Response to Fairway Estates ACC Comments
9/13/2006
Page 2 of 2
5. Connectivity plan to JFK/Hogan at Harmony — The City and developer are currently
discussing improvements to accommodate non -vehicular traffic. Sidewalks are
being provided along the front of the site that will tie into walkways on either side
as adjacent development occurs. Discussions are underway with the City
regarding the potential for an earlier extension of the sidewalk to the Hogan/JFK
intersection with respect to legal and federal considerations.
6. Traffic plans/studies — The proposed project is, by its nature, of low impact and
intensity. In light of this, the City is requiring a traffic memorandum be prepared
to assess the specific traffic impacts of this development. A right turn lane is
planned to extend over 400 feet to the West to accommodate the supportive
housing site as well as adjacent lots with limited access to Harmony. Access to
adjacent. properties is provided by a drive that runs parallel to Harmony. This is
wholly contained in an existing City access easement across the north end of the
property. Within this existing City easement is a narrow bridle path easement that
runs along Harmony Road and located on what wilt be the new City required
service road. Though ASI does not plan to eliminate the easement from the plat,
the City may at some point require that the easement be vacated in lieu of the new
service road and/or the bridal path's functionality in lieu of the wider public side
walk area in close proximity.
WRITTEN AND ISSUED BY:
DISTYLE DESIGN. P.C.
Michael D. Knisely
Copies To: Fort Collins Supportive Housing, Inc. — Dan Billmark, Tim Mowbray
Realtec Commercial Real Estate Services. Inc. — Larry Stroud
Fairway Estates — David Ramsey
C.
4--
0 1 5 T Y L E
D E 8 I. G N
Memorandum
Project: Fort Collins Supportive Housing
Fort Collins, Colorado
Project No.: 05.11.04
Date: September 13, 2006
Response to Fairway Estates ACC Comments:
Landscape Plan— A preliminary landscape plan has been prepared for the project.
The final landscape plan will comply with all City of Ft. Collins requirements
including addressing appropriate specific areas of landscape or fence buffering
between proposed site improvements and adjacent properties. Since there are no
particular hazards on site, fencing is not planned for the project.
2. Utility Plan — Layout and design of utilities will be done in strict compliance with
City and agency regulations.: The project will: be sprinklered for fire protection.
Separate domestic water will be brought to the site. Other utilities include
connection to the public sanitary system, and natural gas service for mechanical
systems and heat. Appropriate screening will be provided as required. A
coordination meeting will be held with affected utilities. All utility connections are
anticipated to occur via underground connection from the building to the
respective utility running along the Harmony corridor.
Lighting plan — Though the ears to be only two adjacent resident dwellings, in
close proximity to the site, only the a ed portion of the site will have site
S� pE lighting and that will only be minimally lit for . F' s will be pole-
1t✓`,s mounted area lights with downcast housings and a ectors at cut off. lighting to
S E prevent spill over onto adjacent property. A light in plan will be prepared
for the exact plan proposed in order to verify compliance with the City's ordinance.
4. A stormwater plan will be provided which will show necessary filtration ponding
and detention as required by the authority having jurisdiction. A preliminary
grading plan has been prepared showing the drainage concept and the location of
a depressed stormwater pond. It will be located and sized to maintain existing
waterflow locations and levels.