Loading...
HomeMy WebLinkAboutADVANCE AUTO PARTS - FDP - 26-07/A - CORRESPONDENCE -If a fire lane cannot be provided, the building shall be fire sprinklered. 97UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1 Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque Topic: Stormwater Number: 130 Created: 1 /9/2008 [1/9/08] The site is now out of the City and FEMA floodplain. Please remove all notes on the plans pertaining to the floodplain and revise the text in the drainage report to state that the site is now out of the floodplain. Number: 131 Created: 1 /9/2008 [1/9/08] The retaining wall is taller than 4 feet which requires the wall to have a structural design and a building permit. Also, please add a note on the site plan that the retaining wall requires a building permit. Number: 132 Created: 1 /9/2008 [1/9/08] Please see redlined plans and drainage report for all other comments. Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington Topic: Water/Wastewater Number: 123 Created: 1 /8/2008 [1/8/08] No further comments. Please submit 2 sets of revised paper copies of all plans (plus one drainage report) to me for a final check before submitting your final mylars. Reduced sets and/or PDF's are also acceptable, though paper copies of the utility plans are preferred. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, %ki �q QW-k� Shelby Sommer Associate City Planner Page 4 50 feet for arterials. You will need to provide approximately 4 cross sections of the ROW for the College Ave. frontage. You will only need to show the west half of the street from centerline. Please indicate the cross slope from centerline to flowline on all cross sections. Number: 126 Created: 1/9/2008 [1/9/08] At the south end of the new curb and gutter on College, please provide additional asphalt to protect from undermining where the water leaves the gutter. Number: 127 Created: 1 /9/2008 [1/9/08] It has been determined that an access easement (cross lot access easement) really is not required to extend from College to the alley to comply with the Access Control Plan. The easement only needs to extend from the property to the south (Lot 6) to the new driveway on College. This may eliminate the need for any special language on the Plat as requested by the applicant. A meeting with the City Attorney may or may not still be needed. Number: 128 Created: 1 /9/2008 [1/9/08] Please seethe redlines for other minor comments related to drafting, labeling etc. Another formal round of review is not required however, a revised paper copy should be submitted with the redlines for final check prior to requesting mylars. Number: 129 Created: 1 /9/2008 [1/9/08] It has come to out attention that the parking spaces on the south side of the project have been reduced to less than the minimum required dimension of 9x19 feet. The spaces need to be striped to the standard dimensions. This may not be an issue given the drive aisle width of 24 feet can still be maintained and the access easement may no longer be required. Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 124 Created: 1 /8/2008 [1/8/08] EMERGENCY ACCESS EASEMENT: The fire lane is required to be designated on the plat as an Emergency Access Easement. The fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: • Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. • Have appropriate maintenance agreements that are legally binding and enforceable. • Maintain the required minimum width of 20 feet throughout the length of the fire lane. Page 3 Number: 116 Created: 1 /3/2008 [1/3/08] Comcast Cable does have facilities that run North/South in the alleyway. Please pothole to identify any conflicts with the paving of alley way. Contact Dennis Greenwalt for more information at 970-419-3124. Number: 133 Created: 1 /10/2008 [1/10/08] Post Office (Bonnie Ham): Mailbox must be on College Ave. The Post Office has been unable to contact applicant. Topic: Landscape Plan Number: 122 Created: 1 /8/2008 [1/8/08] Please see landscape plan for redlines (spelling typo and label existing trees with intent to protect or remove). Topic: Site Plan Number: 117 Created: 1 /3/2008 [1/3/08] The parking stalls along the southern property line need to be a minimum of 19 feet long and 9 feet wide (they're shown at 18 feet and 10 feet wide though a few are only 8 feet wide). This must have been a last minute change prior to the hearing that I didn't catch. The drive aisle only needs to be 24 feet, so it may be a matter of just adding one foot to the parking stalls from the drive aisle, but that will impact the access easement as well. The two 8 foot wide parking stalls could be designated as compact/long term parking stalls for employees with dimensions of 8 by 15. Another option would be to reduce the 20 foot parking stalls along the south side of the building to 19 feet, scoot the easement north one foot and then the 18 foot parking stalls would gain that foot. Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number: 50 Created: 8/29/2007 [1/8/08] A copy of the Notice To Proceed will be required prior to construction permit issuance. [10/26/07] Same comment. [10/3/07] No application has been submitted to CDOT as of 10-2-07. [8/29/07] An access permit is required from CDOT. You may submit an application to CDOT concurrently with the City review and the City will coordinate with CDOT such that the access permit can be issued when the plans are approved. Number: 118 Created: 1 /8/2008 [1/8/08] Please clearly label the poles in the alley to be relocated or undergrounded by the utility provider on all applicable sheets. Number: 125 Created: 1 /9/2008 [1/9/08] An electronic drawing for the College Avenue design was emailed to me on 1/8/08. The plan and profile looks good but LCUASS requires cross sections every Page 2 STAFF PROJECT REVIEW City of Fort Collins Lucy Dinneen/Kay Stallworthy, Date: 01/14/2008 Cadence Development LLC 8480 E. Orchard Rd. Ste#6900 Greenwood Village, CO 80111 Staff has reviewed your submittal for ADVANCE AUTO PARTS PDP - TYPE I AND FINAL PLANS, and we offer the following comments: ISSUES: Department: Advance Planning Issue Contact: Clark Mapes Topic: Architectural Elevations Number: 135 Created: 1 /11 /2008 [1/11/08] Per our discussions, use ground face block on the front portion of the building, above the main entrance on the s. and e. sides; and split face block for the rest. To help offset cost, the brick'dip' on the back side may be eliminated. However. Please provide either the precast sill or a course of ground face block in place of the sill, to avoid a completely uniform back wall. Topic: Site Plan Number: 134 Created: 1 /11 /2008 [1/11/08] The front entry walk needs a minor adjustment to improve direct visibility and access to the front door per our discussions and a sketch provided at Staff Review meeting. Department: Current Planning Issue Contact: Shelby Sommer Topic: Architectural Elevations Number: 119 Created: 1 /8/2008 [1/8/08] 1 would like to see pictures of an existing building that features the specified color of split -face block. I am concerned that the color/mix specified may look flat from a distance, but a photo would clarify. Also, I echo Clark's comments from previous rounds of review regarding the intensity of the red color specified for the column and storefront. Is this something that can be "toned down" to a deeper shade or maybe could you wrap the column in masonry rather than painting it red? Number: 121 Created: 1 /8/2008 [1/8/08] Please include a detail of the retaining wall with the proposed materials and handrail on the Architectural Elevations sheet. Topic: General Number: 115 Created: 1 /3/2008 [1/3/08] The following departments/agencies have no further concerns: Park Planning, Zoning, Water Conservation, GIS, Environmental Planning Page 1