HomeMy WebLinkAboutSOLAR VILLAGE MAPLE - FDP - 23-07/A - CORRESPONDENCE - (3)We have added underdrains for the proposed porous pavement system.
Number: 95 Created: 1 /4/2008
[1/4/08] Please provide an erosion control escrow calculation and erosion effectiveness
calculations.
An erosion control escrow calculation has been included with this submittal.
Number: 96 Created: 1 /4/2008
[1/4/08] Please see other minor comments redlined on the plan set.
The redlines have been addressed.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterlWastewater
Number: 39 Created: 8/16/2007
[1/2/08] Documents should also address situation with the water and sewer services.
[9/18/07]
[8/16/07] Provide copy of the management organizations governing documents that outline
maintenance responsibility for.the common fire line.
The HOA documents will be provided.
Number: 87 Created: 1 /2/2008
[1 /2/08] Show ALL existing water/sewer services to be abandoned. Services must be
abandoned at main. Add notes to contact Water Utilities (221-6700) to coordinate
abandonment.
The plans have been updated as requested.
Number: 91 Created: 1 /3/2008
[1/3/08] Use current details for 1.5" and 2" water meters.
The current details have been added to the plan set.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 80 Created: 12/12/2007
[12/12/07] A condition should be placed on the final plan approval that the development is
approved only for Type 1 uses. Type 2 uses will require a new development plan.
Understood.
Thank you,
Justin Larson, AIA
Page 5
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 92 Created: 1 /4/2008
[1/4/08] ADDRESSING: Per my discussion with Justin from JCL, we will meet with Anne
Aspen, Tim Varrone and Bonnie Ham to discuss and decide on how to address the site.
This meeting will be scheduled next week.
Department: Transportation Planning Issue Contact: Denise Weston
Topic: General
Number 90 Created: 1 /2/2008
[1/2/08] Recommend internal bike racks for residential units.
Bike racks have been updated and included with our submittal.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Floodplain Comments
Number: 88 Created: 1 /2/2008
[1/2/08] 1. Site Plan — The floodplain and floodway lines are not in the correct location.
Please review and revise. — REPEAT
This has been corrected on our submittal.
2. The previous plans showed a dividing line between units A/B and the lobby. This was to
show that these are distinct buildings that are not connected on the lower floor. It is
important to have this distinction so that the requirement to elevate the floor level for
floodplain purposes only applies to Unit A/B. Please re -add these lines and make notes
about this issue on the plans.
This has been re -added to the plans.
3. Please describe in drainage report how the no -rise issue is being addressed in the
floodway. — REPEAT
This information has been added to Appendix A.
4. Drainage Report — Appendix A — The no -rise floodplain information needs to be updated
with the cross -sections and calculations that were provided to us via e-mail in October.
This information has been added to Appendix A.
Topic: Stormwater
Number: 94 Created: 1 /4/2008
[1/4/08] A pervious pavement needs to be selected and a detail submitted for review and
approval. These pervious pavement systems also need underdrains for these soil
conditions, which can drain into the proposed storm sewer. Please call me at 416-2418 if
you want more information.
The porous pavement section has not been fully designed by the Geotechnical
Engineer. The design will be finalized after the geotechnical engineer can test the
percolation of the soils in the immediate area of the building. These percolation tests
will not be possible until construction is underway due to the location of the existing
buildings. A report will be provided to the city at the time of construction that shows
the details for the porous pavement system.
I spoke with Mike Herzig at the city and they do not need to approve the pavement
type used on private property.
Page 4
canopies. There will likely be a conflict with the balcony overhang on the south side of the
courtyard. You may need to locate that tree further to the north for it to fit.
This has been updated to show the canopy at maturity.
umber: 107 Created: 1 /9/2008
[1/9/08] Show the deck overhang on this page not the site plan.
This has been updated and included with our submittal.
Topic: Lighting Plan
Number: 108 Created: 1 /9/2008
[1/9/08] The lighting plan looks great. Thanks for all the work you did on that.
Topic: Plat
Number: 109 Created: 1 /9/2008
/ [1/9/08] The plat looks fine from a planning perspective.
V You are welcome.
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 81 Created: 12/31 /2007
[12/31/07] A hand rail or seat wall is needed at the corner of Maple and Meldrum. The
single step will create a tripping hazard at this location. Please clearly show this on the
utility and grading plan sheets and call it out with a detail.
We have revised the layout of this corner as requested.
Number: 82 Created: 12/31 /2007
[12/31/07] There is a duplication of construction note numbers on sheet HC01. Please
correct this error.
We have corrected this error on the plans.
Number: 83 Created: 12/31 /2007
[12/31/07] Details are needed for sidewalk hand rails and also sidewalk chase drains shown
on the Meldrum sidewalk.
The details are now shown in the plans.
Number: 84 Created: 12/31 /2007
[12/31/07] Please clearly show that the doorways to the building on the Meldrum side do
not open into the ROW.
The direction that the doors open is now being shown on the plans.
Number: 85 Created: 12/31 /2007
[12/31/07] Please show the handrail in cross section B-B on sheet GR01 and show
dimensions.
This cross section has been updated as requested.
Number: 86 Created: 12/31 /2007
[12/31/07] Another formal round of review is not required to address Engineering
comments. You may submit revised drawings electronically or hard copies for final check
prior to preparing mylars. Please return all redlines with any mylar prints.
As requested, we have submitted the plans.
Page 3
Number: 110 Created: 1 /9/2008
C) [1/9/08] Please refer to the decision from your administrative hearing, especially the
condition of approval. We will need more information about building materials, colors and
design before we will sign off on your mylars.
This will be provided, will call to set up building material meeting.
Topic: Cover Sheet
Number: 99 Created: 1 /9/2008
,[1/9/08] Couple minor redlines: change date to 2008 and change Director's name to
/ Planning and Zoning --sorry, we changed our name.
This has been updated and included with our submittal.
0 Topic: Overall Site Plan
Number: 100 Created: 1 /9/2008
[1/9/08] The software that you use is really challenging for us to decipher since it is model -
based. Please use a heavier line to indicate any steps or walls along the streetscape vs.
just pavement scoring.
This has been updated and included with our submittal.
Number: 101 Created: 1 /9/2008
[1/9/08] The easternmost bike racks do not appear to be on a paved surface. Bike racks
must be mounted securely on a paved surface and there must be sufficient paving around
the rack for bike access.
This has been updated and included with our submittal.
Number: 102 Created: 1 /9/2008
[1/9/08] The driveway from the alley does not meet minimum width requirements. Do you
/ need the sidewalk on the south side of the drive aisle? Perhaps it can be eliminated?
V This has been updated to show that the conc. Is only an apron in front of the garages.
Number: 103 Created: 1 /9/2008
[1/9/08] 1 still have concerns about the westernmost parking space. If the lot is full, how will
,that car back and turn to get out? Will it have to back all the way out?
This is a very low use and long term parking area. If necessary We would shift the
handicap and unloading are to the end to alleviate this concern, but this solution is
not preferable.
Number: 104 Created: 1 /9/2008
[1/9/08, Please don't show landscaping on the site plan.
This has been updated and included with our submittal.
T pic: Elevations
umber: 105 Created: 1 /9/2008
[1/9/08] The north elevation of the Meldrum fronting building must have materials and
design consistent with the front. See Section 3.5.3 (D)(3).
The north elevation has been updated and included with our submittal.
Topic: Landscape plan
umber: 106 Created: 1 /9/2008
1/9/08] All of the trees to be planted are shown having a circumference of 4-10 feet. This
is unrealistic. Especially in the courtyard, please show them with reasonably -sized
Page 2
STAFF PROJECT REVIEW
Cituf Port Collins
Justin Larson Date: 1/29/2008
JCL Architecture, Inc.
401 S. Mason St.
Fort Collins, CO 80524
Please find in bold our response to the Staff comments dated 01/09/08 for Solar
Village Maple Preliminary Design Review, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
/ Number:10 Created:8/14/2007
[1/2/08] Comcast Cable still has concerns about having Utility Easements outside of the
road rights of way and along the alley way to place facilities.
[8/14/07] Comcast comments that the plat map needs to show a 6' utility easement so
Comcast can place their facilities in that easement to feed this project.
As per an email and telephone conversations with Don Kapperman at Comcast Cable,
they are o.k. not being in an easement as long as they can go joint trench with power
and telephone. The joint trench for all of these facilities will be within the alley way.
The cable service for this site will be at the northeast corner of this site along with the
power and telephone.
Number: 14 Created: 8/14/2007
[1/2/08] Repeat comment. ,
[8/14/07] Water Conservation has provided you with a comment sheet which is attached to
V your comment letter.
The comment sheet has been filled out and included with our submittal.
Number: 89 Created: 1 /2/2008
[1/2/08] The County Assessor's Office comments that Solar Village LLC is not the current
owner. The current owners of record are: Heifner, Jerry W, Carole and Malone, James P.
Please contact Megan Harrity with the Larimer County Assessor's Office at 498-7065 if you
have questions.
The property is currently under contract and will have two closings over the next two
months.
Number: 97 Created: 1 /7/2008
[1/7/08] The following departments and agencies indicate that they have no further issues
or concerns with this project: Environmental Planning, Post Office, Real Estate (ROW).
Thank you.
Number: 98 Created: 1 /7/2008
l/7/08] Water Conservation has comments which are attached to this comment letter.
Please review.
The comments are understood and addressed.
Page I