Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK 3RD FILING, CUSTOM BLENDING - FDP - 01-08/A - SUBMITTAL DOCUMENTS - ROUND 1 - EASEMENTSlY A L (MAVDevelopment March 24, 2008 Mr. Ted Shepard Ft. Collins Current Planning Department PO Box 580 Ft. Collins, CO 80522 RE: Letter of Intent to provide easements for off -site work - Custom Blending Site Harmony Technology Park, Third Filing VIA: Email only Mr. Shepard, Please allow this to serve as a Letter of Intent from MAVDevelopment Company to provide the easements necessary to complete off -site improvements related to the Third Filing of Harmony Technology Park, also known as Custom Blending. These easements include work on: 1. Storm drainage and grading in the new drainage tract 2. Any grading required around the perimeter of the site to match existing or proposed grades 3. Public street and utility improvements to allow for connection to public utilities 4. Improvements required to allow emergency vehicle access to the site Should you need additional information, please feel free to contact me at 734.604.8806 or email at mmelchi@mavd.com. Sincerely, t 0 Mark S. Melchi, AIA Vice President Planning & Design MAVDevelopment Company -Market Place Building•303 Detroit Street, Suite 301 -Ann Arbor, MI 48104.734.930.6700.734.930.6701 fox-w .movd.com