HomeMy WebLinkAboutHARMONY TECH. PARK 3RD FILING, CUSTOM BLENDING - PDP - 01-08 - DECISION - MINUTES/NOTESAdministrative Public Hearing Siqn-In
Project: Custom Blending Project Development Plan
Meeting Location: 281 N. College Ave., Conference Room A
Date: Tuesday, March 25, 2008, 5:00 p.m.
PLEASE PRINT CLEARLY
Name
Address
Phone
Email
O ,v C D N w
/
5(0 C� GRf E IV (SI �f Zn/
8a - 8�9C
U o w y u O ANC . CO
;7GW-Ci
I4ffl- Arh
5 22$ -I
d fir' @/ a l ill'-1 i - Coht
!
cc
i a -11114e. cow
i
00
�8.2-5 .2
; AO.CdW
-cam
lVl�1Pw
D3 Bs. 01 a(G Ga��«
zZ3 - 7s`7
GJ�Gr�d�s�' n.
Jews�i
Nq
Custom Blending @ Harmony , ech Park, PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 28, 2008
Page 5 of 5
B. The Custom Blending Project Development Plan complies with the Harmony
Corridor Plan and the Harmony Technology Park Overall Development Plan,
Third Amendment.
C. The Custom Blending Project Development Plan complies with all applicable
district standards of Section 4.26 of the Land Use Code, (HC) Harmony Corridor
zone district.
D. The Custom Blending Project Development Plan complies with all applicable
General Development Standards contained in Article 3 of the Land Use Code,
DECISION
The Custom Blending Project Development Plan, #1-08 is hereby approved by the
Hearing Officer without condition.
Dated this 29th day of March, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
Ca'meron Gloss
Current Planning Director
Custom Blending @ Harmony , ech Park PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 28, 2008
Page 4 of 5
Technology Park O.D.P. to amend the existing Plan by incorporating two former
residential out parcels, shifting primary and secondary uses among various
parcels and re -aligning Timberwood Drive. With the two new parcels, the size of
the O.D.P. increases by 3.7 acres for a new total of 274 acres.
The parcel is located within the Basic Industrial and Non -retail Employment
Activity Center as designated on the Harmony Technology Park, O.D.P., Third
Amendment.
2. Compliance with Article 4 and the HC — Harmony Corridor Zoning District
Standards:
The Project Development Plan complies with all applicable requirements of
Article 4 and the HC zone district.
The Staff Report summarizes the PDP's compliance with these standards and no
specific evidence was presented to contradict or otherwise refute the compliance
with Article 4 or the HC District Standards. In particular, light industrial is a
permitted primary within the HC zone district subject to an administrative review.
The proposed building location and orientation meet the applicable standards
and the building height complies with the standard and is found compatible with
the character of the surrounding area.
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
The Project Development Plan complies with all applicable requirements of
Article 3, including the plat standards of Section 3.3.1, and no evidence was
presented to contradict the statements and conclusion of the staff report
concerning compliance or to other refute the compliance with Article 3.
The plat provides for'direct vehicular access from a street and the new'lot lines
are substantially at a right angle or radial to the street. The plat indicates that
dedications for drainage and utility easements, and right-of-way for Precision
Drive, are provided as needed to serve the lots.
SUMMARY OF CONCLUSIONS
A. The Custom Blending Project Development Plan is subject to administrative
review and the'requirements of the Land Use..Code (LUC).
Custom Blending @ Harmony , ech Park PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 28, 2008
Page 3 of 5
Written Comments:
None.
FACTS AND FINDINGS
1. Site. Context/Background Information
The surrounding zoning and land uses are as follows:
N: H-C; Vacant — Harmony Technology Park Second Filing (Office Park)
S: L-M-N; Fossil Ridge High School
E: H-C; Vacant - Harmony Technology Park O.D.P.
W: H-C; Vacant — Harmony Technology Park O.D.P.
The following approvals have been granted:
• Harmony Farm Annexation - 1984
• Harmony Technology Park O.D.P. (155 acres) — August, 1997
• Celestica P.D.P., - November, 1997 (Intel)
• Kendall -Harmony Annexation — June, 2000
• Johnson -Harmony Annexation — July, 2000
• Harmony Tech. Park, First Amended O.D.P. (267 acres) — September,
2000
• Harmony Technology Park P.D.P. (61 acres) - May, 2001 , :
• Harmony Technology Park, O.D.P., Second Amendment — May, 2004
The Second Amendment added.three residential properties and increased the
total acreage of the O.D.P. from 267.19 acres to 270.19 acres. This amendment
also included consolidating Tracts G, H and I into a single Tract G, and slightly
increasing the amount of land area for secondary uses from 7.5 to 8.25 acres.
• Harmony Technology Park, O.D.P., Third Amendment— March, 2008
The Third Amendment was approved by the Planning and Zoning Board on
March 20, 2008. This is a request by two of the five owners of the Harmony
Custom Blending @ Harmony , ech Park PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 28, 2008
Page 2 of 5
ZONING DISTRICT: H — C Harmony Corridor
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no.controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 5:00 p.m. on March 28, 2008 in Conference Room B, 281 N.
College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of the public hearing. The LUC, the City's Comprehensive
Plan (City Plan), and the formally promulgated policies of the City are all considered
part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Ted Shepard, Chief Planner
From the Applicant:
,John Conway, Custom Blending
Dave Lingle, Aller-Lingle Architects
Ian ShufP, Aller-Lingle Architects
Angela Milewski, BHA Design
Tony Willkomm, Stantec
Doug Klapperich, Stantec
From the Public:
None.
rA
- anninz Development and insportation Services
Current Planning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
CASE NUMBER:
APPLICANT:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
March 25, 2008
Custom Blending at Harmony
Technology Park Project Development
Plan (PDP)
#1-08
Custom Blending
c/o BHA Design
1603 Oak Ridge Drive
Fort Collins, CO 80525
Custom Blending
307 Link Lane
Fort Collins, CO 80524
Cameron Gloss
Current Planning Director
The Applicant has submitted a request to develop approximately three acres of the
Harmony Technology Park for an office and light industrial operation. The proposed
building would contain about 35,000 square feet and be divided into office and light
industrial functions. The office component would be two -stories and the industrial
component would range in height from 28 to 38 feet. The facility may expand to 50,000
square feet in the future. The site is located south of Harmony Road and west of Lady
Moon Avenue, and part of Parcel E on the Amended Overall Development Plan.
SUMMARY OF HEARING OFFICER DECISION: Approval
281 North College Avenue 9 PO Box 580 0 Fort Collins, CO 80522-0580 9 (970) 2216750 9 FAX (970) 416-2020