HomeMy WebLinkAboutMOUNTAIN VIEW COMMUNITY CHURCH - FDP - 31-07/A - CORRESPONDENCE -Note has been added to the Landscape Plan.
Please let us know if you have any other issues.
Sincerely,
Sandy McFeron
Project Manager
V.F. Ripley Associates, Inc.
Kevin Brazelton
Project Engineer
Northern Engineering Services
4. For the benefit of the P.R.P.A., please add the following note to the
Landscape Plan:
"Vegetation within the 60 foot wide P.R.P.A. easement shall be limited to
Ornamental Trees only. Further, no species that exceeds a height of
greater than 15 feet at maturity will be allowed within the P.R.P.A.
easement. And, no shrubs shall be planted within a 25 foot wide radius of
the electrical power line support structure.
Note has been added to the Landscape Plan.
"Shade trees that are planted outside the P.R.P.A. easement shall be
setback from the easement a sufficient distance as to clear the low point of
the power line in the event that the tree should topple over in the direction
of the power line at the time of the tree's maturity.
Note has been added to the Landscape Plan.
5. For the benefit of the City Forester, please add the following notes to the
Landscape Plan:
• The soil in all landscape areas, including parkways and medians, shall be
thoroughly loosened to a depth of not less than eight (8) inches and soil
amendment shall be thoroughly incorporated into the soil of all landscape
areas to a depth of at least six (6) inches by tilling, disking or other suitable
method, at a rate of at least three (3) cubic yards of soil amendment per
one thousand (1,000) square feet of landscape area.
Note has been added to the Landscape Plan.
• A permit must be obtained from the City forester before any trees or shrubs
as noted on this plan are planted, pruned or removed on the public right-of-
way. This includes zones between the sidewalk and curb, medians and
other city property. This permit shall approve the location and species to
be planted. Failure to obtain this permit may result in replacing or
relocating trees and a hold on certificate of occupancy.
Note has been added to the Landscape Plan.
• The developer shall contact the City Forester to inspect all street tree
plantings at the completion of each phase of the development. All trees
need to have been installed as shown on the landscape plan. Approval of
street tree planting is required before final approval of each phase. Failure
to obtain approval by the City Forester for street trees in a phase shall
result in a hold on certificate of occupancy for future phases of the
development.
Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 47 Created: 311812008
[3118108] Add 0.2' drop in MH where private sewer service ties into the 8" public
sewer.
The drop has been added.
Number: 48 Created: 311812008
[31181081 Revise note for 1.5" curb stop/meter pit as noted on redlined plans.
The note has been revised.
Number: 49 Created: 311812008
[3118108] A portion of the private sewer service that is shallow shows concrete
encasement and no insulation. Will the concrete encasement provide adequate
protection from freezing?
Insulation has been added to all sewer with less than 4-feet of cover.
Comments from Current Planning:
1. Please add the following note to the Plat:
"Refer to the Site Plan and Landscape Plan, on file with the City of Fort
Collins, for restrictions on the vegetation allowed within the P.R.P.A.
easement. "
The note has been added to the Plat.
2. Please add the following note to the Site Plan:
"Refer to the Landscape Plan for restrictions on the vegetation allowed
within the P.R.P.A. easement."
Note has been added to the Site Plan.
3. My notes from the meeting with the City Forester and representatives from
P.R.P.A. indicate that the Ornamentals within the P.R.P.A. easement would be
limited to Cockspur Hawthorne or Coralburst Crabapple. The plans now indicate
Tatarian Maple, Autumn Blaze Pear and Indian Summer Crabapple. Be sure to
verify with Tim Buchanan, City Forester, that these trees will not exceed a height
to interfere with the overhead power line.
Trees shown are per Tim Buchanan's recommendation.
2. The floodplain map in the drainage report is not correct. There has been a
LOMR for the Oxbow Levee project that has removed this site from the 100-year
floodplain. Please include a copy of the LOMR map, showing the site location.
The LOMR map has been added.
3. The Plat includes a note that a portion of the site is in the 100-year floodplain.
There has been a LOMR for the Oxbow Levee project that has removed this site
from the 100-year floodplain. Please revise the plat to state that the entire site is
in the Poudre River 500-year floodplain.
The plat has been revised
4. The drainage and grading plans show a 100-year floodplain line. There has
been a LOMR for the Oxbow Levee project that has removed this site from the
100-year floodplain. Please revise the plans and include a note that the entire
property is in the Poudre River 500-year floodplain.
The plans have been revised and the note added.
Topic: Stormwater
Number., 53 Created: 311912008
[3119108] Please add the drainage plan to the utility set and include a water
quality and detention pond summary table.
Number: 54 Created: 311912008
[3119108] Please label the detention pond emergency spillway on the grading and
drainage plans and include spillway spot elevations on the grading plan.
Number: 55 Created: 3/19/2008
[3119108] How was the sizing of the storm sewers achieved? There is no sub -
basin or flow information documenting pipe size. Storm Line A needs to be at
least 15-inches, which is the City's minimum. Please also label RCP as Class lll.
Number: 59 Created: 312112008
[3121108] Please document how both stormline connections onto existing pipes
are being proposed with a detail or by notes.
Topic: Plat
Number. 56 Created: 311912008
[3118108] Technical services has the following comments:
1. Boundary closes.
2. The section corner and quarter corner are not as described, both = PLS 17497
monuments.
Noted and corrected.
Topic: Site Plan
Number. 50 Created: 311812008
[3118108] The site plan calls out a 5 foot utility easement along Buckingham
Street when 9 feet is required (and is reflected as 9 feet on the plat).
There is an existing 8' utility easement as labeled on the site plan. We are adding an
additional 5' to that easement as labeled on the site plan. Total utility easement width is
13'. The utility easement from the new ROW is 9 feet as required. I have labeled it as
so on the side west of the entry drive. See site plan.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number. 57 Created: 3/19/2008
[3119108] Please contact me with more information regarding the design and
construction of the gas fire pit shown on the site plan.
Fire pit details have been submitted to PFA via email and questions have been
addressed. Coordination with the building department is on going.
Department: Stormwater-Water-WastewaterIssue Contact: Wes Lamarque
Topic: Erosion/Sediiment Control
Number. 58 Created: 312112008
[3121108] Please submit an erosion control plan with the next submittal. One was
not submitted for the site.
The erosion control plan has been submitted.
Topic: Floodplain
Number. 52 Created: 311912008
[3119108] 1. The entire site is in the Poudre River 500-year floodplain. No critical
facilities, including daycare, are allowed in the Poudre River 500-year f/oodplain.
Please include a note about the critical facilities prohibition on the site plan,
grading/drainage plan, and in the text of the drainage report.
The requested note has been added.
[11/6/07] The cross sections for Lemay show instances where the additional
pavement widening is at less of a cross slope than the existing portion which is
of concern and does not meet standards.
Noted.
Number: 60 Created: 311912008
[3119108] Can more detail on the grading be provided pertaining to the
Buckingham sidewalk? I'm recalling that the sidewalk is intended to be raised
slightly to provide some flexibility for not having the road designed at this time.
A typical section has been added along with additional spot elevations.
Number: 61 Created: 312112008
[31191081 Please label on the plan sheets that the driveway out to Buckingham
Street is to be in concrete to the property line.
Note has been added to sheet HC1.
Topic: General
Number. 20 Created: 111612007
[3118108] The applicant's response indicated that PRPA does not need to sign the
plat or construction drawings. Please keep in mind that the attorney for the
Church that is required to sign the attorney certification for the plat, may feel that
PRPA would need to sign off on the plat as an owner of an easement within the
plat boundaries in accordance with attorney certification requirements specified
in the Land Use Code.
[12/18/071 I'm fine with the applicant's response, though I believe some sort of
acknowledgement from PRPA should be received prior to hearing that they don't
object to the project going to hearing (or have no comment/concerns with the
propsal.)
[11/6/07] It appears that the Platte River Power Authority would need to be a
signatory to the plat as well as construction drawings, having an exclusive
easement and facilities within the property boundary.
Noted.
Number.51 Created. 311812008
[3118108] Shouldn't the "future sidewalk" specified to head from the parking lot to
the western boundary of the property be in an access easement on the plat to
ensure the legal right for the property to the west to tie into this sidewalk system?
A cross access easement will be pursued with the adjacent property at the time that the
Church requires additional parking.
V T 7iiplllay.SSOCIATES INC
Land Seapo Archl?acluro Urban Design Planning
May 21, 2008
Mr. Ted Shepard
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
RE: Mountain View Community Church PDP - TYPE I
Response to staff Project Review comments
Dear Mr. Shepard:
VP 0as
�p
We have reviewed the staff letter dated March 24, 2008 and have the following
comments:
ITEM: Request for neighborhood community church
COMMENTS:
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plans
Number. 22 Created: 111612007
[3118108] Please also add preliminary design information for the realigned Lemay
(done with the Lincoln Park project) as referenced on the construction plans.
[12118107] Carried over for reference.
[1116107] Please add the preliminary design information for Lemay and
Buckingham done with the Lincoln Park project onto the construction plan set (as
was done on the site plan). This information isn't as necessary on the site plan,
but should be shown on the construction plan set as a reference. This
information should be complete with stationing, tangent and curve data.
The preliminary design information has been added.
Number: 27 Created: 111612007
[3118108] A copy of the variance request was received and has been approved.
[12/18/07] The cross slopes appear fine in the revised drawing. Please note that I
did not come across a variance request letter for the .4% grade specified in the
response letter, though I don't see this being required prior to hearing.
Phone 970.224.5828 Fax 970,224.1662
401 West Mountain Ave. Suite 201
Fort Collins, CO 80521-2604
vfripley.com