HomeMy WebLinkAboutWATERFIELD ODP - ODP130002 - CORRESPONDENCE - (7)Department: Technical Servwes
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 09/17/2013
09/17/2013: ODP Plan: The "Notes" text is very light on our copy. Please darken this text. See
redlines.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcqov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 08/21/2013
09/17/2013: For clarification, the City cannot guarantee at this time that the "TEE" intersection
with New Vine Drive west of Merganser will be allowed as a full movement intersection. It is
recognized that the Site Plan indicates it as a limited turn intersection.
08/21/2013: Sht OU1: At this time the City cannot give assurance of providing 2 full movement
accesses on either New Vine or Timberline.
Comment Number: 4 Comment Originated: 09/17/2013
09/17/2013: The City cannot guarantee at this time that the north access to Timberline Road will
be a full movement intersection. It is recognized that the Site Plan indicates it as a potentially
limited turn intersection.
Topic: Traffic Impact Study
Comment Number: 3
Comment Originated: 09/17/2013
09/17/2013: Even though it's not stated in the ODP TIS, it should be understood that each PDP
submittal will need to evaluate its traffic impacts at the Vine and Lemay intersection. The
intersection is approaching levels of service failures which per City Codes may need to be
mitigated before the project can continue. This comment is considered Resolved but is
provided as Active so all parties can be knowledgeable of the comment.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcqov.com
Topic: General
Comment Number: 3 Comment Originated: 09/17/2013
09/17/2013: No further comments on the ODP.
Topic: General
Comment Number: 3 Comment Originated: 08/19/2013
09/18/2013: A note was added to the plans but the note appeared incomplete and difficult to
read. Please revise and complete note. 08/19/2013: Street connectivity is not being met
north of this property because of the irrigation ditch. Please include this in the general notes.
Comment Number: 4 Comment Originated: 08/19/2013
09/18/2013: There are still some access points that are not labeled (see redlines). 08/19/2013:
Internal local streets do not need to be shown from an engineering standpoint. Please include
arrows or symbols showing the access and spacing of access into the property along with all
access off of collector and arterials. Additionally, please denote what type of movement each
access is i.e. (Full, 3/4, right in right out, etc.)
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 08/21/2013
08/21 /2013:
An updated landscape plan including street tree selection (from current City Street Tree List)
and placement will need to be submitted on final plans.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/13/2013
08/13/2013: Light & Power has existing electric facilities running along both sides of Merganser
Dr. to the North of edge of the Bull Run development with vaults and stubs existing. Any
relocation or modification to the existing facilities will incur system modification charges.
Comment Number: 2 Comment Originated: 08/13/2013
08/13/2013: Light & Power currently has no electric facilities near the proposed school site.
This would have to be brought form Turnberry & existing Vine Dr. and possibly through the
subdivision to create a loop feed. If 3-phase will be required for a park or possible recreation
area coordinate this early on with Light & Power Engineering.
Comment Number: 3
Comment Originated: 08/13/2013
08/13/2013: A C-1 form and One -line diagram will be required for any proposed commercial
areas on the site.
Comment Number: 4
Comment Originated: 08/13/2013
08/13/2013: Electric Capacity Fee and Building Site charges will apply to this development.
Light & Power Engineering 970-221-6700.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/20/2013
08/20/2013: No comments.
Ct
F8ryf ollins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentre view
September 18, 2013
Stephanie Sigler
Ripley Design, Inc.
401 W. Mountain Ave.
Fort Collins, CO 80521
RE: Waterfield ODP, ODP130002, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/18/2013
09/18/2013: Regarding Parcel C and the size of the future L-M-N neighborhood center, It's not
clear how four acres are netted out resulting in a five acre center. If the future Conifer
right-of-way, irrigation ditch easement and electrical transmission line easement result in four
acres, then a note should be provided indicating these existing and future conditions.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
Comment Number: 7
Comment Originated: 09/18/2013
09/18/2013: The engineering plans show a little more detail to the roadway network for the ODP
but in some cases the site plan and engineering drawings to match up with intersection location
and turning movements allowed at intersections.