HomeMy WebLinkAboutSOLAR VILLAGE MAPLE - PDP - 23-07 - DECISION - MINUTES/NOTESADMINISTRATIVE HEARING
PROJECT 501ciL Villas IrrLLlQ R-
DATE NOy R, oW6
T
31�td rn wm
fl� 1� ',hill cc�lU fie.
Cu�-I 1
se
"(<-
S
3 104
6:1.s
0�c-
��,
7- �-O Lrl
/a s p►- 1,3 e, t
��r G,��-�-�v
3�s �✓ Si-�e-�t�cr�o
vsli
2�/-ss�i�
r7e�� 'c�c�•c��� .
e ,_
`i I1 NA/1.
1
CO �: 04;�
00 0 S
X01 t oo-
O
5 9 G 7 O �L
Bo52
q o 7
�a.
kkol
lk
all
r,,.,Li-
Solar Village Maple PDP
Administrative Hearing
Findings, Conclusions, and Decision
Nobember 8, 2007
Page 6 of 6
DECISION
The Solar Village Maple Project Development Plan #23-07, is hereby approved
by the Hearing Officer subject to the following condition:
The Applicant shall provide final building colors and materials that reduce the apparent
mass and scale of the development and ensure compatibility with the character of the
surrounding neighborhood. Final color and material selection is to be confirmed by
Planning staff prior to installation.
Dated this 16th day of November 2007, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
eron Gloss
ning and Zoni g Director
Solar Village Maple PDP
Administrative Hearing
Findings, Conclusions, and Decision
Nobember 8, 2007
Page 5 of 6
signed van -accessible space, according to the LUC and consistent with Federal
regulations.
The Hearing Officer acknowledges and appreciates that neighboring property
owners have provided careful thought in the framing of their concerns about
parking supply; however, the weight of evidence presented by the Applicant and
corroborated by the City staff, supports a finding of compliance with the
applicable standards.
The Hearing Officer also respectfully requests that the applicant carefully
evaluate the balance between the architectural program and parking allocation
when finalizing the Project design so that the Project can both be successful in
the marketplace and not create spillover parking impacts to the adjacent area.
SUMMARY OF CONCLUSIONS
A. The Solar Village Maple Project Development Plan is subject to administrative
review and the requirements of the Land Use Code (LUC).
B. The Solar Village Maple Project Development Plan complies with all applicable
district standards of Section 4.16 of the Land Use Code, (D) Downtown District,
Civic Center Sub -district.
C. The Solar Village Maple Project Development Plan complies with all applicable
General Development Standards contained in Article 3 of the Land Use Code
except where a modification to Section 3.5.2 (C)(1) has been granted.
D. With respect to the Modification to Section 3.5.2 (C)(1), the connecting walkway
standard:
1. Granting the requested modification would not be detrimental to the public
good and would not impair the intent and purposes of the Land Use Code.
2. The modification will advance or protect the public interests and purposes
of the standard for which the modification is requested equally well as a
plan which complies with the standard for which the modification is
requested. The proposed pedestrian walkway near the north building will
be served by a small number of the total site users. The development as a
whole provides strong pedestrian connectivity across and within the site,
and the design of the interior courtyard and parking area will promote
controlled speeds that will help to ensure pedestrian safety.
Solar Village Maple PDP
Administrative Hearing
Findings, Conclusions, and Decision
Nobember 8, 2007
Page 4 of 6
Illustrative building elevations submitted as part of this request to address
applicable Building and Design standards found in Section 4.16 (D) generally
show how the fagade and building scale is an appropriate match to that required
within the district. The Hearing Officer has added a condition of approval
requiring building colors and materials that are more compatible with existing
housing in the area, promote visual interest, and help to reduce the apparent
mass and bulk of the buildings.
Further, on -site parking has been appropriately sited behind the buildings and
internal to the site, with pedestrian -oriented building facades provided along the
street. A sidewalk system has been provided at the width necessary for safe
pedestrian movements.
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
The Staff Report summarizes the PDP's compliance with the applicable site
planning and design, access, circulation, parking, engineering, building design,
and transportation standards, including those standards specific to mixed -use
buildings. There was no evidence submitted at the hearing to contradict the
statements and conclusion of the Staff Report concerning compliance or to
otherwise refute compliance with the Article 3 Standards.
Testimony was offered at the hearing by neighboring landowners concerning the
anticipated or feared impacts of the proposed development and its design upon
the adjacent lot and to parking availability within the immediately surrounding
area. These impacts included those to nearby trees, and adequate provision of
both on- and off-street parking. Based on the staff and applicant response to
questions about tree impacts posed by the public, the Hearing Officer is
convinced that the applicant has taken tree impacts into account when siting and
orienting buildings on the development plan and no evidence was provided that
would indicate that potential tree impacts will arise as a result of the
development. Further, the issue of parking availability is a potentially valid one.
Since the Project is within the Transit -Oriented Development (TOD) Overlay
Zone, no parking minimums apply to the residential portion of the project. The
property was included within the Overlay Zone due to its proximity to the Mason
Corridor, Downtown Transit Center and the Downtown area as a whole. Like the
rest of the community, the commercial parking is limited to a maximum number
of spaces. There are 27 residential units proposed and 5,366 square feet of
commercial space. Thirty new diagonal, on -street parking spaces are provided
on Maple and Meldrum Streets. Ten off-street surface parking spaces are
provided, along with 9 garages and 4 carports for a total parking count of 53
spaces, two of which are handicap accessible spaces. There is at least one
Solar Village Maple PDP
Administrative Hearing
Findings, Conclusions, and Decision
Nobember 8, 2007
Page 3 of 6
Written Comments:
None
FACTS AND FINDINGS
1. Background
The surrounding zoning and land uses are as follows:
N: D—Downtown (Existing single-family and multi -family residential) with
NCB —Neighborhood Conservation, Buffer District (existing single-family
residential) beyond;
E: D—Downtown (Existing office, existing single-family residential and multi-
family residential under construction beyond);
S: D—Downtown (Existing City Hall offices and Washington Park with St.
Joseph Parish beyond ); and
W: NCB —Neighborhood Conservation, Buffer District (Existing single-family
residential) with NCM—Neighborhood Conservation, Medium Density District
(Existing single-family residential) and one C—Commercial property (Existing
auto body shop) beyond.
The subject property was zoned D—Downtown, Civic Center Subdistrict in 1997
with the adoption of City Plan and the Land Use Code. Prior to that time, this
area was zoned C—Commercial since at least 1976.
The subject property currently contains the Hefner Dean print shop, warehouses
and one residence with no historical significance. An optional neighborhood
meeting was held on July 19, 2007 and was attended by approximately 6
residents and property owners.
2. Compliance with Article 4 and the D— Downtown District, Civic Center Sub-
district Standards:
The Project Development Plan generally complies with all applicable
requirements of Article 4 and the Civic Center Sub -district standards of the D
zone district. The Staff Report summarizes the PDP's compliance with these
standards. In particular, the proposed mixed use dwelling units are permitted
within the zone district and there is no prescribed minimum or maximum density.
The Project is also in conformance with land use standards relating to building
height, calling for buildings to be six stories, and 85 feet, or less.
Solar Village Maple PDP
Administrative Hearing
Findings, Conclusions, and Decision
Nobember 8, 2007
Page 2 of 6
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 5:30 p.m. on November, 2007 in Conference Room A, 281 N.
College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of public testimony provided during the hearing. The LUC, the
City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City
are all considered part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Anne Aspen, City Planner
From the Applicant:
Justin Larson, JCL Architects
Alex Platt, Solar Village
Matt Evans
From the Public:
Ashley Hill, 312 N. Meldrum Street
Kristi Schwicksath, 2548 Romeldale Lane
Carl and Jill Glaser, 215 Jefferson Street
Derf Green, 318 N. Sherwood Street
Heather, 411 N. Meldrum Street
Sam Eliason, 529 Crestmore Place
Planning, evelopment and Transportatio. ervices
Planning and Zoning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE:
PROJECT NAME:
CASE NUMBER:
APPLICANT:
OWNERS:
HEARING OFFICER:
PROJECT DESCRIPTION:
November 8, 2007
Solar Village Maple Project
Development Plan
#23-07
Justin Larson
JCL Architecture
401 S. Mason Street
Fort Collins, CO 80524
Alex Platt, et al
Solar Village
2795 Pearl Street
Boulder, CO 80302
Cameron Gloss
Planning and Zoning Director
The Applicant has submitted a Project Development Plan (referred to herein as the
"Project" or the "PDP") replacing the existing buildings at 302 N. Meldrum Street and
320 Maple Street with a mixed -use project. The project includes a total of 5,366 square
feet of commercial uses and 27 dwelling units within two three-story buildings and one
two-story building.
SUMMARY OF HEARING OFFICER DECISION: Conditional Approval
ZONING DISTRICT: D— Downtown, Civic Center Sub -district
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020