HomeMy WebLinkAboutHARMONY TECH. PARK 3RD FILING, CUSTOM BLENDING - FDP - 01-08/A - SUBMITTAL DOCUMENTS - ROUND 1 - EASEMENTSlY A L
(MAVDevelopment
March 24, 2008
Mr. Ted Shepard
Ft. Collins Current Planning Department
PO Box 580
Ft. Collins, CO 80522
RE: Letter of Intent to provide easements for off -site work -
Custom Blending Site
Harmony Technology Park, Third Filing
VIA: Email only
Mr. Shepard,
Please allow this to serve as a Letter of Intent from MAVDevelopment Company to provide the
easements necessary to complete off -site improvements related to the Third Filing of Harmony
Technology Park, also known as Custom Blending. These easements include work on:
1. Storm drainage and grading in the new drainage tract
2. Any grading required around the perimeter of the site to match existing or proposed
grades
3. Public street and utility improvements to allow for connection to public utilities
4. Improvements required to allow emergency vehicle access to the site
Should you need additional information, please feel free to contact me at 734.604.8806 or email
at mmelchi@mavd.com.
Sincerely,
t 0
Mark S. Melchi, AIA
Vice President
Planning & Design
MAVDevelopment Company -Market Place Building•303 Detroit Street, Suite 301 -Ann Arbor, MI 48104.734.930.6700.734.930.6701 fox-w .movd.com