Loading...
HomeMy WebLinkAboutSOLAR VILLAGE MAPLE - FDP - 23-07/A - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONNames of all general and limited partners: Alex Platt Mark Kostovny Charlie Randall Accela Automation: ShowPai tai140 - T8108-D Page 1 of 1 RECEIPT CITY OF FORT COLLINS NEIGHBORHOOD & BUILDING SERVICES 281 N. COLLEGE AVE. Phone:970-221-6760 P. O. Box 580 Fax:970-224-6134 Application Type: Building / Misc / General / NA Application #: B0708185 Project Name: SOLAR VILLAGE MAPLE POP Address: Owner Name: Receipt No.: 127893 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 2333 $1,000.00 12/06/2007 03:46:12 PM DBELLFY Owner Info.: Work PAYMENT FOR DEVELOPMENT REVIEW FOR SOLAR VILLAGE MAPLE PDP, $1000 Description: #2333 AND TDR FEE $1000 WITH AN UNPAID BALANCE OF $233 #2332 T8108-D Version 4.0 http://dtsweb02.fcgov.com/operations/permit/index.cfm?FUSEACTION=ShowPayDetail4... 12/6/2007 PV Accela Automation: ShowPai tai140 - T8108-D Page 1 of 1 RECEIPT CITY OF FORT COLLINS NEIGHBORHOOD A BUILDING SERVICES 281 N. COLLEGE AVE. Phone:970-221-6760 P. O. Box 580 Fax:970-224-6134 Application Type: Building / Misc / General / NA Application #: B0708185 Project Name: SOLAR VILLAGE MAPLE POP Address: Owner Name: Receipt No.: 127892 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 2332 $1,233.00 12/06/2007 03:45:30 PM DBELLFY Owner Info.: Work PAYMENT FOR DEVELOPMENT REVIEW FOR SOLAR VILLAGE MAPLE PDP, $1000 Description: #2333 AND TDR FEE $1000 WITH AN UNPAID BALANCE OF $233 #2332 T8108-D Version 4.0 http://dtsweb02.fcgov.com/operations/permit/index.cfm?FUSEACTION=ShowPayDetail4... 12/6/2007 /3070 el Vs Transportation Development Review Fee Date Received/ Paid/9- & - 07 ��� ��., Total Amount Paid .�/,?3 3 • c� Project Name: �� V►� l` APL�_ Project Location: 3Zo MAEL¢- e'I-f_c r Date: m- 6 07 Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure amount due ❑ Overall Development Plan (ODP) $500 each XFinal Development Plan (FDP) This fee includes 2 rounds of review $1000 each ❑ Additional round of review $ 500 each ❑ Annexation ❑ Minor Amendment ❑ Major Amendment ❑ Re -zone $20 x acres = + $250 = $250 each $2,500 each $200 each ❑ Modification to Land Use Code $200 each ❑ Wireless Telecommunication Equipment (WTE) S65 each ❑ Road Projects acres (of roadway) X $250 = ❑ Vacation of Easement(s) "' # of vacations _ X $400 = ❑ Vacation of Right(s)-of-Way '•' # of vacations _ X $800 = ❑ Dedication of Easement(s) and/or Right(s)-of-Way # of dedications _ X $250 = / 2L' _ '•' This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. ❑ Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit # of units X $160 = Multifamily or other residential units $115 per unit #ofunitsX$115= Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot sgftX$0.25= Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre acres X $ 250 = Project fee $2,000 each SUM Total of above amounts If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + y, (the amount over 30,000 The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = Reduction for affordable housing — a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP $1-7 -3-9 Land Use Information: Total number of single family detached units: Total number of multifamily/other residential units: Total number of certified affordable dwelling units (a copy of the letter/ authorization is required): Non residential building square footage: sq ft Gross Acreage: acres General Information: Owners Name(s): Street address: Y�p!2(_�&_pfjt . C j3o2a 7� City/State/Zip: Telephone: 30?, 7_47 Fax: 343 Z47 1407_ Applicants/ Consultants Firm Name: � l I L�i1�H rrtLc���rto Contact: Street address: 421 S GnKl �L City/State/Zip: rrf2-r Lt,.K 6 2 BO�_Z� Telephone: = u¢ 6710 Fax: q EZI r Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please print): L15-r1 11-4 Signature: Telephone: cc: Christie White, Engineering Development Review Engineering Additional Information (if Applicable): CERTIFICATION I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with the knowledge, consent, and authority of the owners of the real property, as those terms are defined in Section 1-2 of the City Code (including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the purpose of inspection, and if necessary, for posting of public notice on the property. 1 Name (Please PRINT): IUJi l ICJ 1rH2�� Address: 4-0 1 Telephone: ZZ Signature: (and title showing authority to sign, if applicable) Development Review Application For Office Use Only Date Submitted 2 1 General Information: List all property owners having a legal/equitable Current Planning File # - Planner 4u, interest in the property (attach separate sheets if necessary). Owner's Name(s): Project Name: SoLnrz Vi U.AGr- MiLPLr__ Project Location (Street Address): 3Z0 t-eLt- r Street Address: Z-7 qS r ZC0 Project Description: _ A City/State/Zip: 17 r r , C,s Q ( .n 7 1�i/E4,00V ViT.n Telephone: 303 Zj-7 K4 J) Fax: '203 2- % :]40�_ Applicant's/Consultant's Name: �i.ls i , rJ LA�SD Land Use Information: Gross Acreage/Square Footage: C?.45 orc 2R 1819 4? ITT Name of firm: __ALL AW-G-3 Existing Zoning: :D Proposed Use: M, �,i� / �5� Contact: _AJ6Yn,]+, L��t� ,�rt Street Address: ` 6 ( 1' AGor i Total Number of Dwelling Units: 2� Total Number of Affordable Dwelling Units: Q City/State/Zip: Fprz-r (�,"< Percentage of Affordable Dwelling Units (out of total): Telephone: !1ic') • Z&+ . S71 D Fax: 97,0 Z 4 . S71 S Total Commercial Floor Area: ti E-mail: ,115 rr rJ �?� �2T oFlca. iC( (�[ C77d�l.Cz�n Type of Request Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Additional handouts are available explaining the submittal requirements jar each of the following review processes. ❑ Annexation Petition with Initial Zoning REQUESTED ZONE: _ Fee $1,188.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Rezoning Petition REQUESTED ZONE: Fee $977.00 + $50.00 sign posting fee + $_75 for each APO label ❑ Overall Development Plan (ODP) Fee: $1,599.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Project Development Plan (PDP) without Subdivision Plat Fee: $3,887.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Project Development Plan (PDP) with Subdivision Plat Fee: $5,879.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Final Plan without Subdivision Plat �J Fee: $1,000.00 Final Plan with Subdivision Plat Fee: $1,000.00 ❑ Modification of Standards/Text and Map Amendment Fee: $200.00+ $50.00 sign posting fee ❑ Basic Development Review Fee: Varies: Check with the Zoning Department ❑ Major Amendment Fee: $3,206.00 + $50.00 sign posting fee + $35 for each APO label ❑ Non -Conforming Use Review Fee: $1,389.00 ❑ Vacation of ROW or Easement Fee: $5.00 per sheet of filing document ❑ Small Project Fees Fee: Varies -Check with the Current Planning Department ❑ Street Name Change Fee: $5.00 ❑ Extension of Final Approval Fee: $566.00 ❑ Site Plan Advisory Review NO FEE R1fVERSEMUSTBES1GNED, t17 -A UPDATED 912a2006 M