Loading...
HomeMy WebLinkAboutFORT COLLINS SUPPORTIVE HOUSING - FDP - 08-07/A - CORRESPONDENCE - (11)No Text .a r r -. - „�a.a"-_ _ - _ J �s��T -.:. _.� .. _._•ct_afN�^_a 'ice'- _ a. r h! y 5 T. is rr A tb ' Architect's Field Report Fort Collins Supportive Housing — Fort Collins. Colorado January 4, 2008 Page 3 of 3 Schedule —The Construction Contract has established a 10-month construction time - the Contractor is proposing a schedule based on 7 months of construction. In any case, 90 days prior to expected Permission to Occupy (PTO), the Contractor is to give the Owner and Architect notice of the expected date of completion so that Owner may begin arrangements for occupancy. Submittals — Not discussed. Architect is processing doors, hardware, and specialties at this time. A CD copy of Architect's CAD drawing files was delivered to the Contractor. Contractor's Requisition — A requisition for 3% of the Contract Amount was prepared by the Contractor, reviewed, and signed for work in place. Supporting documentation (fee slips. invoices, payment stubs) will be provided prior to the second requisition to attest to fees paid ty the Contractor and to permit release of utility fees the Owner has already paid the Contractor. Next meeting date and time: Tuesday, February 05, 2008, 1:00 PM. Draw meetings will be held on the first Tuesday of each month for requisitions covering the prior month's work. DISTYLE DESIGN, P.C. Written By: Michael Knisely Issued By: Michael D. Knisely. Principal Copies To: All in attendance —Via E-mail Innovative Structural Solutions, P.A. — Rob Hutchinson M&E Engineering. Inc. — David Hierseman 051104.AFROOl.doc Architect's Field Report Fort Collins Supportive Housing — Fort Collins. Colorado January 4, 2008 Page 2 of 3 Underground stormwater culvert is installed under the entrance drive and out to daylight on the east side of the existing, abandoned drive in the center of the site. The drainage ditch concrete walls have been removed out to the east property line. None of the existing trees on the property along E. Harmony were viable enough to be preserved. Site is grubbed and roughly graded at the building and parking areas. Interior, below -slab subgrade has not been removed or reconditioned at the time of this report. Building Concrete footings have been excavated, formed, and poured. Footings are neatly constructed and from appearances are true to line and dimension. Reinforcing steel and anchors are in accordance with the Construction Documents and approved Shop Drawings where observed. Masonry foundation walls are about 80% complete. ITEMS TO VERIFY 1. Contractor should keep on file some documentation that shows the adjacent property owner to the east has permitted the temporary use of their property for project access and construction parking. INFORMATION OR ACTION REQUIRED. 1. Contractor will obtain a price from their excavator for removal of existing subgrade soils down to the bottom of the in -place footings, and replacing with engineered compacted fill to limit the effects and potential for swelling of cohesive soils below the concrete slab. ATTACHMENTS.• Photographs. PROGRESS MEETING MINUTES: Items Discussed — HUD Inspector and Owner facilitated the preconstruction conference and reviewed proceedures and formats for communication, labor reporting, payment requisitions. retainage reduction and release, and change orders. Partial release of retainage will not occur unless it can be ascertained that work remaining can be covered by the amounts held, and in no case until work is completed with only warranty items remaining. Expansive under -slab soils were discussed along with measures being taken to mitigate and limit the amount of slab heave in the event soils become saturated. The intention is to permit the entire building to replace or condition soils to decrease the likelihood of differential settlement. 051104.AFROOI .doc 4�� D 1 5 T Y L E Architect's Field Report Project: Fort Collins Supportive Housing Fort Collins, Colorado Project No.: 05.11.04 HUD No. 101-HD041 Date: January 4, 2008 Report Number 001 EST. /.OFCOMPLETION. 2% WEATHER. Overcast, 30-50s SCHEDULE(+,-): On Schedule WORK /N PROGRESS. PRESENT Masonry foundation watts Heath Construction — Joey Hardy, Alan Kee Heath Superintendent — David Chismar HUD Inspector (DFW Group) — John Pettit ASI — Dan Billmark Distyle Design — Michael Knisely OBSERVA T/ONS.• Site General: One of the two required project signs is in place at the west entrance of the project. Stone construction entrance base is installed. Erosion control fencing is installed at the perimeter of the site in general compliance with the Construction Documents. The 100 foot habitat area on the south portion of the site is protected and appears undisturbed. Construction worker traffic is entering and exiting E. Harmony Road through the site immediately east of the Project (formerly Simpson's property). Vehicles are parked along the 6' high fence on the south side of that lot. Construction trailer is in place in the northeast corner of the Project site. Masonry construction materials (CMU and mortar) for foundation walls are on site. The site is clean, and well organized, with good separation between worker and construction traffic. 620 MendeLssohn Ave. R, Suite 116 Golden Valley, Minnesota 55427 17631 591.0996 17d31 591.096A ARCHITECTURE + URBAN DESIGN