Loading...
HomeMy WebLinkAboutWATERFIELD ODP - ODP130002 - CORRESPONDENCE -Waterfield ODP Revision 2—Comment Responses Page 4 of 4 mitigated before the project can continue. This comment is considered Resolved but is provided as Active so all parties can be knowledgeable of the comment. Response: Acknowledged Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221-6854, rbuffington fcgov.com Topic: General Comment Number: 3 Comment Originated: 09/17/2013 09/17/2013: No further comments on the ODP. Response: Acknowledged. Waterfield ODP Revision 2—Comment Responses Page 3 of 4 areas on the site. Response. Acknowledged. Comment Number: 4 Comment Originated: 08/13/2013 08/13/2013. Electric Capacity Fee and Building Site charges will apply to this development. Light & Power Engineering 970-221-6700. Response: Acknowledged. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 1 08/20/2013: No comments. Response: Acknowledged. Department: Technical Services Contact: Jeff County, 970-221-6588, icountyCcDfcgov.com Topic: General Comment Originated: 08/20/2013 Comment Number: 5 Comment Originated: 09/17/2013 09/17/2013: ODP Plan: The "Notes" text is very light on our copy. Please darken this text. See redlines. Response: Notes have been revised. Department: Traffic Operation Contact: Ward Stanford, 970.221-6820, wstanfordPfcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 08/21/2013 09/17/2013: For clarification, the City cannot guarantee at this time that the "TEE" intersection with New Vine Drive west of Merganser will be allowed as a full movement intersection. It is recognized that the Site Plan indicates it as a limited turn intersection. 08/21/2013: Sht OU1: At this time the City cannot give assurance of providing 2 full movement accesses on either New Vine or Timberline. Response: Individual intersection movements will be further discussed and designed during Preliminary Development Review of Waterfield. Comment Number: 4 Comment Originated: 09/17/2013 09/17/2013: The City cannot guarantee at this time that the north access to Timberline Road will be a full movement intersection. It is recognized that the Site Plan indicates it as a potentially limited turn intersection. Response: Individual intersection movements will be further discussed and designed during Preliminary Development Review of Waterfield. Topic: Traffic Impact Study Comment Number: 3 Comment Originated: 09/17/2013 09/17/2013: Even though it's not stated in the CDP TIS, it should be understood that each PDP submittal will need to evaluate its traffic impacts at the Vine and Lemay intersection. The intersection is approaching levels of service failures which per City Codes may need to be Waterfield ODP Revision 2—comment Responses Page 2 of 4 and turning movements allowed at intersections. Response: The medians have been removed from the engineering drawings. Movements are now only shown on the site plan. Topic: General Comment Number: 3 Comment Originated: 08/19/2013 09/18/2013: A note was added to the plans but the note appeared incomplete and difficult to read. Please revise and complete note. 08/19/2013: Street connectivity is not being met north of this property because of the irrigation ditch. Please include this in the general notes. Response: Notes have been revised. Comment Number: 4 Comment Originated: 08/19/2013 09/18/2013: There are still some access points that are not labeled (see redlines). 08/19/2013: Internal local streets do not need to be shown from an engineering standpoint. Please include arrows or symbols showing the access and spacing of access into the property along with all access off of collector and arterials. Additionally, please denote what type of movement each access is i.e. (Full, 3/4, right in right out, etc.) Response: Plans have been revised. Department: Forestry Contact: Tim Buchanan, 970.221-6361, tbuchanan(afcgov.com Topic: Landscape Plans Comment Number: 1 08/21 /2013: Comment Originated: 08/21/2013 An updated landscape plan including street tree selection (from current City Street Tree List) and placement will need to be submitted on final plans. Response: Acknowledged. Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish(@fcqov.com Topic: General Comment Number: 1 Comment Originated: 08/13/2013 08/13/2013: Light & Power has existing electric facilities running along both sides of Merganser Dr. to the North of edge of the Bull Run development with vaults and stubs existing. Any relocation or modification to the existing facilities will incur system modification charges. Response: Acknowledged. Comment Number: 2 Comment Originated: 08/13/2013 08/13/2013: Light & Power currently has no electric facilities near the proposed school site. This would have to be brought form Tumberry & existing Vine Dr. and possibly through the subdivision to create a loop feed. If 3-phase will be required for a park or possible recreation area coordinate this early on with Light & Power Engineering. Response: Acknowledged. Comment Number: 3 Comment Originated: 08/13/2013 08/13/2013: A C-1 form and One -line diagram will be required for any proposed commercial land planning - landscape architecture ■ urban design ■ entitlement October 24, 2013 Mr. Ted Shepard City of Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80521 RE: Waterfield ODP, ODP130002, Round Number 2 Responses Please see the following summary of response to comments and the revised drawings of the above referenced project. If you have questions about any comments, you may contact the individual commenter: Stephanie Sigler, Ripley Design Inc. responses in red 970-224-5828 Bud Curtis / Cody Snowden, Northern Engineering responses in blue 970-221-4158 Comment Summary: Department: Current Planning Contact: Ted Shepard, 970-221-6343, tshepard(afcgov.com Topic: General Comment Number: 1 Comment Originated: 09/18/2013 09/18/2013: Regarding Parcel C and the size of the future L-M-N neighborhood center, It's not clear how four acres are netted out resulting in a five acre center. If the future Conifer right-of-way, irrigation ditch easement and electrical transmission line easement result in four acres, then a note should be provided indicating these existing and future conditions. Response: A note has been added to the ODP under the Site Data table. Additionally, from the 9.3 acres 2.0 acres is the electrical easement, .6 acres is taken by the proposed community trail, 1.5 acres will be dedicated ROW with the addition of Conifer Street and connecting the local street to conifer, 1.7 acres are within the Larimer and Weld County Canal ROW leaving 3.5 net acres of developable land. Department: Engineering Development Review Contact: Andrew Gingerich, 970.221.6603, agingerich(cDfcgov.com Topic: Construction Drawings Comment Number: 7 Comment Originated: 09/18/2013 09/18/2013: The engineering plans show a little more detail to the roadway network for the ODP but in some cases the site plan and engineering drawings to match up with intersection location