HomeMy WebLinkAboutADVANCE AUTO PARTS - PDP - 26-07 - CORRESPONDENCE -these items and submit two sets of plans (site, landscape, plat and elevations) to me
as soon as possible, but no later than two weeks before the public hearing.
I will prepare a written staff report analyzing your project with recommendations to
the Administrative Hearing Officer. At the public hearing, I will present the staff
report and findings, and then you will have the opportunity to give a presentation
about the project. After your presentation the Hearing Officer will open the hearing
to comments and questions from the public. Both the applicant and City staff may
be asked to respond to comments and questions as necessary.
After the Public Hearing, the Hearing Officer has up to 10 working days to render a
decision on the project. Within 14 days of the decision date, any aggrieved party
may file an appeal of the decision to City Council. If this two week period passes
without an appeal, you are then permitted to submit your final plans per the final
plans submittal checklist.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
Shelby Sommer
Associate City Planner
Pa-e 5
[10/26/07] See other minor comments on the redlines.
Topic: Technical Services
Number: 112 Created: 10/31/2007
[10/31/07] Please define the alley and the access easement on the Plat.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 109 Created: 10/30/2007
[10/30/07] PFA has no further comments or concerns at this time.
Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque
Topic: Stormwater
Number: 101 Created: 10/25/2007
[10/25/07] A drainage easement is required for the limits of the detention pond
including the portion of detention in the parking lot.
Number: 111 Created: 10/31 /2007
[10/31/07] Amount of quantity detention is now resolved after resubmittal of
calculations via email on October 26th, 2007. Stormwater is ready for a hearing.
Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 75 Created: 10/2/2007
[10/28/07] Delete notes P3 and P5.
[10/2/07] Notes P3 and P5 on overall utility do not appear to apply to this project.
Please remove.
Number: 76 Created: 10/2/2007
[10/28/07] Minimum grade on a 4-inch sewer servic3e is 2%. Revise note P4.
[10/2/071 Revise note P4 as shown on redlined plans.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 5 Created: 8/17/2007
[10/29/07] Still need the foundation plantings.
[9/26/071 Still need foundation plantings along south wall.
[8/17/07] Need 3 to 4 trees in the 5' landscape strip along the south lot line (Section
3.2.1(E)(4). Need foundation plantings per Section 3.2.1(E)(2)(d)
This project is ready to be scheduled for an Administrative Public Hearing after the
highlighted items above have been resolved (addressing our response to the
alternative compliance request and providing the alley design). Please resolve
Page 4
[10/26/07] There are still some line types that are not copying well because they are
too light. Please see the redlines for clarification.
[10/3/07] Please use a darker line type for all new/proposed sidewalks and ramps in
the ROW and label them as new or proposed.
Number: 90 Created: 10/3/2007
[10/26/07] Please show the curb more clearly on the median planted island adjacent
to the alley. The curb should be located just outside the alley R.O.W. Please also
revise the cross section of the island to reflect curb on both sides.
[10/3/07] The landscaped medians along the alley should have a barrier curb on
both sides to prevent nuissance irragtion water from draining over the alley asphalt
and degrading the edge of asphalt.
Number: 91 Created: 10/3/2007
[10/26/07] It has come to my attention that there is a recently approved and
constructed project just a little south of this proposed project. This approved project
called THE HUMAN BEAN has been constructed and the engineer had provided a
preliminary off -site street design for College Ave. extending to the north. Per
LCUASS standards, you need to provide 1000 feet of off -site preliminary design for
Advance Auto just as they did with the Human Bean project. Rather than going 1000
feet, please just show how your preliminary off -site design will tie into that done by
the Human Bean project. I can help you obtain approved plans for the Human Bean
if needed. This may be completed with final compliance review and does not need
to be reviewed prior to a hearing.
[10/3/07] The minimum flowline grade allowed is 0.5 percent. The College
proposed flowline shown is 0.2 percent. See sheet C6 profile.
Number: 102 Created: 10/26/2007
[10/26/07] The variance request for the reduced width alley has been denied as
submitted. Per my email to Lucy, the alley must be constructed to full standard
width (20 feet) which will require tree removals and easements for off -site grading
and construction on the west side. The variance will only be accepted if it clearly
states that the reduced width alley is an acceptable access to the site when the long
term access control plan is implemented.
Number: 103 Created: 10/26/2007
[10/26/07] Alley design - the variance request has been denied as submitted.
Vertical curves do not meet LCUASS standards for minimum length. See LCUASS
7-17 & 7-18. Please label and station in the profile what is being constructed with
this project and what will be built by others.
Number: 104 Created: 10/26/2007
[10/26/07] Please label the alley intersection to be constructed per LCUASS DWG
803 and 7-11 F. Please add both of these details to the detail sheets.
Number: 105
Created: 10/26/2007
Pa-c 3
e
[11/2/07] The alternative compliance request will be supported in general, but the
applicant must provide a stronger transition between the building wall and sidewalk
in place of the foundation plantings. This could be achieved with a wider sidewalk,
ivy (Englemann), or more architectural detailing along the south wall (for example
recessed faux accent windows, decorative light fixtures etc.) along this wall in place
of the required foundation plantings.
[10/29/07] Zoning's comment from the last round still has not been addressed.
Foundation planting beds at least 5 feet wide are required along 50% of high
visibility walls. The south wall is highly visible and foundation plantings are required
per code.
Topic: Site Plan
Number: 106 Created: 10/29/2007
[10/29/071 For clarity and filing purposes, please add the property's legal description
to the site plan (Lot 1 of the Advance Auto Parts Subdivision...). Thanks!
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 50 Created: 8/29/2007
[10/26/07] Same comment.
[10/3/07] No application has been submitted to CDOT as of 10-2-07.
[8/29/07] An access permit is required from CDOT. You may submit an application
to CDOT concurrently with the City review and the City will coordinate with CDOT
such that the access permit can be issued when the plans are approved.
Number: 51 Created: 8/29/2007
[10/26/07] Same comment. See the Landscape Plan. Need to show dimensions for
tree planting on College. They look like they are centered in the parkway strip.
[10/3/07] Street trees must be located such that they will not need to be removed
when College is widened. Please consult with Planning and locate the trees as
close to the sidewalk as possible.
[8/29/07] Please show the street tree locations on College on the Utility Plans. The
locationof street trees on College is important such that the trees will not need to be
removed or relocated when College is widened. Please space the the trees with
respect to the ultimate sidewalk location rather than centering them in the parkway
between the sidewalk and curb.
Number: 87 Created: 10/3/2007
[10/26/07] The handrail must be located on top of the retaining wall. If it is to
located in the sidewalk per the detail, you will need to add 6 inches of width to the
sidewalk (6.5 foot width sidewalk). See the detail and redlines for clarification
[10/3/07] A handrail must be placed along the detention pond adjacent to the new
sidewalk. Please show/call out the hand rail on the plans and provide a detail.
Number: 88
Created: 10/3/2007
Paee
e
STAFF PROJECT REVIEW
Citv of Fort Collins
Lucy Dinneen/Kay Stallworthy Date: 11/05/2007
Cadence Development LLC
8480 E. Orchard Rd. Ste#6900
Greenwood Village, CO 80111
Staff has reviewed your submittal for ADVANCE AUTO PARTS PDP - TYPE I, and
we offer the following comments:
ISSUES:
Department: Advance Planning Issue Contact: Clark Mapes
Topic: Architectural Elevations
Number: 114 Created: 11/5/2007
[11/5/07] At the front, taller module of the building, a sill or course should be
provided where the brick meets the block. Also, can a special course be provided
immediately below the shaped cap? Either a soldier course or square course -
maybe ground face block? These details can be part of final plans.
Topic: General
Number: 113 Created: 11/5/2007
[11/5/07] The scale is off on elevations and the landscape plan. Not a big deal,
could be labeled NTS, or go ahead and make the elevations 1 "=10' and the
landscape plan 1 "=15'. (Unusual scales, but would be helpful to design ideas).
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 110 Created: 10/30/2007
[10/30/07] Comcast (Don Kapperman): If Comcast facilities need to be relocated or
under -grounded in the alley then the owner of this project will need to pay to have it
moved or under -grounded. Please see the attached document for the location of the
Comcast facilities in the alley. Please contact Don at (970) 484-7166 or
don_kapperman@cable.comcast.com.
Topic: Landscape Plan
Number: 107 Created: 10/29/2007
[10/29/071 Please see redlines. One of the selected street trees is not on the list of
approved street trees. Discuss street tree selections with City Forester, Tim
Buchanan.
Also, tree sizes specified are unrealistic - 6 foot caliper! Do you mean inches? Or 6
foot high coniferous trees? See the Land Use Code for minimum sizing
requirements and correct plan.
Number: 108
Created: 10/29/2007
PaL,e 1