ODP Revision 2—Comment Responses
Page 4 of 4
mitigated before the project can continue. This comment is considered Resolved but is
provided as Active so all parties can be knowledgeable of the comment.
Response: Acknowledged
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221-6854, rbuffington fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 09/17/2013
09/17/2013: No further comments on the ODP.
Response: Acknowledged.
Waterfield
ODP Revision 2—Comment Responses
Page 3 of 4
areas on the site.
Response. Acknowledged.
Comment Number: 4
Comment Originated: 08/13/2013
08/13/2013. Electric Capacity Fee and Building Site charges will apply to this development.
Light & Power Engineering 970-221-6700.
Response: Acknowledged.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1
08/20/2013: No comments.
Response: Acknowledged.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icountyCcDfcgov.com
Topic: General
Comment Originated: 08/20/2013
Comment Number: 5 Comment Originated: 09/17/2013
09/17/2013: ODP Plan: The "Notes" text is very light on our copy. Please darken this text. See
redlines.
Response: Notes have been revised.
Department: Traffic Operation
Contact: Ward Stanford, 970.221-6820, wstanfordPfcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 08/21/2013
09/17/2013: For clarification, the City cannot guarantee at this time that the "TEE" intersection
with New Vine Drive west of Merganser will be allowed as a full movement intersection. It is
recognized that the Site Plan indicates it as a limited turn intersection.
08/21/2013: Sht OU1: At this time the City cannot give assurance of providing 2 full movement
accesses on either New Vine or Timberline.
Response: Individual intersection movements will be further discussed and designed during Preliminary
Development Review of Waterfield.
Comment Number: 4 Comment Originated: 09/17/2013
09/17/2013: The City cannot guarantee at this time that the north access to Timberline Road will
be a full movement intersection. It is recognized that the Site Plan indicates it as a potentially
limited turn intersection.
Response: Individual intersection movements will be further discussed and designed during Preliminary
Development Review of Waterfield.
Topic: Traffic Impact Study
Comment Number: 3
Comment Originated: 09/17/2013
09/17/2013: Even though it's not stated in the CDP TIS, it should be understood that each PDP
submittal will need to evaluate its traffic impacts at the Vine and Lemay intersection. The
intersection is approaching levels of service failures which per City Codes may need to be
Waterfield
ODP Revision 2—comment Responses
Page 2 of 4
and turning movements allowed at intersections.
Response: The medians have been removed from the engineering drawings. Movements are now only
shown on the site plan.
Topic: General
Comment Number: 3 Comment Originated: 08/19/2013
09/18/2013: A note was added to the plans but the note appeared incomplete and difficult to
read. Please revise and complete note. 08/19/2013: Street connectivity is not being met
north of this property because of the irrigation ditch. Please include this in the general notes.
Response: Notes have been revised.
Comment Number: 4 Comment Originated: 08/19/2013
09/18/2013: There are still some access points that are not labeled (see redlines). 08/19/2013:
Internal local streets do not need to be shown from an engineering standpoint. Please include
arrows or symbols showing the access and spacing of access into the property along with all
access off of collector and arterials. Additionally, please denote what type of movement each
access is i.e. (Full, 3/4, right in right out, etc.)
Response: Plans have been revised.
Department: Forestry
Contact: Tim Buchanan, 970.221-6361, tbuchanan(afcgov.com
Topic: Landscape Plans
Comment Number: 1
08/21 /2013:
Comment Originated: 08/21/2013
An updated landscape plan including street tree selection (from current City Street Tree List)
and placement will need to be submitted on final plans.
Response: Acknowledged.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish(@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 08/13/2013
08/13/2013: Light & Power has existing electric facilities running along both sides of Merganser
Dr. to the North of edge of the Bull Run development with vaults and stubs existing. Any
relocation or modification to the existing facilities will incur system modification charges.
Response: Acknowledged.
Comment Number: 2 Comment Originated: 08/13/2013
08/13/2013: Light & Power currently has no electric facilities near the proposed school site.
This would have to be brought form Tumberry & existing Vine Dr. and possibly through the
subdivision to create a loop feed. If 3-phase will be required for a park or possible recreation
area coordinate this early on with Light & Power Engineering.
Response: Acknowledged.
Comment Number: 3 Comment Originated: 08/13/2013
08/13/2013: A C-1 form and One -line diagram will be required for any proposed commercial
land planning - landscape architecture ■ urban design ■ entitlement
October 24, 2013
Mr. Ted Shepard
City of Fort Collins
Planning Department
281 North College Avenue
Fort Collins, CO 80521
RE: Waterfield ODP, ODP130002, Round Number 2 Responses
Please see the following summary of response to comments and the revised drawings of the above referenced project.
If you have questions about any comments, you may contact the individual commenter:
Stephanie Sigler, Ripley Design Inc. responses in red 970-224-5828
Bud Curtis / Cody Snowden, Northern Engineering responses in blue 970-221-4158
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard(afcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/18/2013
09/18/2013: Regarding Parcel C and the size of the future L-M-N neighborhood center, It's not
clear how four acres are netted out resulting in a five acre center. If the future Conifer
right-of-way, irrigation ditch easement and electrical transmission line easement result in four
acres, then a note should be provided indicating these existing and future conditions.
Response: A note has been added to the ODP under the Site Data table. Additionally, from the 9.3 acres
2.0 acres is the electrical easement, .6 acres is taken by the proposed community trail, 1.5 acres will be
dedicated ROW with the addition of Conifer Street and connecting the local street to conifer, 1.7 acres are
within the Larimer and Weld County Canal ROW leaving 3.5 net acres of developable land.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970.221.6603, agingerich(cDfcgov.com
Topic: Construction Drawings
Comment Number: 7
Comment Originated: 09/18/2013
09/18/2013: The engineering plans show a little more detail to the roadway network for the ODP
but in some cases the site plan and engineering drawings to match up with intersection location