HomeMy WebLinkAboutHARMONY TECH. PARK 3RD FILING, CUSTOM BLENDING - CTR - - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONSteve Olt - Custom Blending.pdf
Page 3
c
a t1
���� as� � ems.. -- •.� ? TM� E
�r
NPESTON JR NIDN�.
Approximate Location �
of proposed site
i
F� 6
4 f
L J f INP e
M
RIDGE NfOMFEL
SCNOOL ee (r`i�-fR'ft,'�ii
r "q
N Custom Blending
A , inch equals 600 feel Conceptual Review - 12/10/2007 Aerial Vicinity Map
Steve Olt - Custom Blending.pdf Page 4
N Custom Blending
AConceptual Review - 12/10/2007 ZONING DISTRICTS
Steve Olt - Custom Blending.pdf Page 2
G
W-re
n.oyw arrrl
r, l-�-Tr-1-r�-r �'i rT-rr�1-T�-r-� T-,
I WMw11 I l l l l 1 1 Il-T 11 1 1
p'w wMI1�IXItYIi I�oYw�wM�l//
Conceptual Review Application(0� wwa)
s:
General Information r of rVn ramn:i�
All proposed development projects begin with Conceptual Review. Anyone with a development
idea can schedule a Conceptual Review meeting to get feedback on prospective development
ideas. At this stage, the development idea does not need to be finalized or professionally
presented. However, a sketch plan and this application must be submitted to City staff prior to
the Conceptual Review meeting. The more information you are able to provide, the better
feedback you are likely to get from the meeting.
Conceptual Reviews are scheduled on three Mondays per month. One half-hour meeting is
allotted per applicant. Please call Current Planning at 416-2283 or 221-6750 to schedule a
Conceptual Review meeting. Conceptual Review is a free service. Applications and sketch
plans must be submitted to City staff no later than 5pm on the Tuesday prior to the Monday
Conceptual Review meeting. Application materials can be dropped off in person to 281 N.
College, emailed to RMichelsCcbfcgov.com (or ftcplanning(a)msn.com) or faxed (970) 224-6134.
At Conceptual Review, you will meet with staff from a number of City departments, including
Current Planning, Light and Power, Natural Resources, Stormwater, Water/Wastewater, Zoning,
Transportation, Engineering and Poudre Fire Authority. Comments are offered by staff to assist
you in preparing the detailed components of the project application. There is no approval or
denial of development proposals associated with Conceptual Review. After the meeting, a City
planner will follow-up with the applicant in writing, summarizing staff's comments.
Contact Name(s) and Role(s): AlIM- -LI'JMk /�r'Ghi'+ec(5 Pr
niL v 'd
Business Name (if applicable): I I LAZ .
Phone Number: M-)O) 2sZs— If�20
Fax Number: Mo) 223 — 1833
Mailing Address: 7I -Z Wkal crs WGl 4i , '5k. 5100 , FG 80525
Email Address: oIII✓IAIG ',GAILY'— I . CA
Site Address or Location Description: UP1 bIA,++rd L -h C3AOtZ4-� M
C,'sl'MA .L� —6w" L dy Mom br. 76&Amo[oav NwV.
Description of Proposal: (attach additional sheets ifneca—sary)
GW MkMM
CU rr Li`
yjc ►nd +V 50, 0O0 !r3A . ff- 1 A fu�,c 6"IV 0 d , Au pgx&e 1.
Suaoested items for the sketch elan:
• Property location and boundaries
• Surrounding land uses
• Proposed use(s)
• Existing and proposed improvements (buildings, landscaping, parking/drive areas)
• Existing natural features (water bodies, wetlands, large trees, wildlife)
• Utility line locations (if known)
• Photographs (helpful but not required)
*The more information provided on your sketch plan will result in more specific and
detailed comments about your proposal.