I'm not sure what the walk is like in front of the HC parking spaces. Is it level with
the asphalt parking, or is it a raised walk? Each Handicap parking space needs to
have ramped access to the walk if it's a raised walk.
The sidewalk in front of the handicap parking spaces has been uniformly lowered to
match edge of asphalt rather than providing ramps at each space.
Department: Current Planning Issue Contact: Ted Shepard
1. Have you explored the possibility of shared parking with your industrial
neighbor to the west? There is a strong likelihood that industrial employees'
and customers will not be using their parking lot on Sunday mornings. If you
were able to secure shared parking, then "future parking" may not be needed.
This would save the church asphalt paving and additional fees to the
Stormwater Utility.
The Church is currently exploring this option with the adjacent neighbor to the west. A
connective walk has been added in anticipation of this option.
2. Street trees along Lemay, if under the existing overhead transmission line,
may be switched to ornamental versus shade trees.
Ornamental trees have been added in the ROW however there is an existing 60' Platte
River Power Authority easement at runs the length of entire site fronting Ninth Street. In
addition there is also a 25' drainage easement adjacent to the Platte River Power
Authority easement. A copy of the site plan, landscape plan and utility plans are being
sent with this submittal to Tom McCormick at the Platte River Power Authority at their
request.
Please let us know if you have any other issues.
Sincerely,
Sandy McFeron
Project Manager
V.F. Ripley Associates, Inc.
Kevin Brazelton
Project Engineer
Northern Engineering Services
A note has been added stating all signage shown for planning purposes only. Approval
of signage is not included in this process. All signage shall meet Fort Collins Sign
Code.
Number.3 Created.111112007
[11/1/07] Indicate parking stall width on site plan.
The typical stall width dimension has been added to the site plan.
Number.4 Created:111112007
[11/1/07] A landscape island in the parking lot directly west of the main building
entrance indicates "6 PCC" However, there is no PCC listed in the Plant List.
What kind of tree is a PCC?
The "6 PCC" were mislabeled. The label now reads "6 PCX, Autumn Blaze Pear.
Number.5 Created.11/1/2007
[11/1/07] Street trees are required along Lemay.
Lemay is actually Ninth Street at this point and has relabeled as such. Ornamental
trees have been added in the ROW however there is an existing 60' Platte River Power
Authority easement at runs the length of entire site fronting Ninth Street. In addition
there is also a 25' drainage easement adjacent to the Platte River Power Authority
easement. A copy of the site plan, landscape plan and utility plans are being sent with
this submittal to Tom McCormick at the Platte River Power Authority at their request.
Number.6 Created.111112007
[11/1/07] Parking lot perimeter landscaping and screening along the west lot line
needs to comply with Section 3.2.1(E)(4). I imagine the existing Austrian Pines
make it difficult to add more deciduous trees, but I can't tell from the plan if the
screening is met since the shrub planting area doesn't specify the size and
species of shrubs. The Plant Legend indicates the area to be "proposed shrubs"
and the Plant List only states "Recommended Shrubs". The Plant List will need
to include a listing of the actual shrubs to be planted. Same with the foundation
shrub planting areas - we should know what's going to be planted.
Specific plants will be selected at final compliance. A note has been added to the
landscape plan along the west property line stating the code compliance requirement.
Number.7 Created.11/1/2007
[11/1/07] Site plan needs to show the setback distance from the closest point of
the building on the east side to the property line along Lemay.
The dimension has been added to the site plan.
Number. 10 Created. 111512007
[1115107] Clearly mark the 8-inch sewer service as PRIVATE.
The sewer has been marked as private.
Number. 11 Created. 111512007
[11/5/07] Add control valve on the fire line as noted on the redlined plans.
The tee in question has been removed due to the removal of the proposed fire hydrant;
therefore, the valve was not added.
Number. 12 Created. 11/5/2007
[11/5/07] There are two existing fire hydrants within 300 feet of the building.
Coordinate with PFA and City water utility to eliminate one or both of the
proposed hydrants.
PFA has agreed that both proposed fire hydrants may be eliminated and both have
been removed from the drawings.
Number. 13 Created. 111512007
[1115107] Add tracer wire details and notes to utility plans for the PVC water lines.
Since the fire hydrants have been removed there is now only service lines to the
building.
Number. 14 Created. 111512007
[11/5/07] See redlined plans for other comments.
Noted.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number:l Created.11/1/2007
[11/1/07] Their comment letter (comment #2) indicates that they're submitting a
modification request to the Build -to -line standards of 3.5.3(B)(2). However,
Section 4.28(E)(2)(a) exempts this use from having to comply with the
requirements of Section 3.5.3.
Noted.
Number.2 Created.111112007
[11/1/07] Remove the sign locations from the plans. The sign code will regulate
signs.
Proposed sign locations are shown for planning and landscape purposes only. This is
usually an oversight in designing the site plan and can caused major problems later on.
Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington
Topic: Landscape Plan
Number. 15 Created: 11/5/2007
[11/5/07] Adjust plantings to meet required separation distances from
water/sewer lines.
Landscape has been adjusted to meet the required separation distances.
Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque
Topic: Stormwater
Number. 36 Created. 111912007
[1119107] The detention volume calculations are about 20% low compared to
calculations done in our office, about 1.19 ac-ft. Please revise the detention
volume using Fort Collins criteria and spreadsheets, not the Urban Drainage
spreadsheet.
The calculations have been adjusted.
Number. 37 Created. 111912007
[1119107] Half of Buckingham Street along the site's frontage should be detained
in the on -site detention pond. Please try to route these flows to the pond. If this
is physically impossible, providing for the extra volume in the pond and not
actually directing the flows there is an option.
The drainage on the south side of Buckingham Street has been directed under the
sidewalk with a culvert.
Number. 38 Created. 111912007
[1119107] A drainage easement is required for the limits of the detention pond.
The drainage easement has been added.
Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington
Topic: Water/Wastewater
Number.9 Created.111512007
[1115107] The existing sanitary sewer at the south edge of the property is
relatively shallow. What is the minimum cover over the pipe for the proposed
sewer extension? Provide additional information.
A minimum of 4-feet of cover is desirable. Should the cover being provided be less than
4-feet, insulation board will also be provided. Details and a plan and profile will be
provided with the FCP submittals.
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number. 16 Created: 111512007
[11/5/07] ASSEMBLY OCCUPANCY REQUIREMENTS: All pertinent requirements
for A-3 occupancies regarding exits, exit signage, exit lighting, fire sprinklers,
etc., as for in the 1997 Uniform Fire Code, shall be met.
Noted. Comment Items will be addressed during the building permit process.
Number. 17 Created: 111512007
[1115107] OCCUPANCY LOAD: An occupancy load sign is required for any room
that constitutes an assembly area (50 or more people), based on square footage.
Noted. Comment Items will be addressed during the building permit process.
Number. 18 Created. 111512007
[1115107] KNOX BOX REQUIRED: Poudre Fire Authority requires a "Knox Box" to
be mounted on the front of every new building equipped with a required fire
sprinkler system or fire alarm system. 97UFC 902.4; PFA BUREAU POLICY 88-20
Noted. Comment Items will be addressed during the building permit process.
Number. 19 Created. 11/5/2007
[1115107] CORRECTION? Sheet U1 shows a 24-foot Access Easement; should
this actually be labeled 24-foot Emergency Access Easement?
The note has been corrected to state 24-foot Emergency Access Easement
Department: Stormwater-Water-Wastewaterlssue Contact. Wes Lamarque
Topic: Fire
Number:40 Created:11/9/2007
[11/9/07] a
Topic: Floodplain
Number. 39 Created. 111912007
[1119107] Please discuss in the text of the report that the building will not be
located in any floodplain.
This has been added to the report.
Number. 24 Created. 111612007
[1116107] As a heads -up, the local street portion for Lemay Avenue in the ultimate
condition abutting this property we're estimating involves approximately 120' of
linear frontage.
Noted.
Number. 33 Created: 11/7/2007
[11/7/07] With Technical Services comment #5 on ID #32 that Lemay should be
Ninth Street, the documents should all be revised to reflect Lemay Avenue
abutting the property as in fact being Ninth Street. Please note that my
comments had been referring to the roadway as Lemay.
References to Lemay Avenue have been corrected to Ninth Street.
Number.41 Created: 111912007
[11/7/07] Our records indicate a credit of $450 in TDR fees for the acceptance of a
fee for a modification of standards and a deed of dedication which aren't
required. The credit is based upon a building square footage area of 23,192 as
specified on a revised site plan.
Noted.
Topic: Plat
Number. 32 Created: 11/7/2007
[11/7/07] Technical Services offers the following comments:
1. Boundary closes.
2. Show how street were dedicated -- see redlines.
3. Lot area should be less the 4' of additional right-of-way.
4. Site plan has scanning issues, see redlines.
5. Lemay Avenue should actually be Ninth Street.
These comments have been addressed.
Topic: Site Plan
Number: 34 Created: 11/7/2007
[11/7/07] 1 was given a revised site plan which reflects both the building coverage
and building square footage to be 23,192 square feet. The original submittal did
not list a building square footage but noted the building coverage as being 26,522
square feet. Was the revised site plan intended to revise the building coverage
data?
The original site plan included the future phase of the building. It is assumed the church
would be required to go through the amendment process if it decides in the future to
expand. Most likely the area and design would be different than what is shown now so
the future building area was removed from the calculations.
Number: 28 Created: 111612007
[1116107] There does not appear to be any additional shoulder/shy distance from
the defacto bike lane to the roadside ditch in the new design. Lemay appears to
have some unpaved shoulder both north and south of Buckingham (south
appears to have a greater shy distance). Ideally there should be a couple feet of
gravel shoulder shy distance from the ditch for bicyclist safety, especially with
the combination of a transition and limited lighting in the area. Also the 2 feet of
gravel helps for integrity of the pavement section.
A 2-foot gravel shoulder has been added.
Number: 30 Created: 111612007
[1116107] Please add the following street cut note to Sheet G1: Limits of street cut
are approximate. Final limits are to be determined in the field by the City
Engineering Inspector. All repairs to be in accordance with City street repair
standards.
The note has been added.
Number: 31 Created: 11/7/2007
[11/7/07] The construction plans require a second benchmark.
A second benchmark has been added.
Number: 35 Created: 111712007
[11/7/07] 1 wasn't able to ascertain if drainage is being directed off the driveway
onto Buckingham over the sidewalk. How much spillage (if any) occurs over the
sidewalk?
The drainage on the south side of Buckingham Street has been directed under the
sidewalk with a culvert.
Topic: General
Number: 20 Created: 111612007
[1116107] It appears that the Platte River Power Authority would need to be a
signatory to the plat as well as construction drawings, having an exclusive
easement and facilities within the property boundary.
Platte River Power Authority was contacted. PRPA would like to review the drawings
prior to determining whether they will sign off on the Plat or drawings. A copy of this
submittal will be provided to PRPA.
Number. 23 Created: 111612007
[1116107] The construction plan set needs to show vertical design information
specific to Buckingham/Duff carried from the Lincoln Park project and then have
it preliminarily designed along this project tying back to the west. If the project
were to then also do a full design of Buckingham (flowline and centerline design,
cross sections, etc.) then the local street portion escrow for Buckingham would
only need to include construction costs (curb and gutter, pavements, etc.) (The
design should demonstrate that the curb and gutter installed along the western
property boundary can remain otherwise curb and gutter in this location would
also need to be included in the escrow). If the project's design along
Buckingham is limited to the preliminary portion only then the local street portion
escrow will need to include design costs to ensure curb and gutter and pavement
can be built to an ultimate condition.
Per discussions with City staff the preliminary design information Lemay and
Buckingham is not being provided with this PDP submittal, but will be coordinated with
City staff prior to the hearing. The design information will be provided with the FCP
submittals.
Number. 25 Created. 111612007
[1116107] I'd like to do some further follow-up on the existing asphalt sidewalk
and how it is affected by the widening shown for the left turn lane. It appears that
the asphalt sections of walk may need to be reconfigured with the road widening.
Also, it may be necessary to provide detectable warnings (truncated domes) for
the walks as they approach the intersection.
The truncated domes have been added to the asphalt trail. Further details will be
provided with the FCP submittals
Number: 26 Created: 111612007
[1116107] The Lemay design for the turn lanes creates angle points where the
transitions occur for the left turn lanes, I'd like to see these shown smoothed out
with curves rather than the angle points for driveability concerns.
The angle points have been eliminated and radii of using local street criteria have been
added.
Number. 27 Created. 111612007
[1116107] The cross sections for Lemay show instances where the additional
pavement widening is at less of a cross slope than the existing portion which is
of concern and does not meet standards.
The cross slopes have been adjusted by providing a minimum of 0.40% flowline slope
for the curb and gutter being proposed on the west side of Ninth Street. A variance
request is also being submitted.
J� V FrliiPI4eyA88CC1ATE8 INC
Landscape Architecture Urban Design Planning
December 04, 2007
Mr. Ted Shepard
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
P.E. Mountain View Community Church PDP— TYPE
Response to staff Project Review comments
Dear Mr. Shepard:
We have reviewed the staff letter dated November 13, 2007 and have the following
comments:
ITEM: Request for neighborhood community church
COMMENTS:
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plans
Number. 21 Created: 111612007
(1116107j Add standard LCUASS details 707 and 1607.
The details have been added.
Number: 22 Created. 111612007
[1116107] Please add the preliminary design information for Lemay and
Buckingham done with the Lincoln Park project onto the construction plan set (as
was done on the site plan). This information isn't as necessary on the site plan,
but should be shown on the construction plan set as a reference. This
information should be complete with stationing, tangent and curve data.
Per discussions with City staff the preliminary design information Lemay and
Buckingham is not being provided with this PDP submittal, but will be coordinated with
City staff prior to the hearing. The design information will be provided with the FCP
submittals.