Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK 3RD FILING, CUSTOM BLENDING - PDP - 01-08 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYMultimodal Transportation Level of .Service Manual p. 20 LOS Standards for Development Review - Bicycle Figure 7. Bicycle LOS Worksheet level of service - connectivity miionann actual proposed Vase connectivity: A 6 specific connections to priority sites: description of applicable destination area within 1,320' Including address F [21 L1 destination area classification (see text) /'�' City of Port Collins Transportation Master Plan ' ' " Multimodal Transportation Level of Service Manual LOS Standards for Development Review • Pedesirinn Figure 6. Pedestrian LOS Worksheet project location classification: 0T'14c2 (enter as many as apply) 0 W ID I3 C description of applicable destination area within 1,3201 Including address �st?vAtoey U� t,c �c � Ali&rGt�6oEr{ae� destination area destination area level of service (ininintum based on project locatloo classification) classification (see text.) dlrn'InIM �m1lLlnay 141et natlng/— 111ua1 InNtt+111 Ilnullr InI/b111aH Illinllnlel, e (.. C ` NIANlQ N/A .(l/A #1UA proposed A 0 proposed mhdlman actuni proposed miolomm proposed ,r;k19 r City of Fort Collins Transportation Master Plan ti tip�TyF 2,Q Horsetooth `m rn a� N Harmony -e o TT- 0 U � m U J Rock Creek .) 25 Kechter a� c_ z d n F= SCALE: 1 "=2000' PEDESTRIAN INFLUENCE AREA 3Z APPENDIX F 3l 7: Rock Creek & Technology HCM Unsignalized Intersection Capacity Analysis = Short Total PM 1/28/2008 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Ito Y Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 91 76 0 0 4 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 1 107 89 0 0 5 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 89 199 89 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 89 199 89 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1506 789 969 Direction, Lane # EB 1 WB 1 SB 1 Volume Total 108 89 5 Volume Left 1 0 0 Volume Right 0 0 5 cSH 1506 1700 969 Volume to Capacity 0.00 0.05 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.1 0.0 8.7 Lane LOS A A Approach Delay (s) 0.1 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 15.6% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 2 -3O 7: Rock Creek & Technology HCM Unsignalized Intersection Capacity Analysis Short Total AM 1/28/2008 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 T4 Y Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 5 101 105 0 0 1 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 6 119 124 0 0 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 124 254 124 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 124 254 124 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1463 732 927 Direction, Lane # EB 1 WB 1 SB 1 Volume Total 125 124 1 Volume Left 6 0 0 Volume Right 0 0 1 cSH 1463 1700 927 Volume to Capacity 0.00 0.07 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.4 0.0 8.9 Lane LOS A A Approach Delay (s) 0.4 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 19.4% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 2 7,1 3: Precision & Lady Moon HCM Unsignalized Intersection Capacity Analysis Short Total PM 1/28/2008 t l 4\ t 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y Vi t T* Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 12 2 1 54 137 8 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 14 2 1 64 161 9 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh) 1 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 232 166 171 vC1, stage 1 conf vol 166 vC2, stage 2 conf vol 66 vCu, unblocked vol 232 166 171 IC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 98 100 100 GM capacity (veh/h) 754 878 1407 Direction, Lane # EB 1 NB 1 NB 2 SB 1 Volume Total 16 1 64 171 Volume Left 14 1 0 0 Volume Right 2 0 0 9 cSH 769 1407 1700 1700 Volume to Capacity 0.02 0.00 0.04 0.10 Queue Length 95th (ft) 2 0 0 0 Control Delay (s) 9.8 7.6 0.0 0.0 Lane LOS A A Approach Delay (s) 9.8 0.1 0.0 Approach LOS A Intersection Summary Average Delay 0.7. Intersection Capacity Utilization 17.7% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 3: Precision & Lady Moon HCM Unsignalized Intersection Capacity Analysis Short Total AM 1/28/2008 } --v -N t Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y Vi t 14 Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 3 0 2 141 97 13 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 4 0 2 166 114 15 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh) 1 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 292 122 129 vC1, stage 1 conf vol 122 vC2, stage 2 conf vol 171 vCu, unblocked vol 292 122 129 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 719 929 1456 Direction, Lane # EB 1 NB 1 NB 2 SB 1 Volume Total 4 2 168 129 Volume Left 4 2 0 0 Volume Right 0 0 0 15 cSH 719 1456 1700 1700 Volume to Capacity 0.00 0.00 0.10 0.08 Queue Length 95th (ft) 0 0 0 0 Control Delay (s) 10.0 7.5 0.0 0.0 Lane LOS B A Approach Delay (s) 10.0 0.1 0.0 Approach LOS B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 17.4% ICU Level of.Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 2 % 10: Rock Creek & Lady Moon HCM Unsignalized Intersection Capacity Analysis Short Total PM 1/28/2008 * Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations m T� Sign Control Stop Stop Stop Stop Volume (vph) 9 52 30 1 35 23 8 23 3 45 61 33 Peak Hour Factor 0.85 0.85 0.85 0.88 0.88 0.88 0.86 0.86 0.86 0.85 0.85 0.85 Hourly flow rate (vph) 11 61 35 1 40 26 9 27 3 53 72 39 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 SB 2 Volume Total (vph) 72 35 67 40 53 111 Volume Left (vph) 11 0 1 9 53 0 Volume Right (vph) 0 35 26 3 0 39 Hadj (s) 0.11 -0.67 -0.20 0.03 0.53 -0.21 Departure Headway (s) 5.2 4.4 4.9 5.2 5.5 4.8 . Degree Utilization, x 0.10 0.04 0.09 0.06 0.08 0.15 Capacity (veh/h) 658 774 690 665 626 726 Control Delay (s) 7.6 6.4 8.4 8.5 7.8 7.4 Approach Delay (s) 7.2 8.4 8.5 7.5 Approach LOS A A A A Intersection Summa Delay. 7.7 HCM Level of Service A Intersection Capacity Utilization 23.2% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 3 Z6 10: Rock Creek & Lady Moon HCM Unsignalized Intersection Capacity Analysis 1/28/2008 Short Total AM * Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 ;1 *'It-- 4* R Sign Control Stop Stop Stop Stop Volume (vph) 38 38 25 3 73 42 16 63 1 10 71 16 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 45 45 29 4 86 49 19 74 1 12 84 19 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 SB 2 Volume Total (vph) 89 29 139 94 12 102 Volume Left (vph) 45 0 4 19 12 0 Volume Right (vph) 0 29 49 1 0 19 Hadj (s) 0.28 -0.67 -0.17 0.07 0.53 -0.09 Departure Headway (s) 5.5 4.5 5.0 5.4 5.8 5.2 Degree Utilization, x 0.14 0.04 0.19 0.14 0.02 0.15 Capacity (veh/h) 620 748 677 632 584 657 Control Delay (s) 8.2 6.5 9.3 9.3 7.7 7.9 Approach Delay (s) 7.7 9.3 9.3 7.9 Approach LOS A A A A Intersection Summary Delay 8.5 HCM Level of Service A Intersection Capacity Utilization 28.4% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 3 Z5 9: Harmony & Lady Moon HCM Signalized Intersection Capacity Analysis Short Total PM 1/28/2008 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations R tt r Vi tt r Vi t r R t F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 6.0 &0 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fit 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583 Fit Permitted 0.06 1.00 1.00 0.06 1.00 1.00 0.73 1.00 1.00 0.70 1.00 1.00 Satd. Flow (perm) 111 3539 1583 107 3539 1583 1356 1863 1583 1304 1863 1583 Volume (vph) 8 1898 46 58 2036 8 28 1 37 204 38 140 Peak -hour factor, PHF 0.92 0.92 0.92 0.94 0.94 0.94 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph) 9 2063 50 62 2166 9 33 1 44 240 45 165 RTOR Reduction (vph) 0 0 17 0 0 3 0 0 37 0 0 93 Lane Group Flow (vph) 9 2063 33 62 2166 6 33 1 7 240 45 72 Turn Type pm+pt Perm pm+pt Perm pm+pt Perm pm+pt Perm Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 2 6 6 8 8 4 4 Actuated Green, G (s) 65.0 64.2 64.2 69.8 66.6 66.6 20.0 17.6 17.6 23.2 19.2 19.2 Effective Green, g (s) 68.0 65.2 65.2 72.8 67.6 67.6 22.0 17.6 17.6 25.2 19.2 19.2 Actuated g/C Ratio 0.62 0.59 0.59 0.66 0.61 0.61 0.20 0.16 0.16 0.23 0.17 0.17 Clearance Time (s) 4.0 7.0 7.0 4.0 7.0 7.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 81 2098 938 119 2175 973 280 298 253 316 325 276 v/s Ratio Prot 0.00 0.58 c0.02 c0.61 0.00 0.00 c0.03 0.02 v/s Ratio Perm 0.07 0.02 0.33 0.00 0.02 0.00 c0.15 0.05 v/c Ratio 0.11 0.98 0.04 0.52 1.00 0.01 0.12 0.00 0.03 0.76 0.14 0.26 Uniform Delay, d1 27.2 21.9 9.3 26.3 21.1 8.2 35.9 38.8 39.0 39.6 38.4 39.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.6 16.1 0.1 4.1 18.3 0.0 0.2 0.0 0.2 10.0 0.9 2.3 Delay (s) 27.8 38.0 9.4 30.3 39.4 8.2 36.1 38.8 39.2 49.7 39.3 41.5 Level of Service C D A C D A D D D D D D Approach Delay (s) 37.2 39.0 37.9 45.7 Approach LOS D D D D Intersection Summary HCM Average Control Delay 38.8 HCM Level of Service D HCM Volume to Capacity ratio 0.94 Actuated Cycle Length (s) 110.0 :Sum of lost time (s) 16.0 Intersection Capacity Utilization 84.2% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 Z4 9: Harmony & Lady Moon • Short Total AM HCM Signalized Intersection Capacity Analysis 1/28/2008 * Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi tt r Vi tt F t F R Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00, 0.85 1.00. 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.05 1.00 1.00 0.13 1.00 1.00 0.68 1.00 1.00 0.71 1.00 1.00 Satd Flow (perm) 93 3539 1583 235 3539 1583 1268 1863 1583 1328 1863 1583 Volume (vph) 200 1293 74 33 1790 255 46 58 43 6 3 5 Peak -hour factor, PHF 0.86 0.86 0.86 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph) 233 1503 86 39 2106 300 54 68 51 7 4 6 RTOR Reduction (vph) 0 0 31 0 0 87 0 0 42 0 0 5 Lane Group Flow (vph) 233 1503 55 39 2106 213 54 68 9 7 4 1 Turn Type pm+pt Perm pm+pt Perm pm+pt Perm pm+pt Perm Protected Phases 5 2 1 6 3 8 7 4 4 Permitted Phases Actuated Green, G (s) 2 89.8 82.6 2 82.6 6 76.0 72.8 6 72.8 8 25.6 22.4 8 22.4 4 20.8 20.0 20.0 Effective Green, g (s) 92.8 83.6 83.6 79.0 73.8 73.8 27.6 22.4 22.4 22.8 20.0 20.0 Actuated g/C Ratio 0.71 0.64 0.64 0.61 0.57 0.57 0.21 0.17 0.17 0.18 0.15 0.15 Clearance Time Is) 4.0 7.0 7.0 4.0 7.0 7.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 234 2276 1018 181 2009 899 282 321 273 236 287 244 v/s Ratio Prot c0.10 0.42 0.01 0.60 c0.00 c0.04 0.00 0.00 v/s Ratio Perm c0.61 0.03 0.13 0.13 0.04 0.01 0.01 0.00 v/c Ratio 1.00 0.66 0.05 0.22 1.05 0.24 0.19 0.21 0.03 0.03 0.01 0.00 Uniform Delay, d1 47.5 14.4 8.6 12.1 28.1 14.0 41.6 46.2 44.8 44.4 46.6 46.6 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 57.3 1.5 0.1 0.6 34.1 0.6 0.3 1.5 01 0.1 0.1 0.0 Delay (s) 104.8 15.9 8.7 12.7 62.2 14.7 42.0 47.7 45.0 44.4 46.7 46.6 Level of Service F B A B E B D D D D D D Approach Delay Is) 26.9 55.6 45.1 45.7 Approach LOS C E D D Intersection Summary HCM Average Control Delay 43.4 HCM Level of Service D HCM Volume to Capacity ratio 0.82 Actuated Cycle Length Is) 130.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 83.1% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 ZS APPENDIX E 10: Rock Creek & Lady Moon HCM Unsignalized Intersection Capacity Analysis 1/28/2008 Short Bkgrd PM * o. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 ;V A 4� 11 T* Sign Control Stop Stop Stop Stop 33 Volume (vph) 9 52 30 1 35 23 8 22 3 45 59 Peak Hour Factor 0.85. 0.85 0.85 0.88 0.88 0.88 0.86 0.86 0.86 0.85 0.85 0.85 Hourly flow rate (vph) 11 61 35 1 40 26 9 26 3 53 69 39 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 SB 2 Volume Total (vph) 72 35 67 38 53 108 Volume Left (vph) 11 0 1 9 53 0 Volume Right (vph) 0 35 26 3 0 39 Hadj (s) 0.11 -0.67 -0.20 0.03 0.53 -0.22 Departure Headway (s) 5.2 4.4 4.9 5.2 5.5 4.8 Degree Utilization, x 0.10 0.04 0.09 0.05 0.08 0.14 Capacity (veh/h) 660 776 691 666 626 727 Control Delay (s) 7.6 6.4 8.4 8.5 7.8 7.3 Approach Delay (s) 7.2 8.4 8.5 7.5 Approach LOS A A A A Intersection Summary Delay 7.7 HCM Level of Service A Intersection Capacity Utilization 23.1% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 0,( 10: Rock Creek & Lady Moon HCM Unsignalized Intersection Capacity Analysis Short Bkgrd AM 1/28/2008 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4, Sign Control Stop Stop Stop Stop Volume (vph) 38 38 25 3 73 42 16 61 1 10 71 16 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 45 45 29 4 86 49 19 72 1 12 84 19 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 SB 2 Volume Total (vph) 89 29 139 92 12 102 Volume Left (vph) 45 0 4 19 12 0 Volume Right (vph) 0 29 49 1 0 19 Hadj (s) 0.28 -0.67 -0.17 0.07 0.53 -0.09 Departure Headway (s) 5.5 4.5 5.0 5.4 5.8 5.2 Degree Utilization, x 0.14 0.04 0.19 0.14 0.02 0.15 Capacity (veh/h) 621 750 678 632 585 657 Control Delay (s) 8.1 6.5 9.2 9.3 7.7 7.9 Approach Delay (s) 7.7 9.2 9.3 7.9 Approach LOS A A A A Intersection Summa Delay 8.5 HCM Level of Service A Intersection Capacity Utilization 28.3% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 Z U . 9: Harmony & Lady Moon HCM Signalized Intersection Capacity Analysis Short Bkgrd PM 1/28/2008 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r tt F R t r Vi t r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 &0 &0 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 . 6.0 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583 Fit Permitted 0.06 1.00 1.00 0.06 1.00 1.00 0.73 1.00 1.00 0.70 1.00 1.00 Said Flow (perm) 111 3539 1583 107 3539 1583 1356 1863 1583 1304 1863 1583 Volume (vph) 8 1898 44 57 2036 8 20 1 33 204 38 140 Peak -hour factor, PHF 0.92 0.92 0.92 0.94 0.94 0.94 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph) 9 2063 48 61 2166 9 24 1 39 240 45 165 RTOR Reduction (vph) 0 0 16 0 0 3 0 0 33 0 0 96 Lane Group Flow (vph) 9 2063 32 61 2166 6 24 1 6 240 45 69 Turn Type pm+pt Perm pm+pt Perm pm+pt Perm pm+pt Perm Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 2 6 6 8 8 4 4 Actuated Green, G (s) 65.0 64.2 64.2 69.8 66.6 66.6 20.0 17.6 17.6 23.2 19.2 19.2 Effective Green, g (s) 68.0 65.2 65.2 72.8 67.6 67.6 22.0 17.6 17.6 25.2 19.2 19.2 Actuated g/C Ratio 0.62 0.59 0.59 0.66 0.61 0.61 0.20 0.16 0.16 0.23 0.17 0.17 Clearance Time (s) 4.0 7.0 7.0 4.0 7.0 7.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 81 2098 938 119 2175 973 280 298 253 316 325 276 v/s Ratio Prot 0.00 0.58 c0.01 c0.61 0.00 0.00 c0.03 0.02 v/s Ratio Perm 0.07 0.02 0.32 0.00 0.02 0.00 c0.15 0.04 v/c Ratio 0.11 0.98 0.03 0.51 1.00 0.01 0.09 0.00 0.02 0.76 0.14 0.25 Uniform Delay, d1 27.2 21.9 9.3 26.3 21.1 8.2 35.7 38.8 39.0 39.6 38.4 39.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.6 16.1 0.1 3.7 18.3 0.0 0.1 0.0 0.2 10.0 0.9 2.2 Delay (s) 27.8 38.0 9.4 29.9 39.4 8.2 35.8 38.8 39.1 49.7 39.3 41.4 Level of Service C D A C D A D D D D D D Approach Delay (s) 37.3 39.0 37.9 45.6 Approach LOS D D D D Intersection Summary HCM Average Control Delay 38.9 HCM Level of Service D HCM Volume to Capacity ratio 0.94 Actuated Cycle Length (s) 110.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 84.2% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 I� 9: Harmony & Lady Moon HCM Signalized Intersection Capacity Analysis Short Bkgrd AM 1/28/2008 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations R ++ r Apt F R t F R T F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583 Fit Permitted 0.05 1.00 1.00 0.13 1.00 1.00 0.68 1.00 1.00 0.71 1.00 1.00 Satd Flow (perm) 93 3539 1583 241 3539 1583 1268 1863 1583 1328 1863 1583 Volume (vph) 200 1293 65 29 1790 255 44 58 42 6 3 5 Peak -hour factor, PHF 0.86 0.86 0.86 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph) 233 1503 76 34 2106 300 52 68 49 7 4 6 RTOR Reduction (vph) 0 0 27 0 0 87 0 0 41 0 0 5 Lane Group Flow (vph) 233 1503 49 34 2106 213 52 68 8 7 4 1 Turn Type pm+pt Perm pm+pt Perm pm+pt Perm pm+pt Perm Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 2 6 6 8 8 4 4 Actuated Green, G (s) 89.8 83.4 83.4 75.2 72.8 72.8 25.6 22.4 22.4 20.8 20.0 20.0 Effective Green, g (s) 92.8 84.4 84.4 78.2 73.8 73.8 27.6 22.4 22.4 22.8 20.0 20.0 Actuated g/C Ratio 0.71 0.65 0.65 0.60 0.57 0.57 0.21 0.17 0.17 0.18 0.15 0.15 Clearance Time (s) 4.0 7.0 7.0 4.0 7.0 7.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 234 2298 1028 173 2009 899 282 321 273 236 287 244 v/s Ratio Prot c0.10 0.42 0.00 0.60 c0.00 c0.04 0.00 0.00 v/s Ratio Perm c0.61 0.03 0.11 0.13 0.03 0.01 0.01 0.00 v/c Ratio 1.00 0.65 0.05 0.20 1.05 0.24 0.18 0.21 0.03 0.03 0.01 0.00 Uniform Delay, d1 47.5 13.9 8.3 12.1 28.1 14.0 41.6 46.2 44.8 44.4 46.6 46.6 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 57.3 1.5 0.1 0.6 34.1 0.6 0.3 1.5 0.2 0.1 0.1 0.0 Delay (s) 104.8 15.4 8.3 12.7 62.2 14.7 41.9 47.7 45.0 44.4 46.7 46.6 Level of Service F B A B E B D D D D D D Approach Delay (s) 26.6 55.7 45.1 45.7 Approach LOS C E D D Intersection Summary HCM Average Control Delay 43.4 HCM Level of Service D HCM Volume to Capacity ratio 0.82 Actuated Cycle Length (s) 130.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 83.0% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 w APPENDIX D 17 Table 43 Fort Collins (City Limits) Motor Vehicle LOS Standards (Intersections) Land Use (from structure plan) Other corridors within: Mixed use Low density mixed use All other Intersection type YP Commercial corridors districts residential areas Signalized intersections D E' D D (overall) Any Leg E E D. E Any Movement E E D E Stop sign control N/A P* F" E (arterial1collector or local — any approach leg Stop sign control _7 N/A C C C (collector/local—any approach leg) mitigating measures required " considered normal in an urban environment 1(P I UNSIGNALIZED INTERSECTIONS SIGNALIZED INTERSECTIONS 15 10: Rock Creek & Lady Moon HCM Unsignalized Intersection Capacity Analysis Recent PM 1/2s/2ooa Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 r 44 44 1 11� Sign Control Stop Stop Stop Stop Volume (vph) 8 46 27 0 31 20 7 19 3 42 54 30 Peak Hour Factor 0.85 0.85 0.85 0.88 0.88 0.88 0.86 0.86 0.86 0.85 0.85 0.85 Hourly flow rate (vph) 9 54 32 0 35 23 8 22 3 49 64 35 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 SB 2 Volume Total (vph) 64 32 58 34 49 99 Volume Left (vph) 9 0 0 8 49 0 Volume Right (vph) 0 32 23 3 0 35 Hadj (s) 0.11 -0.67 -0.20 0.02 0.53 -0.22 Departure Headway (s) 5.1 4.3 4.9 5.1 5.4 4.7 Degree Utilization, x 0.09 0.04 0.08 0.05 0.07 0.13 Capacity (veh/h) 678 789 703 679 635 739 Control Delay (s) 7.4 6.3 8.3 8.3 7.7 7.2 Approach Delay (s) 7.1 8.3 8.3 7.4 Approach LOS A A A A Intersection Summa Delay 7.5 HCM Level of Service A Intersection Capacity Utilization 23.4% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 1 4- 10: Rock Creek & Lady Moon HCM Unsignalized Intersection Capacity Analysis Recent AM 1/28/2008 'A --► 'i 'e- .- ti -N t I' 1 d Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Lane Configurations O' r 44 41, Sign Control Stop Stop Stop Volume (vph) 35 34 22 3 65 39 14 57 1 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 41 40 26 4 76 46 16 67 1 SBL SBT SBR Stop 9 64 14 0.85 0.85 0.85 11 75 16 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 SIB 2 Volume Total (vph) 81 26 126 85 11 92 Volume Left (vph) 41 0 4 16 11 0 Volume Right (vph) 0 26 46 1 0 16 Hadj (s) 0.29 -0.67 -0.18 0.06 0.53 -0.09 Departure Headway (s) 5.4 4.5 5.0 5.3 5.7 5.1 Degree Utilization, x 0.12 0.03 0.17 0.12 0.02 0.13 Capacity (veh/h) 630 765 690 645 595 670 Control Delay (s) 8.0 6.4 9.0 9.1 7.6 7.7 Approach Delay (s) 7.6 9.0 9.1 7.7 . Approach LOS A A A A Intersection Summary Delay 8.3 HCM Level of Service A Intersection Capacity Utilization 27.6% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E. Synchro 6 Light Report Page 1 )3 9: Harmony & Lady Moon HCM Signalized Intersection Capacity Analysis Recent PM 1/28/2008 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi tt r tt r t r Vi t F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583 Fit Permitted 0.07 1.00 1.00 0.07 1.00 1.00 0.73 1.00 1.00 0.68 1.00 1.00 Satd. Flow (perm) 132 3539 1583 127 3539 1583 1356 1863 1583 1262 1863 1583 Volume (vph) 8 1824 39 51 1748 8 18 1 29 204 38 140 Peak -hour factor, PHF 0.92 0.92 0.92 0.94 0.94 0.94 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph) 9 1983 42 54 1860 9 21 1 34 240 45 165 RTOR Reduction (vph) 0 0 16 0 0 3 0 0 28 0 0 110 Lane Group Flow (vph) 9 1983 26 54 1860 6 21 1 6 240 45 55 Turn Type pm+pt Peru pm+pt Perm pm+pt Perm pm+pt Peru Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 2 6 6 8 8 4 4 Actuated Green, G (s) 54.2 53.4 53.4 59.0 55.8 55.8 20.0 18.4 18.4 24.8 20.8 20.8 Effective Green, g (s) 57.2 54.4 54.4 62.0 56.8 56.8 22.0 18.4 18.4 26.8 20.8 20.8 Actuated g/C Ratio 0.57 0.54 0.54 0.62 0.57 0.57 0.22 0.18 0.18 0.27 0.21 0.21 Clearance Time (s) 4.0 7.0 7.0 4.0 7.0 7.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 89 1925 861 131 2010 899 305 343 291 359 388 329 v/s Ratio Prot 0.00 c0.56 c0.01 0.53 0.00 0.00 c0.03 0.02 v/s Ratio Perm 0.06 0.02 0.24 0.00 0.01 0.00 c0.15 0.03 v/c Ratio 0.10 1.03 0.03 0.41 0.93 0.01 0.07 0.00 0.02 0.67 0.12 0.17 Uniform Delay, d1 18.6 22.8 10.6 23.8 19.7 9.4 30.8 33.3 33.4 33.0 32.1 32.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1:00 Incremental Delay, d2 0.5 28.7 0.1 2.1 8.8 0.0 0.1 0.0 0.1 4.7 0.6 1.1 Delay (s) 19.1 51.5 10.6 25.9 28.5 9.4 30.9 33.3 33.6 37.6 32.7 33.6 Level of Service B D B C C A C C C D C C Approach Delay (s) 50.5 28.3 32.6 35.7 Approach LOS D C C D Intersection Summary _ HCM Average Control Delay 39.2 HCM Level of Service D HCM Volume to Capacity ratio 0.97 Actuated Cycle Length (s) 100.0 Sum of lost time (s) 22.0 Intersection Capacity Utilization 78.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 9: Harmony & Lady Moon HCM Signalized Intersection Capacity Analysis 1/28/2008 Recent AM Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r °S tt F t F I t F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time is) 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583 Fit Permitted 0.08 1.00 1.00 0.16 1.00 1.00 0.71 1.00 1.00 0.71 1.00 1.00 Satd Flow (perm) 141 3539 1583 300 3539 1583 1314 1863 1583 1328 1863 1583 Volume (vph) 200 1087 58 26 1420 255 39 58 37 6 3 5 Peak -hour factor, PHF 0.86 0.86 0.86 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph) 233 1264 67 31 1671 300 46 68 44 7 4 6 RTOR Reduction (vph) 0 0 31 0 0 144 0 0 34 0 .0 5 Lane Group Flow (vph) 233 1264 36 31 1671 156 46 68 10 7 4 1 Turn Type pm+pt Perm pm+pt Perm pm+pt Perm pm+pt Perm Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 2 6 6 8 8 4 4 Actuated Green, G (s) 59.8 53.4 53.4 48.2 45.8 45.8 24.8 22.4 22.4 21.6 20.8 20.8 Effective Green, g is) 62.8 54.4 54.4 51.2 46.8 46.8 26.8 22.4 22.4 23.6 20.8 20.8 Actuated g/C Ratio 0.63 0.54 0.54 0.51 0.47 0.47 0.27 0.22 0.22 0.24 0.21 0.21 Clearance Time (s) 4.0 7.0 7.0 4.0 7.0 7.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 251 1925 861 189 1656 741 363 417 355 317 388 329 v/s Ratio Prot c0.09 0.36 0.00 0.47 c0.00 c0.04 0.00 0.00 v/s Ratio Perm c0.49 0.02 0.08 0.10 0.03 0.01 0.01 0.00 v/c Ratio 0.93 0.66 0.04 0.16 1.01 0.21 0.13 0.16 0.03 0.02 0.01 0.00 Uniform Delay, d1 30.5 16.2 10.6 13.1 26.6 15.7 27.5 31.3 30.3 29.3 31.4 31.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 37.5 1.8 0.1 0.4 24.3 0.6 0.2 0.8 0.1 0.0 0.0 0.0 Delay (s). 68.0 17.9 10.7 13.5 50.9 16.4 27.7 32.1 30.4 29.3 31.5 31.4 Level of Service E B B B D B C C C C C C Approach Delay Is) 25.1 45.2 30.3 30.6 Approach LOS C D C C Intersection Summary HCM Average Control Delay 36.1 HCM Level of Service D HCM Volume to Capacity ratio 0.69 Actuated Cycle Length Is) 100.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 72.5% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 11 APPENDIX C TA, m DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: 970 669.2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 12.6.06 Observer: Linda Day: Tuesday Jurisdiction: Fort.Collins R = right turn Intersection: Rock CreekiLady Moon S = straight L = left tum Time Begins 7:15 7:30 7:45 8:00 8:15 8:30 Northbound: Lady Moon So bound: Lady Moon Total northlsouth 29 59 32 39 17 15 Eastbound: Rock Creek Westbound: Rods Creek Total east/west Total All . L 2 4 5 3 2 3 S 7 17 13 20 8 5 R 0 0 1 01 0 0 Total 9 21 19 23 10 8 I. 2 1 1 5 1 1 3 S 13 32 9 10 6 1 3 R 5 5 3 1 0 1 Total 10 38 13 16 7 7 I. 4 22 7 2 1 3 S 3 6 11 1 14 132 1 4 R 3 12 4 3 1 Total 10 40 22 19 16 8 L 0 3 0 0 0 0 S 20 23 14 8 14 11 R 8 11 11 9 3 4 Total 28 37 25 17 17 15 38 67 77 136 47 79 36 33 23 75 50 38 7:15-8:15 14 S7 1 PHF 1. 72 1 0.78 9 1 64-= 87 1 0.57 135 134122 1 91 0.57 1 3 165 139 107 0.72 198 357 4:15 7 9 1 1 17 5 5 2 1 12 29 0 12 2 14 0 8 3 11 25 54 U0 5 6 1 12 4 4 2 10 22 0 9 1 10 .1 8 3 12 22 44 4:45 2 2 0 4 6 13 4 23 27 2 10 7 19 0 7 6 13 32 59 5:00 1 4 2 7 16 11 7 34 41 2 10 5 17 0 6 5 11 28 69 5:15 2 5 0 7 11 11 7 29 36 2 13 10 25 0 8 2 10 35 71 5:30 2 3 1 6 1 9 6 16 22 0 13 5 18 0 1 10 1 2 12 30 52 4:45.5:45 1 7 114 1 3 24 34 144 24 102 126 6 46 27 79 0 131 115 46 125 251 PHF 0.86 1 0.75 0.79 0.88 MATTHEW J. DELICH, P.E. 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: 970 669.2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 3.22.07 Observer: City of Fort Collins Day: Thursday Jurisdiction: Fort Collins R = right trim Intersection: Harmony/Lady Moon S = straight L = left tum Time Begins Northbound: Lady Moon Southbound: Lady Moon Total north/south Eastbound: Harmony Westbound: Harmony Total easttwest Total All L S R Total L S R Total L S R Total L S R Total 7:30 6 17 15 38 1 0 1 2 40 46 331 2 379 7 292 72 371 750 790 7.45 9 12 10 31 0 1 1 2 33 54 257 1 312 6 424 80 510 822 855 8:00 6 16 11 33 4 2 1 7 40 68 249 7 324 3 414 56 473 797 837 8:15 4 13 1 18 1 0 2 3 21 32 250 2 284 5 290 47 342 626 647 7:30.810 '.25 58' 1 37 120 6 1 3 1 5 14 134 1 200 1081 1 12 1299 1 21 1420 255 1696 2995 3129 PHF 0.79 0.5 0.86 0.83 4:30. 6 1 10 17 50 7 23 80 97 2 425 1 6 433 11 382 2 395 828 925 4:45 2 0 6 8 34 9 29 72 80 3 457 9 469 13 460 2 475 944 1024 5:00 3 0 5 8 64 11 23 98 106 1 454 8 463 8 444 4 456 919 1025 5:15 7 0 8 15 56 11 65 132 147 2 488 16 506 19 462 0 481 1 987 1 1134 4:30.5:30 :18 14 1 1 29 1 48 204 1 38 140 1 382 430 1 8 1824 39 1871 51 1748 8 1807 3678 4108 PHF 0.71 0.72 0.92 0.94 APPENDIX B I oe �' U�,e !a �lati — �U TO tit AJ6 CI Ubv % r2t AL (?A 2 K VA2IAGLC LudtPLOYG"C-S .— 45-0 PUT0�C; R*T(;�- ��ec P �•vb-S DA y 3.34 %(a -7 '; l 70 �KA eau 0. 4- 0 z 0 001 0.0i 4. PM o u 0.0 Cl s OUZ 0.37 16 . i p-1? 'bIsiFe19L)TIpAJ Q.z .So- I 25� zo; ��cc..t�I�tJaR� cJ(TG" ��FFIC'_ /d��(G►d7�C.l6rNT F- 4/' �5rr& 3'�,� � r/!o ---y o NAQaO.Of P.CK e2Edrx- a I y M w E7CISnNC SIGNALIZED INTERSECTION PROPOSED FULL TURNOGNAL INTERSECTION I _4ti� FULL SE.CTI GNAL INTERSECTION RIGHTQS-IF INTERSE . ••. _ HARMONYC RRIDORSETBACK d iHkHNN18 Y U `ET°RR c 1 o w+�PE cI� tt PRIMARY& SECONDARY USES c -- _ S 1 13.39ACRESTOTAL lrncera I, 5.14 ACRES PRIMARY .1 v 00 IfN - PRIMARY & SECON >I�o�K��l 8.25ACRESSECONDARY I ®.__..d.-..... -�. USES I •_ A -� & _. �.._ 035 FAR EN R x m 5 w 0 21.5 ACRES TOTAL --._-.�+/17s.Doo-s.F GFni ; ' _ Q = 15.93 ACRES PRIMARY CL 5.57 ACRES SECONDA 0.35 FAR „ W • • • (+/- 328,000 S.F. GFA) ---- o / • Q (COLLECTOR STREET) Qf INTEL 1 I (EXI- i =w • rrmr"m>tmnr - - 32.0 ORES jWO ! ,.t.._ �: ACC zo1 Q CT ;i__--- p PRIMARY USES _- -. PARCEL BOUN r, • �p; _ '.... 13.9ACRES FAR —__ Q �; '.I-+1-1815050 0S.F.GFA) , WILDWOOD • SUBDIVISION4. p p • • • • • • • • • Q I 1_ uNet amsit'i�f • - -, s • J L.1 PROPOSEDFU INTERSECTION TURN • •`°" '• • • ¢ • PRIMARY USES USES 54.1 ACRES • PRIMARY 0.35 FAR 11.7ACRES (+/- 825.000 S.F. GFA) • • 0.35 FAR Q < • C • (+/-152,5W S.F. GFA) • uJz PRIMARY USES • • • - - - ...__.. _ w 0.35 FAR (+/- 607,000 S.F. GFA) i IV • Cu3TOM o SECOND • t'• SECONDARY USES USES • (,EpDlAJG �,. 11 • 13.5ACRES (NON- 18 DU/AC �' p SI'PC • (+1- 240 Units) I �g� 2.0 AGES �1�� 0.35 FAR ® • , • AroPo� ' +1-30,500S. r,�cTA— �vTA' • • GFA) • • • • • • O ® • • • ® @ ..® • 1' • • • • _ \�\j\\ IC__PRO `4 ROCK CREEK DRIVE " �& SCALE: 1"=3000' SITE LOCATION Figure 1 L V V V / v � � a• / V V/ • v u l V { � • v:• u .• • • v v �• .. .. .. - v v .. .. . ChaOter4 — AMWw mnts.. Attachment A Transportation Impact Study Base Assumptions Project Ioformadon Project Nam= C U S-rOA4 6L!~ D t AJ Q Project Location 11A MO e- 14 TIS Assumptions Type of Study Study Aa Boundaries Fes K 4le5- r o P L Fu1L- /�/p North P_ Audu Y u r - Intermediate: 1A fit( U South : (oce &'Eme East:LA oN West 1A-6YA460(,sr Study Years Short Range:. 2, p Long Range: future Traffic Growth Rate Z% ��q 2 CW a 4400J 11 i2Rto Study Intersections 1. All access drives 15. 2 2 L AWD 6- 3•LaD° rKbl;iSw 7' 4.4 Time Period for Study :a Sat Noon: A J O Trip Generation Rates Inc, e -r D Trip Adjustment Factors , Passby: /A pave &R Overall Trip Distribution SEE ATTACHED SKETCH. Mode Split Assumptions Ail ti . Committed Roadway Improvements A jo r Aw Aety .Q i-- A�1 Y Other Traffic Studies • FieoA.Jr a.ue&r i`LAQG �. s t ('�co ro.tJ Areas Requiring Special Study Dste:, JAIUr,)ARY 4 �2008 Trafixc Engineer. Local Entity Engi tali ner rAmnly urear Arai Snaw S — ttapamad and Rmwacwd Oc[~ 1. 2001 Page 4.35 Adopted by Uri~ covey, City or LovV*rA CRy or Part Ca a Z•d 46oS 699 ats oossd 40;t6a dLital so 40 uer I APPENDIX A C A& rmony Creek - Denotes Lane SHORT RANGE (2013) GEOMETRY Figure 9 TABLE 4 Short Range (2013) Total Peak Hour Operation TY -A Harmony/Lady Moon (signal) EB LT F C EBT B 0 EB RT A A EB APPROACH C D WB LT B C WB T E D WB RT B A WB APPROACH E D NB LT D D NB D D NB RT D D NB APPROACH D D SB LT D D SBT D D SB RT D D SB APPROACH D D OVERALL D D Rock Creek/Lady Moon (all -way stop) EB LTIT A A EB RT A A EB APPROACH A A WB LT/T/RT A A NB LT/T/RT A A SB LT A A SB T/RT A A SB APPROACH A A OVERALL A A Lady Moon/Precision (stop sign) EB LT/RT B A NB LT A A Rock Creek/Technology (stop sign) SB LT/RT A A EB LT/T A A N 0 0 2 ca co N 255/8 L' C4 co a 1790/2036 � �l 33/58 2008 --)� 1 t r Harmony 1293/1898 00 74/46 v LO 20 v r c� ao .- ci i '- rnl 1 >. Precision 0 3/12 Lo U N \ v O car° o L 42/23 ZNOM 73/35 --w— 105/76 + 3/1 t ,/ Rock Creek 5/1 38/9 101 /91 i 38/52 co Cl) M 25/30 CO m --a— AM/PM SHORT RANGE (2013) TOTAL PEAK HOUR TRAFFIC Figure 8 TABLE 3 Short Range (2013) Background Peak Hour Operation I it . Harmony/Lady Moon (signal) EB LT F C EBT B D EB RT A A EB APPROACH C D WB LT B C WB T E D WB RT B A WB APPROACH E DNB LT D D NB D D NB RT D D NB APPROACH D D SB LT D D SBT D D SB RT D D SB APPROACH D D OVERALL D D Rock Creek/Lady Moon (all -way stop) EB LTIT A A EB RT A A EB APPROACH A A WB LT/T/RT A A NB LT/TIRT A A SB LT A A SB T/RT A A SB APPROACH A A OVERALL A A C O O A& N T00 _ Mn�i 255/8 LO CO tO—1790/2036 J /—29/57 I ,/ Harmony 200/8 1293/1898 o M 04 CO 65/44 vLO c•> O) Un m 0 42/23 `I- ^ --o— 73/35 J /—3/1 38/9 Rock Creek f 38/52 co N M 25/30 co N --ms- AM/PM SHORT RANGE (2013) BACKGROUND PEAK HOUR TRAFFIC Figure 7 AM/PM SITE GENERATED PEAK HOUR TRAFFIC N O 0 -mony Creek Figure 6 Harmony 25% ------------- Rock Creek TRIP DISTRIBUTION N 45% I 20% Precision C 0 c 0 0 a v m J NOM -�-.► Figure 5 TABLE 2 Trip Generation /`� ` r` � Q' �yy� ^ A#AtiEY�'E {11�tf Peak dour' PM Pr�ak Hcwr i ^Y 130 Industrial Park 3.34 170 0.40 20 0.07 4 0.09 5 0.37 18 III IIII 4LOT 1 .92AC. PRECISION DRIVE LOT 2.00 AC. DRAINAGE TRACT 4.55 AC. ROCK CREEK DRIVE (ExeT W" ("W ROW VARIES) A& N SCALE: 1 "=200' w � m w LOT Z 1.93 0 0 AC. O QP2 Q J PRFc � IS�ON DA„ SCALE: 1"=100' SITE PLAN Figure 4 TABLE 1 Current Peak Hour Operation u _j it 1i f d CiN .. , L t't' yyY�w��.�• k 7 f:`.r�� :' J^ 11 VY�i!✓ -. .. n Harmony/Lady Moon (signal) EB LT E B EB T B D EB RT B B EB APPROACH C D WB LT B C WBT D C WB RT B A WB APPROACH D C NB LT C C NB T C C NB RT C C NB APPROACH C C SB LT C D SB T C C SB RT C C SB APPROACH C D OVERALL D D Rock Creek/Lady Moon (all -way stop) EB LT/T A A EB RT A A EB APPROACH A A WB LT/T/RT A A NB LTIT/RT A A SB LT A A SB T/RT A A SB APPROACH A A OVERALL A A C 0 o 2 J N co N 255/8 Itr co N r' cO �— 1420/1748 26/51 200/8 —J 1 t r Harmony 1087/1824 —.► I CO � N 58/39 Cl) i0 M v v a )�— 39/20 — 65/31 J j— 3/0 3518 34/46 —� 22/27 f r r rn M v n --w— AM/PM Rock Creek BALANCED RECENT PEAK HOUR TRAFFIC Figure 3 Cl 1-t r r°D) N "' `° co j C 0 0 A& cc J N 255/8 — 1420/1748 21 /51 f r Harmony 200/8 1087/1824 0 0)12/39 to iB N i N ch 39/15 `I- CO °' �— 65/31 3/0 Rock Creek 35/6 34/46 —� 22/27 .n �- AM/PM RECENT PEAK HOUR TRAFFIC Figure 2 Horsetooth a� rn m N Harmony Custom o Blending af m U .J Rock Creek 25 Kechter m c m a E 1- SCALE: 1 "=2D00' SITE LOCATION Figure 1 Y Based upon Fort Collins bicycle LOS criteria, there are no destination areas within 1320 feet of Custom Blending. The bicycle LOS worksheet is provided in Appendix F. Currently, this area is not served by Transfort. The nearest transit route is more than 0.25 miles from this site. It is concluded that, with full development of Custom Blending, the future level of service at the key intersections will be acceptable. The recommended geometry is shown in Figure 9. The level of service for pedestrian and bicycle modes will be acceptable. 2 shows the trip generation for Custom Blending. Custom Blending is expected to generate 170 daily trip ends, 24 morning peak hour trip ends, and 23 afternoon peak hour trip ends. The trip distribution for this site is shown in Figure 5. The trip distribution was determined using the existing traffic counts, knowledge of the existing and planned street system, development trends, and engineering judgment. Figure 6 shows the site generated traffic assignment of Custom Blending. Figure 7 shows the short range (2013) background peak hour traffic at the key intersections. Background traffic volume forecasts for the short range (2013) future were obtained by reviewing traffic studies for other developments in this area and reviewing historic counts in the area. Table 3 shows the short range (2013) background peak hour operation at the key intersections. Calculation forms are provided in Appendix D. The key intersections will operate acceptably with the existing control and geometry, except for the eastbound left turns at the Harmony/Lady Moon intersection during the morning peak hour. The analyses used the peak hour factors that were either calculated or allowed by the TIS guidelines. These were based upon the counted traffic. As traffic volumes increase over time, experience indicates that the peak hour factors will increase (approach 1.0). An increase in traffic on Harmony Road and an increase in the peak hour factor will reduce the calculated delay to the subject eastbound left turns, which are shown to operate at level of service F in Table 3. Figure 8 shows the short range (2013) total peak hour traffic at the key intersections. Table 4 shows the short range (2013) total peak hour operation at the key intersections. Calculation forms are provided in Appendix E. The key intersections will operate acceptably during the peak hours, except for the eastbound left turns at the Harmony/Lady Moon intersection during the morning peak hour. It should be noted that the calculated delay for the eastbound left turns is the same as that with the background traffic. Therefore, the Custom Blending site -generated traffic has no bearing on the operation of this movement. Figure 9 shows the short range (2013) geometry at the key intersections. The geometry at the Rock Creek/Technology and Lady Moon/Precision intersections is per Stantec design drawings. The Custom Blending site is in an area within which the City requires pedestrian and bicycle level of service evaluations. Appendix F shows a map of the area that is within 1320 feet of Custom Blending. The Custom Blending site is located within an area termed as "other," which sets the level of service threshold at LOS C for all measured categories. There is one destination area within 1320 feet of the proposed Custom Blending: 1) the residential neighborhood to the southeast. There will be sidewalks adjacent to the site along the south side of Precision Drive, along the west side of Lady Moon between Rock Creek Drive and Precision Drive, and along the north side of Rock Creek Drive from Lady Moon Drive to Technology Parkway. Appendix F contains a Pedestrian LOS Worksheet. DELICH ASSOCIATES Traffic & Transportation Engineering �� L 2272 Glen Haven Drive Loveland, Colorado 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 �7 ", r MEMORANDUM TO: Angela Milewski, BHA Design Dave Lingle, Aller-Lin le Architects Jason Bird, Stantec City of Fort Collins 5 `� FROM: Matt Delich DATE: January 30, 2008 SUBJECT: Custom Blending Transportation Impact Study (File: 0801ME01) This memorandum addresses the transportation impacts of the proposed Custom Blending building. The Custom Blending building is proposed to be located east of Ziegler Road and just north of Rock Creek Drive in Fort Collins. The site location is shown in Figure 1. Custom Blending is a- food/spice manufacturing operation that is currently located in the Airport Industrial Park in Larimer County. The scope of this study was discussed with the Fort Collins Traffic Operations Engineer. A brief memorandum was requested. The Base Assumptions form is provided in Appendix A. There are sidewalks along the east side of Lady Moon Drive and along the south side of Rock Creek Drive. There are bicycle lanes along Lady Moon Drive and Rock Creek Drive. Figure 2 shows recent peak hour counts at the Harmony/Lady Moon and Rock Creek/Lady Moon intersections. Raw traffic data is provided in Appendix B. Since the traffic counts were obtained on different days, they were balanced/adjusted between Harmony Road and Rock Creek Drive. These are shown in Figure 3. Table 1 shows the current peak hour operation of the key intersections. Calculation forms are provided in Appendix C. A description of level of service for signalized and unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. The key intersections operate acceptably during the peak hours. The Custom Blending site is in an area termed "other." Figure 4 shows the site plan for Custom Blending. Custom Blending will have up to 50 employees. Access to the site will be via future Precision Drive and future Technology Parkway. Technology Parkway will only be built from Precision Drive to Rock Creek Drive as shown in Figure 4. Trip Generation, 7th Edition, ITE was used as the reference document in calculating the trip generation. Land use code 130, Industrial Park was used for the Custom Blending building. Table