feet may need to be dedicated on the plat with this project, depending on the ultimate site plan. 4. If a fire lane is required, it shall be delineated with painting and signage, and maintained unobstructed. Contact Carie for more detail. 5. A hazardous materials form must be completed and submitted to both PFA and the Planning Department to document any toxic, corrosive, or reactive materials or flammable or combustible liquids used, stored or handled on site. 5 Engineering Contact Info: Susan Joy, 221-6605, sjoy@fcgov.com 1. Larimer County Road Impact Fees and a City Street Oversizing Fee will apply. Fees vary by use. Contact Matt Baker at (970) 224-6605 for an updated estimate of the fees. 2. Transportation Development Review Fees (TDRF) will apply to this project. For more information, see http:/tfcgov.com/engineering/dev-review.php 3. A Transportation Impact Study will need to be submitted for this project. Contact Eric Bracke at (970) 224-6062 to discuss the scope for this project. 4. Elizabeth is a 2 lane collector. Three to eight feet of ROW will need to be dedicated depending on whether it is a major (with street parking) or minor (without street parking) collector. The parking was removed along the property due to the crosswalk and the proximity of the adjacent driveways. Allowing parking would block sight distance. Parking needs to be at least 5' from a driveway and 15' either side of a crosswalk. If there is a desire to remove the crosswalk, you could probably gain one parking space, perhaps two. As for the utilities and traffic signs, they can be adjusted at your expense. Please let me know if you wish to pursue either of these options. 5. All public improvements must be made according to Larimer County Urban Areas Street Standards (LCUASS) which can be found on the City's website at: hftp://fcgov.com/engineedng/street-standards.php. 6. Section 19-6 of LCUASS lists the required parking setbacks. Depending on the TIS calculations of average daily trips (ADTs), you will need to provide a 50-foot setback from the flowline of Elizabeth with ADTs up to 750, 60-foot setback if ADT's over 750. 7. Utility plans, a development agreement, a development construction permit (DCP) and a plat will need to be prepared for this project. 8. No footings or overhangs are allowed to encroach in easements. Please plan accordingly. Transportation Planning Contact Info: Dave Averill, 416-2643, daverill@fcgov.com (not present at meeting) 1. The sidewalk along Elizabeth is in a school walk area so it is substandard. You can either replace it with a detached walk or widen the existing walk to at least a 7-foot attached walk. 2. Please provide at least 5% of the total number of parking spaces provided for bike parking in a location convenient to the main entries. 3. Where there is head -in parking abutting a sidewalk, the sidewalk needs to be at least 6 feet wide to account for vehicle overhang. 4 Be sure to include handicap accessible ramps in your submitted plans. Light and Power Contact Info: Janet McTague, 224-6154, jmctague@fcgov.com 1. Existing single-phase service is located at the rear property line and is shared with 1236 Elizabeth. It can probably be sized to accommodate the new building. Any relocation or modifications to the existing service will be at your expense. To change to the next size up would be about $600. 2. There is no 3-phase service close to the property. The closest source for 3- phase is on McHugh. If you need 3-phase service, you will need to extend the service from McHugh to your property which is likely to be expensive, perhaps around $10,000. 4 4. According to the sketch plan presented at conceptual, you will need 3 modifications of standard: • Connecting walkway standard in Section 3.5.3 (13)(1) • Build -to line in Section 3.5.3(B)(3), and • Parking standard in Section 3.2.2(K)(2) Of the three, I think the parking standard may be the easiest case to prove: medical offices in particular are typically short on parking. I also understand the situation with the neighboring businesses, though on a site visit at 10:30am on a weekday, at least half of the parking spaces in neighboring parking lots were vacant. Given that this is a vacant parcel of land, it will also be a tough sell to the Hearing Officer that it is not possible to orient to the street and provide a connecting walkway. I encourage you to explore creative alternative site plans with a designer that might come closer to meeting at least some of these standards. If after a thorough exploration of possibilities you are unable to come up with a site plan that meets one or all of these standards, you will need to request a modification of standards for each standard you cannot meet. The modification of standards process and criteria are spelled out in Section 2.8.2(H) of the Land Use Code. Essentially, you will write a letter requesting the modification explaning your rationale within the framework of Section 2.8.2(H). Please contact me if you need a similar letter from another project to use as a template. 5. Please provide contextual information on your site plan including the existing striping and crosswalk on Elizabeth in front of your site, the existing pad - mounted utility, the existing street light and the context of neighboring properties —show approximately 20 feet of all abutting property including parking, landscaping areas or building location, like you have done for the Anesthesiology building to the east. 6. This project needs to be architecturally compatible with the surrounding uses. Similar materials and colors should be used per Section 3.5.1 of the Land Use Code. Additionally, the project will be subject to the building standards of Section 3.5.3 for Commercial buildings, including fagade and base and top standards. 7. You will need to submit a lighting plan for this project, showing cut sheets for the lighting fixtures chosen. All lighting must meet the standards contained in Section 3.2.4 of the Land Use Code, including down -directional, fully shielded fixtures. 8. 1 will have more detailed comments once I have more detailed plans to review. 9. Contact me if you have any questions about the code requirements or submittal requirements, which can be found at: hftp://fcgov.com/currentplanning/pdf/project-dev-plan.pdf. 10. You will need to set up an appointment to submit your application with the Development Review Counter at 221-6750. Incomplete submittals will not be accepted. 3 ITEM: 3000sf dental office at 1230 E. Elizabeth MEETING DATE: June 4, 2007 APPLICANT: Dan Bernth LAND USE DATA: Request to develop a vacant parcel at 1230 E. Elizabeth into a 3,OOOsf, one-story office building. The property is within the City of Fort Collins and is zoned E—Employment District. COMMENTS: The following departmental agencies have offered comments for this proposal based on the sketch plan presented to the review team: Zoning Contact Info: Gary Lopez, 416-2338, glopez@fcgov.com 1. Office is a permitted uses in the E—Employment District, subject to a Type 1 (Administrative) Review. 2. Commercial parking requirements are maximums. Requirements can be found in Section 3.2.2 (K). You are required to provide no more than 4.5 spaces per 1000sf of office space or 18 spaces. You'll need to provide a van accessible handicap parking space and adequate handicap accessible parking. If more parking is desired, you will need to seek a modification to this standard or request alternative compliance as spelled out in Section 3.2.2(K)(3) or request an exception as spelled out in Section 3.2.2(K)(4). Current Planning Contact Info: Anne Aspen, 221-6206, aaspen@fcgov.com 1. The entire Fort Collins Land Use Code (LUC) is available for your review on the web at htta://www.colocode.com/ftcollins/landuse/begin.htm 2. This development proposal is subject to all applicable standards of the Fort Collins Land Use Code (LUC) and specifically Article 3 General Development Standards, and Division 4.22 E—Employment District Standards. 3. Please refer to Section 3.2.1 Landscaping and Tree Protection of the Land Use Code (LUC) for landscape planning and design standards. You'll need to provide street trees, foundation plantings and parking lot perimeter and possibly internal landscaping. Any parking stalls facing a property line will need to be screened unless they face parking spaces on the abutting property. Be aware of any sight distance triangles needed. E Commui..y Planning and Environmental S vices Current Planning &ma,V-eo1 #IV City of Fort Collins 11 June 2007 Via email to: Dan Bemth at danbemth@fdi.com Dan: For your information, attached is a copy of the Staffs comments for a proposed one- story office building at 1230 E. Elizabeth, which was presented before the Conceptual Review Team on June 4th, 2007. These comments are informally offered by staff to assist you in preparing the detailed components of a project application. Modifications and additions to these comments may be made at the time of formal review of this project. The City's Current Planning Department coordinates the development review process. I am the Project Planner for your project. I will be commenting as well as coordinating the process. If you have any questions regarding these comments or the next steps in the review process, please feel free to call me at 970-221-6206. Sincerely, Anne ~HAspen/�r City Planner cc: Project File Project Planner cc: (via email): Gary Lopez Susan Joy David Averill Carle Dann Janet McTague Glen Schlueter Roger Buffington Dana Leavitt 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020