HomeMy WebLinkAboutSOLAR VILLAGE MAPLE - PDP - 23-07 - CORRESPONDENCE -.r
.. ,
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 1 Created: 6/1 /2007
[6/1/07] The residential units are classified as mixed -use dwelling units, and are allowed as
a Type 1 review. Commercial uses will be subject to a Type 1 or Type 2 review depending
on the specific use (per the table in Section 4.16(B)(2) of the Land Use Code).
Number: 2 Created: 6/1 /2007
[6/1/07] Parking required for dwelling units. 1.5 spaces per 1 bdr. Unit, 1.75 spaces per 2
bdr. Unit and 2 spaces per 3 bdr. Unit. If the garage spaces are 2 car garages, then Its ok, if
1 car garage, then more parking is required. NOTE: If City Council passes a code change
on Second Reading on June 19th regarding residential parking in the TOD area, then no off-
street parking for the residential units will be required and the parking count will comply with
the code.
Your next steps will be to hold a neighborhood meeting and submit your formal application
for development review. Contact me to schedule the neighborhood meeting. Refer to
http:/tfogov.comtfile-gateway/?id=39&ts=20070424123955 for a list of submittal
requirements. Refer to http:/tfcgov.com/file-gateway/?id=39&ts=20070424123955 for the
submittal checklist. If you have any questions regarding the submittal or any other issues
related to this project, please feel free to call me at (970) 221-6206.
Sincerely,
Anne H. Aspen
City Planner
Page 8
7
Number: 34 Created: 6/6/2007
[6/6/07] Any structure in the 100-year floodplain must have the lowest floor and all HVAC
and mechanical elevated or floodproofed 18" above the flood elevation. If units are attached
and are not separate buildings, then all units in that building must meet this requirement.
Number: 35 Created: 6/6/2007
[6/6/07] An option is to change the configuration of that building, so as to not be in the
floodplain and therefore not have to elevate the structure.
Number: 36 Created: 6/6/2007
[6/6/07] No critical facilities are allowed in the floodplain.
Number: 37 Created: 6/6/2007
[6/6/07] Any work done in the floodway (landscaping, etc.) must be at or below the existing
elevations or show no -rise by hydraulic modeling. A no -rise certification will be required.
Number: 38 Created: 6/6/2007
[6/6/07] A floodplain use permit will be required for each structure in the floodplain and for
the site work in the floodplain or floodway. Each permit is $25.
Number: 39 Created: 6/6/2007
[6/6/07] Any structure built in the floodplain will have a hold on the CO until a FEMA
elevation or floodproofing certification is approved based on as -built conditions.
Number: 40 Created: 6/6/2007
[6/6/07] See Chapter 10 of City Code for complete floodplain regulations. See also the
attached Quick Guide to floodplain regulations.
Number: 41 Created: 6/6/2007
[6/6/07] Floodplain Admin contact is Marsha Hilmes-Robinson, 224-6036.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterMastewater
Number: 59 Created: 6/7/2007
[6/7/07] Existing water/sewer mains include the following:
16-inch water and 12-inch sewer in Maple; 8-inch water and 6-inch sewer in Meldrum.
Number: 60 Created: 6/7/2007
[6/7/07] Separate water/sewer services are required for each building, and within each
mixed -use building, separate water/sewer services are required for the commercial and
residential portions of the building.
Number: 61 Created: 6/7/2007
[6/7/07] Grease interceptors are required for any restaurants in the project.
Number: 62 Created: 6/7/2007
[6/7/07] Development fees and water rights will be due at building permit. Credit will be
allowed for existing service accounts.
Page 7
1-9
Number: 25 Created: 6/6/2007
[6/6/07] FIRE SPRINKLERS FOR GARAGES/STUDIOS: If the two buildings shown as
garages also have second -floor studio units, the buildings shall be equipped with approved
fire -sprinkler systems, including the garages.
Number: 26 Created: 6/6/2007
[6/6/07] FIRE NOTIFICATION SYSTEMS: Horn/strobe notification of fire alarm may be
required for common areas. Approved smoke detectors shall be required for residential
areas.
Department: Stormwater-Water-Wastewater Issue Contact: Glen Schlueter
Topic: Stormwater
Number: 27 Created: 6/6/2007
[6/6/07] The design of this site must conform to the drainage basin design of the Old Town
Master Drainage Plan as well the City's Design Criteria and Construction standards.
Number: 28 Created: 6/6/2007
[6/6/07] The city-wide development fee is $3,070.00/acre ($0.0705/sq.ft.) for new
impervious area over 350 sq.ft. No fee is charged for existing impervious area. This fee is
to be paid at the time each building permit is issued. It is important to document all existing
impervious area since it is grandfathered. Therefore the fees are only charged for new
impervious area and it affects the requirements of onsite detention
Number: 29 Created: 6/6/2007
[6/6/07] A drainage and erosion control report and construction plans are required and they
must be prepared by a Professional Engineer registered in Colorado.
Number: 30 Created: 6/6/2007
[6/6/07] In the Old Town drainage basin water quantity detention is required if there is an
increase in imperviousness greater than 5000 square feet. Since this project will have less
than that, water quality treatment is all that is needed. Forty hour extended detention is the
preferred method.
Number: 31 Created: 6/6/2007
[6/6/07] There is a storm sewer in Maple with inlets on the west side of Meldrum St. This
could serve as a lower outfall.
Number: 32 Created: 6/6/2007
[6/6/07] It appears the court yard is to be used for water quality treatment. The roof design
seems to work to direct the runoff to the court yard. However the outlet flow control
structure shown will require an outflow in an easement to the public ROW. The water quality
extended detention pond area will also need to be in an easement.
Number: 33 Created: 6/6/2007
[6/6/07] A portion of the site is in the Old Town floodplain. There are two splits that are
shown on the floodplain map. We have looked at these to make sure the mapping is
accurate. It appears that the split in the alley to the east of Meldrum that shows flood fringe
to the north is not valid. The floodway line will also be the flood fringe line. However, the
floodplain and split at Meldrum is valid. Therefore floodplain regulations do apply to that
portion of the floodplain. This floodplain appears to impact Unit D.
Page 6
T
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 17 Created: 6/6/2007
[6/6/07] APPLICABLE FIRE CODE: The project will fall under requirements of the 2006
International Fire Code and applicable local amendments.
Number: 18 Created: 6/6/2007
[6/6/07] DEMOLITION: The project shall comply with 2006 IFC Chapter 14 Fire Safety
During Construction and Demolition.
Number. 19 Created: 6/6/2007
[6/6/07] AUTOMATIC FIRE SPRINKLERS: The three-story, mixed use buildings shall
comply with automatic fire sprinkler requirements as specified in NFPA 13. Per PDR
discussion, this includes all attic spaces, etc. All balconies shall also be equipped with
sprinkler heads.
Number: 20 Created: 6/6/2007
[6/6/07] WATER SUPPLY: Fire hydrants, where required, must be the type approved by the
water district having jurisdiction and the Fire Department. Hydrant spacing and water flow
must meet minimum requirements based on type of occupancy. Minimum flow and spacing
requirements include: Commercial, 1,500 gpm at 20 psi residual pressure, spaced not
further than 300 feet to the building, on 600-foot centers thereafter. These requirements may
be modified if buildings are equipped with automatic fire sprinkler systems.
Number: 21 Created: 6/6/2007
[6/6/07] FIRE LINE: All fire sprinkler lines shall be a minimum of 6 inches in diameter,
unless hydraulic calculations show that a smaller diameter line can supply sufficient water to
the system:
Number: 22 Created: 6/6/2007
[6/6/07] FIRE DEPARTMENT CONNECTION: Fire department connections shall be
installed remote from the buildings, and located on the street or fire lane side of buildings,
fully visible and recognizable from the street or nearest point of fire department vehicle
access or as otherwise approved by the fire code official. (We can discuss FDC locations
when you have the final site plan/building occupancy and location.) 2006 International Fire
Code 912.2.1 and PFA Bureau Policy
Number: 23 Created: 6/6/2007
[6/6/07] KNOX BOX REQUIRED: Poudre Fire Authority requires a "Knox Box" to be
mounted on the front of every new building equipped with a required fire sprinkler system or
fire alarm system. PFA BUREAU POLICY 88-20
Number: 24 Created: 6/6/2007
[6/6/07] ADDRESS NUMERALS: Address numerals shall be visible from the street fronting
the property, and posted with a minimum of six-inch numerals on a contrasting background.
(Bronze numerals on brown brick are not acceptable). Commercial occupancies will be
numbered as suites and residential occupancies will be numbered as units. Contact Cade
Dann for more information on addressing.
Page 5
Number: 53
[6/7/07] Maple Street - no doors shall open in
foundations shall encroach into the ROW. An
possible awning structures and will require an
necessary insurance be provided.
Created: 6/7/2007
to the ROW. No part of the building including
encroachment permit may be obtained for
agreement with the City that includes
Number: 54 Created: 6/7/2007
[6/7/07] Maple Street - The sidewalk on Maple shall be constructed as a detached walk in
the ultimate location. Due to the zero set back proposed for the building, the walk must be
attached to the building at the ROW line. When sidewalks are attached to buildings, they
must then be widened to a minimum of 8 or 10 feet or as directed by Transportation
Planning. The proposed site plan does not accommodate any outdoor seating or sidewalk
dining. The existing newly constructed ramps at Maple and Meldrum may be used with the
new design. Standard curb and gutter shall be constructed along the entire street frontage
on Maple and Meldrum. Any new striping for angle parking that may be gained will be at the
developer's expense and should be shown on the utility plans.
Number: 55 Created: 6/7/2007
[6/7/07] Given the need for some ROW dedication at the alley intersection flare and several
potential easements for emergency access, utilities and drainage, it is recommended that
the property is re -platted, however, all dedications may be done by separate document at a
City fee of $250 per document for review and processing.
Number: 56
Created: 6/7/2007
[6/7/07] All sidewalk, curb and gutter shall be constructed on Meldrum per LCUASS
standards (local residential).
Number: 57 Created: 6/7/2007
[6/7/07] Any existing broken (or damaged during construction) sidewalk, curb and gutter
shall be replaced at the direction of the City Engineering Inspector with this project.
Number: 58 Created: 6/7/2007
[6/7/07] All applicable Transportation Development Review Fees (TDRF) shall be paid at
the time of submittal.
Department: Light & Power
Topic: General
Number: 14
Issue Contact: Janet McTague
Created: 6/6/2007
[6/6/07] Credit will be given for the existing services. Our maps indicate that there are four
services, one of which is three-phase. Normal development charges will apply.
Number:15 , Created: 6/6/2007
[6/6/07] Three-phase power is available to this site. We'll need to coordinate a transformer
location that is within 10' of a paved surface.
Number: 16 Created: 6/6/2007
[6/6/07] All units will need to be individually metered. We request that you gang the meters
on each building in one location. Electric and gas meters will need to either be on separate
walls or have a minimum of three feet of separation.
Page 4
Number: 45 Created: 6/7/2007
[617/07] A complete PDP submittal is required for review with a Type I or Type II process.
The developer will be required to enter into a Development Agreement (DA) with the City
and a development construction permit (DCP) must be obtained prior to starting
construction.
Number: 46 Created: 6/7/2007
[6/7/07] A utility coordination meeting is strongly recommended for this site due to the
limited space for services. Please contact me at 970-416-2292 to schedule this coordination
meeting with at least one week advance notice.
Number: 47 Created: 6/7/2007
[6/7/07] Full alley improvements will be required in compliance with LCUASS street
standards. There are two alley design options. The alley must be constructed along the
property frontage and a minimum of 500 feet of off -site preliminary design must be provided
to the north. It was discussed at the meeting that alley improvements have been completed
to the north for another development. You will need to obtain the as -built conditions and
show how the alley design for your development will tie into the existing improvements. The
same alley design option should be used for consistency and all drainage must be
adequately conveyed.
Number: 48 Created: 6/7/2007
[6/7/07] A temporary construction easement may be required to the east of the alley for
alley construction. Any proposed sidewalk adjacent to the alley shall be located outside the
min. 20 feet of asphalt or concrete paving and within ROW or a public access easement
dedicated to the City.
Number: 49 Created: 6/7/2007
[6/7/07] Please carefully review the LCUASS alley standards regarding corner cuts and
garage setbacks. The site plan submitted for this meeting does not provide for the
necessary comer cuts/flares at the intersection to the street and garage set backs of 8 feet
or 20 feet minimum.
Number: 50 Created: 6/7/2007
[6/7/07] No more than 750 sf of alley surface area may drain over the sidewalk into the
street. Given the proposed water quality pond outfall to the alley, it is highly likely that an
inlet will be needed at the far south end of the alley to collect all of the drainage and convey
it to the storm drain line on Maple.
Number: 51 Created: 6/7/2007
[6/7/07] It appears that no additional ROW dedication will be required for this project
(except flares at alley intersection). However, LCUASS standards do require utility easement
dedication behind the ROW on private property. It is not likely that the utility easements will
be needed given the in -fill development conditions, however, a formal variance request must
be submitted and routed for approval. Maple, Meldrum and the alley will need an approved
variance for an 8 foot utility easement behind the ROW.
Number: 52 Created: 6/7/2007
[6/7/07] The drive approach at the alley intersection with the street will need to be
reconstructed to current LCUASS standards.
Page 3
Number: 6 Created: 6/5/2007
[6/5/07] Street trees must be placed on 30-40 foot centers. Clearly and graphically
differentiate between existing and proposed trees on site.
Number: 7
Created: 6/5/2007
[6/5/07] Garages on the alley must meet the backing dimension standards.
Number: 9 Created: 6/5/2007
[6/5/07] Please incorporate bike parking and amenities in your site plan.
Number: 10 Created: 6/5/2007
[6/5/07] If the building is over 40 feet tall, a special height review will be required as
described in Section 3.5.1 of the Land Use Code.
Topic: Architecture Plans
Number: 8
Created: 6/5/2007
[6/5/07] Because this site is in a predominantly existing residential neighborhood with a
strong sense of identity, please pay special attention to the compatibility standards in
Section 3.5.1 of the Land Use Code. Also, consider how you will buffer the project from
existing abutting residential properties.
Department: Environmental Planning Issue Contact: Dana Leavitt
Topic: General
Number: 63 Created: 6/13/2007
[6/13/07) As this is a brownfield site, identify previous uses and any hazmat related issues.
Topic: Architecture Plans
Number: 64 Created: 6/13/2007
[6/13/07] Great to see a green building project come into the city from start to finish. The
City has begun the process of developing a city-wide green building program. I am
available to discuss any thoughts or ideas you have for this project. Be sure to also contact
Gary Schroeder in the Utility Department for information on our Integrated Design
Assistance Program (IDAP) which provides technical and monetary assistance with building
sustainable projects. His contact info is gschroeder@fcgov.com or 221-6395.
Number: 65 Created: 6/13/2007
[6/13/07] If the trash enclosure and the transformer share the same space, ensure that both
functions can operate independently in the allocated space. Refer to Section 3.2.5 of the
Land use Code and http://fcgov.com/recycling/pdf/enclosure-guidelines0804.pdf for design
guidelines relating to trash enclosures.
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 43 Created: 6/7/2007
[6/7/07] Standard comment - Larimer County Road Impact Fees and City Street Oversizing
Fees will apply. Contact Matt Baker in Street Oversizing at 224-6108 for an estimate of both
fees.
Number: 44 Created: 6/7/2007
[6/7/07] A transportation impact study (TIS) will be required. Please contact the City Traffic
Engineer, Eric Bracke, 224-6062 to set up a TIS scoping meeting.
Page 2
T.
STAFF PROJECT REVIEW
City of Fort Collins
Justin Larson Date: 06/13/2007
JCL Architecture
201 S College Ave
Fort Collins CO 80524
Staff has reviewed your submittal for Solar Village Maple Preliminary Design Review, and
we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
In answer to the questions you posed:
#1: Existing ROW and utility easements are adequate, but please see Randy Maizland
#51 below for more information.
#2: Yes.
#3: Please refer to the following comments below: Anne Aspen #4, Randy Maizland #49,
53, 54, 56 and 57.
#4: Please refer to Janet McTague's comments below.
#5: Please refer to Carle Dann's comments below.
#6: This may need further discussion as you progress with the design. Please contact
Carle Dann to discuss.
#7: Please refer to Glen Schlueter's comments below.
#8: Please refer to Roger Buffington's comments below.
Number: 3 Created: 6/5/2007
[6/5/07] Please put a north arrow and scale on all drawings.
Number: 11 Created: 6/5/2007
[6/5/07] This project represents a big change for this established neighborhood so you'll
need to have a neighborhood meeting early on in the design process to share your plans
with the neighbors. Please contact me to arrange this meeting.
Number: 12 1 Created: 6/5/2007
[6/5/07] As you develop the design, please keep mechanical equipment in mind —either
locate it on the roof or provide adequate space and buffering for it on the ground level.
Topic: Site Plan
Number: 4 Created: 6/5/2007
[6/5/07] 1 don't understand the proposed streetscape. Why is there a 2.5 foot attached
sidewalk/curb? And why is there a widened patch on the east end of the Maple frontage?
Please consider using a more urban streetscape (wide sidewalks with trees in grates)
transitioning to detached sidewalk to north and east.
Number: 5 Created: 6/5/2007
[6/5/07] Please show proposed on -street parking scheme. Please also show at least part of
adjacent buildings on site plan or overall site context map.
Page 1