Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK 3RD FILING, CUSTOM BLENDING - PDP - 01-08 - REPORTS - RECOMMENDATION/REPORT6. Findings of Fact/Conclusion: In evaluating Custom Blending, Staff makes the following findings of fact: A. The P.D.P. is in compliance with land use and development standards of the Harmony Corridor Plan. B. The P.D.P. is a permitted use and complies with the applicable land development standards of the Harmony Corridor zone district in accordance with Article Four. C. The P.D.P. complies with the Harmony Technology Park Overall Development Plan, Third Amendment. D. The Major Amendment complies with the applicable General Development Standards of Article Three. RECOMMENDATION: Staff recommends approval of Custom Blending P.D.P., #1-08. 3 H. Section 3.5. 1 (B) (C) (E) (F) — Building Project and Compatibility The building contains multiple functions within a contemporary design. The north and east elevations feature visitor and employee entrances highlighted by a prominent visitor entry feature. The west elevation includes the loading zone, trash enclosure and outside storage tanks. The south elevation is accented by windows with sunscreens. The office component is two stories and is embellished with two projecting building elements that include two-story height glass and decorative wall planes that are perpendicular to the north facade. This north elevation achieves a height of 28 feet and presents the public street with a modern image with a contemporary flair. While the north elevation includes a brick facade, the remaining three elevations feature textured tilt -up concrete panels. These panels include two distinct colors separating the base from the upper portions of the building. The middle of the building contains the high rack storage area achieving a height of 38 feet thus breaking up the strong horizontal lines. There are no adjacent buildings upon which to evaluate compatibility. With an attractive north elevation and a variety of forms, the building satisfies the standard that where the existing architectural character is not established, the architecture of new development shall set an enhanced standard of quality for future projects. Section 3.6.4 — Transportation Level of Service Requirements Precision Drive is classified as an industrial local street and will provide full -movement access to the site and connect to Technology Parkway (west) and Lady Moon Drive (east) both collector roadways. The Transportation Impact Study has been reviewed and evaluated by the Traffic Operations and Transportation Planning Departments. The project provides vehicular, pedestrian and bicycle facilities necessary to maintain the adopted transportation Level of Service standards as contained in Part II of the City of Fort Collins Multi -modal Transportation Level of Service Manual. The T.I.S. concludes that, with full development of Custom Blending, the future Level of Service at the key intersections will be acceptable. 5 B. Section 3.2.1(E)(1) — Buffering Between Incompatible Uses and Activities The site is bordered on the south by a stormwater detention pond that serves the overall development. This pond separates the subject parcel from Rock Creek Drive and the L-M-N zone district by approximately 200 feet. This distance is considered sufficient to separate light industrial activities from residential neighborhoods. C. Section 3.2.1(E)(4)(a) — Parking Lot Perimeter Landscaping All parking and loading in the first phase is located on the two sides of the building. The two side parking lots are buffered with shade trees in excess of the minimum requirement of one per 40 feet. Future parking is located at the rear of the lot and is separated from Rock Creek Drive by the aforementioned stormwater detention pond. There is no adjacent residential area. D. Section 3.2.1(E)(5) — Parking Lot Interior Landscaping The parking lot exceeds 6% interior landscaping in the form of islands which exceeds the required minimum for lots with less than 100 spaces. E. Section 3.2.2(B) — Access Circulation and Parking As mentioned, there is a walkway directly linking the front entry to the public sidewalk without crossing a parking lot drive aisle. Visitor (west) and employee (east) parking areas are similarly connected. F. Section 3.2.2(K)(2) — Parking Lots — Maximum Number of Spaces Parking has been calculated for a combination of office (7,947 square feet) and industrial (23,828 square feet) uses. Combined, these two uses cannot exceed 3.00 spaces per 1,000 square feet for office and .75 spaces per employee for industrial. The plan provides 23 spaces for the office component and 21 spaces for the anticipated 28 employees for a total of 44 spaces thus complying with the standard. G. Section 3.2.4 — Site Lighting Parking lot pole lighting and wall -mounted sconces will feature down - directional and full cut-off fixtures. There are no foot-candles that exceed the maximum allowable. 4 With the two new parcels, the size of the O.D.P. increases by 3.7 acres for a new total of 274 acres. 2. Harmony Corridor Plan: The parcel is located within the Basic Industrial and Non -retail Employment Activity Center. The proposed land use, light industrial, is a primary use as per the Harmony Corridor Plan. 3. Harmony Technology Park O.D.P. — Third Amendment: The parcel is located within Parcel E of the Harmony Technology Park Overall Development Plan. This parcel is designated as "Primary Uses." 4. Compliance with Applicable Harmonv Corridor Zone District Standards As mentioned, the land use is light industrial, and since the building is less than 80,000 square feet in size, it is permitted subject to Administrative Review. The building is below the maximum allowable height of six stories. The applicant is participating with the master developer of the overall development to establish and comply with an integrated pattern of streets, outdoor spaces (stormwater detention), building style and land use. Further, with the exception of the loading dock and storage tanks, the industrial activity is carried out entirely within a completely enclosed structure. Finally, the building provides a primary entrance that faces and opens directly onto the abutting street sidewalk without requiring pedestrians to cross any intervening driveways or parking lots. 5. Compliance with Applicable General Development Standards: A. Section 3.2.1(C)(D) — Landscaping and Tree Protection The P.D.P. provides full tree stocking around the entire site. Street trees are provided along Precision Drive. Foundation shrubs are provided around all buildings. 3 COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: H-C; Vacant — Harmony Technology Park Second Filing (Office Park) S: L-M-N; Fossil Ridge High School E: H-C; Vacant - Harmony Technology Park O.D.P. W: H-C; Vacant — Harmony Technology Park O.D.P. The following approvals have been granted: • Harmony Farm Annexation - 1984 • Harmony Technology Park O.D.P. (155 acres) — August, 1997 • Celestica P.D.P., - November, 1997 (Intel) • Kendall -Harmony Annexation — June, 2000 • Johnson -Harmony Annexation — July, 2000 • Harmony Tech. Park, First Amended O.D.P. (267 acres) — September, 2000 • Harmony Technology Park P.D.P. (61 acres) — May, 2001 • Harmony Technology Park, O.D.P., Second Amendment — May, 2004 The Second Amendment added three residential properties and increased the total acreage of the O.D.P. from 267.19 acres to 270.19 acres. This amendment also included consolidating Tracts G, H and I into a single Tract G, and slightly increasing the amount of land area for secondary uses from 7.5 to 8.25 acres. • Harmony Technology Park, O.D.P., Third Amendment — March, 2008 The Third Amendment was approved by the Planning and Zoning Board on March 20, 2008. This is a request by two of the five owners of the Harmony Technology Park O.D.P. to amend the existing Plan by incorporating two former residential out parcels, shifting primary and secondary uses among various parcels and re -aligning Timberwood Drive. 2 ITEM NO. '�` MEETING DATE S/ssf a8 STAFF7&C-60 4SAgr & p Citv of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: Custom Blending at Harmony Technology Park, PDP, #1-08 APPLICANT: Custom Blending c/o BHA Design 1603 Oak Ridge Drive Fort Collins, CO 80525 OWNER: Custom Blending 307 Linkh rle Fort Collins, CO 80524 PROJECT DESCRIPTION: This is a request to develop approximately three acres of the Harmony Technology Park for an office and light industrial operation. The proposed building would contain about 35,000 square feet and be divided into office and light industrial functions. The office component would be two -stories and the industrial component would range in height from 28 to 38 feet. The facility may expand to 50,000 square feet in the future. The site is located south of Harmony Road and west of Lady Moon Avenue, and part of Parcel E on the Amended Overall Development Plan. The zoning is H-C, Harmony Corridor. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The P.D.P. complies with the Harmony Corridor Plan and the Harmony Technology Park Overall Development Plan, Third Amendment. The P.D.P. also complies with the land development standards of the Harmony Corridor zone district and the applicable General Development Standards. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO80522-0580 (970) 221-6750 PLANNING DEPARTMENT