Loading...
HomeMy WebLinkAboutMOUNTAIN VIEW COMMUNITY CHURCH - PDP - 31-07 - REPORTS - RECOMMENDATION/REPORTNorthbound and southbound left -turn lanes are required based on the short term (2009) background peak hour traffic and the fact that Lemay Avenue is classified as an arterial street. The east and west legs of Buckingham Street are offset at the intersection with Lemay Avenue. The current traffic making this maneuver is small and it is not likely that the movement would increase significantly. While the offset is not ideal, it is not likely to present operational or safety issues. At the Lemay/Buckingham intersection, during the Sunday peak hour, the westbound left -turning vehicles will experience delays commensurate with Level of Service F. However, with a .80 adjustment to the critical gap, this intersection will operate acceptably. 5. Findings of Fact: In evaluating the request for Mountain View Community Church of Fort Collins, P.D.P., Staff makes the following findings of fact: A. The P.D.P. is in compliance with the Northside Neighborhoods Plan. B. The P.D.P. complies with the applicable standards of the Industrial zone district. C. The P.D.P. complies with the applicable General Development Standards of Article Three. D. The P.D.P. is considered compatible with the surrounding neighborhood. RECOMMENDATION: Staff recommends approval of Mountain View Community Church of Fort Collins P.D.P., #31-07. 6 'i . J. Section 3.5.3(B)(1) — Relationship of Buildings to Streets, Walkways and Parking —Orientation to a Connecting Walkway There is a direct connecting walkway linking the main entrance to the public sidewalk on Buckingham Street. K. Section 3.5.3(B)(2)(d)2 — Relationship of Buildings to Streets, Walkways and Parking — Orientation to Build -to Lines for Streetfront Buildings The site is located in the Industrial Zone District. Section 4.28(E)(2) exempts Places of Worship from having to comply with the build -to line standard. L. Section 3.5.3(C)(D) — Variation in Massing and Character and Image The building is new but contains traditional elements associated with a church. Relief is provided by the use of natural stone. Columns and dormers help break up the mass. Pitched roofs create the impression of a residential structure that contributes to neighborhood compatibility with the Andersonville neighborhood. The height to the top of the ridgeline of the main roof is 36 feet. The main entrance is highlighted by a steeple which achieves a total height of 48 feet. All exterior facades are articulated. The use of high quality exterior materials combined with a recognizable base, middle and top leads to compliance with the standard. M. Section 3.6.4 — Transportation Level of Service Requirements An intermediate (short term) Transportation Impact Study was performed for this P.D.P. The key findings are as follows: • The P.D.P. adequately provides vehicular and bicycle facilities necessary to maintain the adopted transportation Level of Service standards contained in Part II of the City of Fort Collins Multi -Modal Transportation Level of Service Manual for the short term (2009). Acceptable level of service for the pedestrian mode cannot be achieved for all factors and there are no practical means to meet the level of service criteria for some factors. • The bicycle and transit level of service will be acceptable. • Sole access to the site will be gained from Buckingham Street. • A traffic signal is not warranted at the Lemay/Buckingham intersection. 5 D. Section 3.2.1(E)(5) — Parking Lot Interior Landscaping The parking lot complies with the requirement that no less than 10% of the interior be in the form of landscape islands. There are no rows of greater than 15 spaces without the benefit of a landscape island. E. Section 3.2.2(B - E) — Access Circulation and Parking As mentioned, the parking and circulation system is intentionally designed to provide convenient access to the main entrance. There are no plans, now or in the future, to gain access to North Lemay Avenue. The on -site pedestrian system provides connections out to the public sidewalk along Lemay and to the west to accommodate future shared parking with the existing industrial user. A bicycle rack is provided near the public entrance. F. Section 3.2.2(J) — Setbacks The parking lots (proposed and future) are setback from the right-of-way of Buckingham Street and North Lemay Avenue by distances that significantly exceed the required 15 feet. G. Section 3.2.2(K)(2) — Parking Lots — Minimum Number of Spaces The church is required to provide a minimum of one parking space per four seats in the assembly area. The new building is expected to serve up to 560 parishioners requiring a minimum of 140 spaces. The number of spaces provided is 138, which is two spaces less than the minimum required. The future parking lot, however, would contain an additional 55 spaces. H. Section 3.2.4(D) — Site Lighting — Design Standards The Lighting Plan is designed to provide uniform illumination at levels that are appropriate for the amount of outdoor activity and security. Further, the Lighting Plan calls for sharp cut-off luminaries so that there is no illumination trespass over the property line. I. Section 3.5. 1 (B) (C) (E) (F) — Building Project and Compatibility — Architectural Character The church building would be located in an industrial area. The nearest building is a large metal -sided structure that is appropriate for its industrial use. Requiring architectural compatibility with such a structure, therefore, is determined to be not applicable. 4 While the Plan designates the site as Industrial, it calls for such industrial development to be restricted to light versus heavy industrial and that special design provisions be applied to building height, landscaping and screening loading and outdoor storage. The Industrial Zone District, however, has not been amended to implement the findings and conclusions of the Plan. Consequently, the Land Use Code allows Places of Worship to be located within the Industrial Zone District as a permitted use, subject to Administrative Review. 3. Industrial Zone District: As stated, the proposed use is permitted. There are no specific land use standards or development standards that are pertinent to Places of Worship. 4. Compliance with Article Three General Development Standards: A. Section 3.2.1(C)(D) —Landscaping and Tree Protection Street trees are provided along both Lemay Avenue and Buckingham Street. Because of the existing overhead electrical power line, and consistent with past practice, street trees along will be limited to ornamental versus shade trees. Foundation shrubs are provided on all four sides of the building. B. Section 3.2. 1 (E)(1)(a) — Landscaping Standards — Buffering Between Incompatible Uses and Activities The west property line abuts an industrial use. The parking bay along the west property line will be screened with a continuous shrub bed and five new shade trees. Existing trees in this area will be preserved. C. Section 3.2. 1 (E) (4) (a, b) — Parking Lot Perimeter Landscaping — Trees and Screening The parking lot provides convenient access to the building entry on the west elevation. The parking lot includes a future expansion to the south of the building should additional spaces be needed. As mentioned, the proposed main parking lot will be screened along the west property line. The future south lot would be located approximately 230 feet from the south property line due to the location of the stormwater detention pond. Screening the future south parking lot will be a requirement at the time of the plan is amended. 3 COMMENTS: Background: The surrounding zoning and land uses are as follows: N: I; Vacant (New Belgium O.D.P.) S: I; Existing Multi -tenant Commercial Building E: 1; Vacant (future re -alignment of North Lemay Avenue) W: I; Existing Industrial Building The site was replatted as Lot Two of the Second Replat of North Lemay Subdivision, Second Filing in September of 1993. The site is vacant. It is significant to note that along the entire east property line; there are two existing non-standard utility easements. First, there is a 15-foot wide easement for the Platte River Power Authority that is contained within the boundaries of the subject property. Second there is a 60-foot wide easement also for P.R.P.A., 15 feet of which is contained within the subject property and 45 feet of which is located within the Lemay Avenue right-of-way. These easements are for the benefit of existing high voltage electrical power lines that connect the Rawhide Power Plant with the City of Fort Collins Light and Power substations. 2. Northside Neighborhoods Plan: The site is located within the boundary of the Northside Neighborhoods Plan, adopted in January of 2005. According to the Framework Plan, the site is located within Area 5 which is designated as Industrial. The Plan states: "This Plan continues to encourage industry in the areas zoned Industrial. Industrial zoning currently provides opportunities for workplaces and manufacturing and a wide range of industry, but not necessarily a mix of uses, including residential. The properties in this area are small, and altogether could accommodate almost 30 acres of additional industry, or almost 200,000 square feet of building space." The Plan further identifies the parcel as "Residential/Industrial Transition." The Plan states: "Industrial/Residential Interface Areas. Ensure interface areas provide gradual transitions between industry and residential neighborhoods to preserve the livability of the neighborhoods. These interface areas should provide visual physical buffers between existing and new developments and protect residential neighborhoods from intrusion of light, noise odors and other nuisances sometimes caused by business or industry. " ►a ITEM NO. 2 MEETING DATE STAFF E-,,/) ,S f�FPA e 0 City of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: Mountain View Community Church P.D.P., 31-07 APPLICANT: Mountain View Community Church of Fort Collins c/o V-F Ripley Associates 401 West Mountain Avenue Fort Collins, CO 80521 OWNER: Mountain View Community Church of Fort Collins 201 Whedbee Street Fort Collins, CO 80524 PROJECT DESCRIPTION: This is a request to develop a church on the vacant property at the southwest corner of North Lemay Avenue and Buckingham Street. The site is 6.32 acres in size. The proposed church would contain 26,522 square feet and seat approximately 560 persons at capacity in the sanctuary. There will also be rooms for offices, classrooms and fellowship. The church would be 36 feet high to the ridgeline of the roof and the steeple would extend another 12 feet above that. Access to the site would be from Buckingham Street only. The site is zoned I, Industrial. RECOMMENDATION: Approval EXECUTIVE SUMMARY: A. The P.D.P. is in compliance with the Northside Neighborhoods Plan. B. The P.D.P. complies with the applicable standards of the Industrial zone district. C. The P.D.P. complies with the applicable General Development Standards of Article Three. D. The P.D.P. is considered compatible with the surrounding neighborhood. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO.80522-0580 (970) 221-6750 PLANNING DEPARTMENT