Mt. View Community Church r jP
Administrative Hearing
Findings, Conclusions, and Decision
January 9, 2008
Page 6 of 6
D. Division 3.6, Transportation and Circulation
A Transportation Impact Study was performed that found the proposal
compliant with the transportation Level of Service (LOS) standards to the
extent possible as is required under this section of the LUC. An
acceptable level of pedestrian access cannot be achieved and there is no
practical means to do so. Northbound and southbound left turn lanes will
be provided.
SUMMARY OF CONCLUSIONS
A. The Mountain View Community Church, Project Development Plan is in
compliance with the Northside Neighborhoods Plan.
B. The Mountain View Community Church, Project Development Plan is subject to
administrative review and the requirements of the Land Use Code (LUC).
C. The Mountain View Community Church, Project Development Plan satisfies the
development standards of the I zoning district.
D. The Mountain View Community Church, Project Development Plan complies with
all applicable General Development Standards contained in Article 3 of the Land
Use Code.
DECISION
The Mountain View Community Church, Project Development Plan, #31-07, is hereby
approved by the Hearing Officer subject to the following condition:
The Applicant shall revise the site, landscape and utility plans at the time of Final Plan
submittal to reflect drainage pans and grading that will accommodate a playfield along
the south portion of the site.
Dated this 11th day of January 2008, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
Cameron Gloss
Planning and ing Director
Mt. View Community Church r jP
Administrative Hearing
Findings, Conclusions, and Decision
January 9, 2008
Page 5 of 6
along the south side of Buckingham. An existing asphalt path lies on the
west side of 9th Street. Two bike racks will be provided near the main
building entry.
7. Section 3.2.2 (J) Setbacks
Proposed parking areas (first and second phases) are beyond the
minimum required 15 foot setback. There are no build to line standards
applicable to this development.
8. Section 3.2.2 (K)(2) Minimum Number of Off -Street Parking Spaces
This request satisfies the applicable requirements of one parking space
per four seats in the assembly area as required in the LUC. The number of
off-street spaces is 138, where a minimum of 140 is required; however,
the future parking area provides an additional 55 spaces, thus satisfying
the requirement.
9. Section 3.2.4 (D) Site Lighting
The lighting plan provides for light level sufficient for security and the
proposed use, and there is no light trespass over the property line.
B. Division 3.3, Engineering Standards
The proposal complies with the design standards, requirements, and
specifications for the services as set forth in this section. The property was
previously platted. Four feet of additional Buckingham Street right-of-way
will be dedicated by separate instrument.
C. Division 3.5, Building Standards
Because of the site's location within the Industrial district, the building is
not required to match the existing context. The building contains
traditional elements associated with a church. Relief is provided by the
use of natural stone. Columns and dormers help break up the mass.
Pitched roofs create the impression of a residential structure that
contributes to neighborhood compatibility with the Andersonville
neighborhood. The height to the top of the ridgeline of the main roof is 36
feet. The main entrance is highlighted by a steeple which achieves a total
height of 48 feet. All exterior facades are articulated. The use of high
quality exterior materials combined with a recognizable base, middle and
top leads to compliance with the standard.
Mt. View Community Church rLiP
Administrative Hearing
Findings, Conclusions, and Decision
January 9, 2008
Page 4 of 6
1. Section 3.2.1, Landscaping and Tree Protection
This request satisfies the applicable requirements set forth in this section
of the LUC. Street trees will be planted along both frontages meeting the
standard for tree species, size and number; except under the electrical
power line where ornamental species have been used to reduce potential
future utility conflicts. Building foundation plantings have been provided.
2. Section 3.2.1(E)(1), Landscape Buffering Between Incompatible Uses and
Activities
The parking bay along the west property line will be screened with a
continuous shrub bed and five new shade trees, thus buffering the church
from the adjacent industrial area.
3. Section 3.2.1(E)(2) Landscape Area Treatment
In order to better serve the functional needs of the site and satisfy the
standard of this Section, the Hearing Officer will require relocation of
detention pond cross pans and minor site regrading as a condition of
approval. A flatter cross-section within the detention pond, along with
cross pans along the south side of the property, will allow the detention
pond area to be used as an active play area during most of the year.
4. Section 3.2.1(E)(4) Parking Lot Perimeter Landscaping- Trees and
Screening
As noted above, the request satisfies the parking lot screening
requirements in this section of the LUC. A future south parking lot, if
constructed, would be required to provide screening to satisfy the parking
area screening standard.
5. Section 3.2.1(E)(5) Parking Lot Interior Landscaping
Landscape islands comprising no less than 10% of the parking area are
provided, thus satisfying the requirements of the LUC.
6. Section 3.2.2 (B-E) Access, Circulation and Parking
This request satisfies the applicable requirements set forth in this section
of the LUC. Access to the site will be via a curb cut on Buckingham Street.
A detached sidewalk will be constructed with this project, including ramps
on either side of the drive apron and connecting to the existing sidewalk
Mt. View Community Church t-LiP
Administrative Hearing
Findings, Conclusions, and Decision
January 9, 2008
Page 3 of 6
FACTS AND FINDINGS
1. Site Context
The surrounding zoning and land uses are as follows:
N: I; Vacant (New Belgium O.D.P.)
S: I; Existing Multi -tenant Commercial Building
E: I; Vacant (future re -alignment of North Lemay Avenue)
W: I; Existing Industrial Building
The site was replatted as Lot Two of the Second Replat of North Lemay Subdivision,
Second Filing in September of 1993. The site is vacant.
There are two existing non-standard utility easements along the entire east property
line. First, there is a 15-foot wide easement for the Platte River Power Authority that is
contained within the boundaries of the subject property. Second there is a 60-foot wide
easement also for P.R.P.A., 15 feet of which is contained within the subject property
and 45 feet of which is located within the Lemay Avenue right-of-way. These
easements are for the benefit of existing high voltage electrical power lines that connect
the Rawhide Power Plant with the City of Fort Collins Light and Power substations.
2. Compliance with the Northside Neighborhoods Plan
The proposal complies with the Northside Neighborhoods Plan since the parcel is
designated for light industrial uses and the existing Industrial (1) District permits places
of worship.
3. Compliance with Article 4 and the I Zoning District Standards
The proposed church as a "place of worship" is permitted within the Industrial zone
subject to Administrative Review.
There are no specific use or development standards found in Article 4 that pertain to the
proposal.
4. Compliance with Article 3 of the Land Use Code — General Development
Standards
The PDP complies with all applicable General Development Standards, more
specifically as follows:
A. Division 3.2, Site Planning and Design Standards
Mt. View Community Church rL)P
Administrative Hearing
Findings, Conclusions, and Decision
January 9, 2008
Page 2 of 6
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 5:00 p.m. on January 9, 2008 in Conference Rooms C & D at
281 North College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a sign up sheet of persons attending the hearing. The LUC, the City's
Comprehensive Plan (City Plan), and the formally promulgated policies of the City are
all considered part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Ted Shepard, Chief Planner
From the Applicant:
Sandy McFeron, VF Ripley Associates
Steve Schroyer
Kevin Brazelton
Jason McConahy
Brian Stribley
Kevin Wolfe
From the Public:
None.
Written Comments:
None.
PlanninL -)evelopment and Transportatik. Services
Planning and Zoning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
CASE NUMBER:
APPLICANT:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
January 9, 2008
Mountain View Community Church
Project Development Plan
#31-07
Mountain View Community Church of
Fort Collins
c/o V-F Ripley Associates
401 West Mountain Avenue
Fort Collins, CO 80521
Mountain View Community Church of
Fort Collins
201 Whedbee Street
Fort Collins, CO 80524
Cameron Gloss
Planning and Zoning Director
The Applicant has submitted a request to construct a church on the vacant property at
the southwest corner of North Lemay Avenue and Buckingham Street. The site is 6.32
acres in size. The proposed church would contain 26,522 square feet and seat
approximately 560 persons at capacity in the sanctuary. There will also be rooms for
offices, classrooms and fellowship.
SUMMARY OF HEARING OFFICER DECISION: Conditional Approval
ZONING DISTRICT: I, Industrial