HomeMy WebLinkAboutFORT COLLINS SUPPORTIVE HOUSING - PDP - 08-07 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVES17. Any existing sidewalk, curb, or gutter that is damaged or in disrepair must be repaired prior to issuance of Certificate of Occupancy. 18. A Development Agreement will be required prior to recording of the plans. For further information, please contact Marc Virata, Development Review Engineer, 221-6605. When the Development Agreement, Utility Plans, and Planning documents (site plan, landscape plan, architectural elevations and lighting plan) are all signed and recorded, the project is entitled to proceed with construction, subject to the Development Construction Permit. 19. The Engineering Department will require that Accessible Space, Inc. and Comfort Dental coordinate the design of the sidewalk, curb and gutter along Harmony Road. The timing of the installation of these improvements may depend on who goes first. If the parties do not develop simultaneously, than an escrow for securing these improvements from one of the parties may also be required, or a Repay Agreement may be needed to reimburse the first developer. 20. A utility coordination meeting may be required to design the installation and proper separation of all underground utilities. 21. The dwelling units will be assessed a Capital Expansion Fee based on the size of the units. The fee is collected at the time of building permit issuance. Please note that the fee is adjusted annually based on the Denver -Boulder consumer price Index. Please check with Felix Lee, 221- 6760, to see if the fee will be increased in 2004. 22. For further information on energy conservation, electrical demand reduction programs and daylighting techniques, please contact Doug Swartz, Energy Service Engineer, City of Fort Collins Utilities, 221-6700. 23. The use of native plants and grasses is encouraged. The existing trees are attractive but do not have significant wildlife value. Please refer to the Forestry Department for disposition. 24. If there are any existing trees, they should be evaluated by Tim Buchanan, City Forester. If the trees are deemed significant, then mitigation trees may be necessary. 25. The Department of Natural Resources was unable to attend the Conceptual Review meeting. Please contact Doug Moore, Environmental Planner, 221-6143. The topics that should be discussed include the buffer from Mail Creek. The standard calls for a 100' natural habitat and features buffer zone from Mail Creek. Also, please check with Mr. Moore as to whether or not an ecological characterization study (Section 3.4.1 (D) (1) Of the Fort Collins Land Use Code) will be required. In addition, please discuss with Mr. Moore what proof of compliance with Federal, state and local environmental regulations (404 permits, Endangered and Threatened Species Act, etc.), article 3.4.1 (0) LUC may be required. 26. The contact at Public Service Company/Xcel Energy is Mr. Len Hildebrand, 225-7848. 27. The contact at US WesUQwesl is Mr. Bob Rulli, 377-6401. 28. You are encouraged to continue a dialogue with Mr. David Ramsay, President of the Fairway Estates Homeowner's Association, to discuss the development proposal and other legal issues associated with the restrictive covenant. 29. A neighborhood information meeting is required prior to formal submittal of the Project Development Plan. s • Is recyclable materials. It is recommended that they be placed on concrete pads. 5. Section 3.5.2(C)(1) requires that building entrances be located within 200 feet of J.F.K. Parkway and be connected by a connecting walkway. Please note that a Connecting Walkway shall mean (1) any street sidewalk, or (2) any walkway that directly connects a main entrance of a building to the street sidewalk without requidng pedestrians to walk across parking lots or driveway, around buildings or around parking lot outlines which are not aligned to a logical route. 6. The site will be served electricity by the City of Fort Collins Light and Power Department. Three-phase electrical power is available to the west, on the south side of Harmony Road at College Avenue. Or power could be brought from the north side of Harmony Road but this would require either boring or cutting Harmony Road. A Street Cut Fee is assessed for an open trench across Harmony. Normal electrical charges will apply. Any system modification, such as moving vaults or streetlights will be at the developer's expense. For an estimate of the 2005 charges, please refer to the handout. A Commercial One ('C-1") Form must be completed by an electrical contractor to determine entrance capacity for each building. The location of the electrical transformers must be coordinated with Light and Power and Current Planning so that they are not located along the roadway, but, rather, in a less visible location yet within ten feet of hard surface for emergency change -out. Electrical meters should be on the opposite side of the building as the gas meters. A utility coordination meeting Is recommended to ensure the proper separation from other utilities. For further information, please contact Bruce Vogel, 221-6700. 8. The site is located within the service territory of the Fort Collins Loveland Water District and the South Fort Collins Sanitation District. For further information, please contact Terry Farill, 226-3104. 9. The site will be served by the Poudre Fire Authority. The building's address must be clearly visible from Harmony Road by a monument sign. A fire hydrant capable of delivering a minimum of 1,500 gallons per minute at 20 p.s.i. residual pressure and must be located within 300 feet of the building. An automatic fire extinguishing system will be required and must be provided by a six-inch diameter fire line. Since the building is three stories, the emergency fire access lane must be a minimum of 30 feet along one side of the building, with minimum turning radii of 25 feet inside and 50 feel outside. This lane must be platted or dedicated as an emergency access easement. For further information, please contact Mike Chavez, 221-6570. 10. This site is in the McClellands/Mail Creek drainage basin where the new development fee is $3,717/acre which is subject to the runoff coefficient reduction. The site is in inventory grid #8Q. The standard drainage and erosion control reports and construction plans are required and they must be prepared by a professional engineer registered in Colorado. 11. Onsite extended detention is required to Veal the runoff. Water quantity detention release rates are 0.2 cfs/acre for the 10 year storm and 0.5 cfs/acre for the 100 year storm. However, the design engineer may want to evaluate whether the site drainage can beat the peak of Mail Creek or Is some how mitigated by the on -stream ponds in Fairway Estates. 12. In addition to the Project Development Plan, the property will need to be platted. 13. A Transportation Impact Study will be required. To determine the scope of this study and which intersections to analyze, please contact Eric Bracke or Ward Stanford, 221-6630. Keep in mind that all modes of travel must be analyzed, not just vehicles. 14. The Street Oversizing Fee will be based on square footage of the dwelling units. The City also collects the Larimer County Road Impact Fee. Please contact Matt Baker, 970-221-6605, for an estimate of these fees which are payable at the time of building permit issuance. Please note that fees are adjusted annually based on the Denver -Boulder consumer price index and that there may be increases in 2004 independent of the C.P.I. (There Is Information on the Street Oversizing Fee on the City's web site at www.fcaov.com.) 15. The access to the site should be along the west property line in accordance with the Harmony Road Access Control Plan. This would allow for future joint access with the abutting property owner to the west thus reducing the number of individual driveways intersecting with a state highway/major arterial street. For further information regarding access, please contact David Averill, Transportation Planner, 416-2643. 16. The City and CDOT are presently in the process of transferring jurisdiction of Harmony Road from the State to the City. In the City, the roadway is classified as a major arterial street. This means there would ultimately be three lanes of traffic in each direction. Development of this parcel may have to dedicate additional right-of-way and utility easements for this roadway classification. It is unknown at this time whether a right -turn lane will be needed to serve the property. For further Information, please contact Marc Virala, Development Review Engineer, 221-6605. • • August10,2005 Mr. Dan Billmark Accessible Space, Inc. 2550 University Avenue, Suite 330N St. Paul, MN 55114 Dear Dan: For your information, attached is a copy of the Staffs comments for a Accessible Space, Inc. — Three Story Apartment Building on Harmony Road which was presented before the Conceptual Review Team on August 8, 2005. The comments are offered by staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 970-221-6750. Sincerely, Ted Shepard Chief Planner ITEM: Accessible Space, Inc. — Three Story Apartment Building on Harmony Road MEETING DATE: August 8, 2005 • APPLICANT: Accessible Space, Inc., Go Mr. Dan Billmark, 2550 University Avenue, Suite 330N, St. Paul, MN. 55114. LAND USE DATA: Request to develop the Glass/Keenan property, located on the south side of Harmony Road between College Avenue and Hogan Drive. The apartment building would be three -stories in height and contain 23 dwelling units. Each unit would be barrier free for persons with physical disabilities. Accessible Space, Inc. is a private non-profit corporation that participates in the Federal Housing and Urban Development Department's Section 811 program. COMMENTS: 1. The parcel is zoned H-C, Harmony Corridor and located in the 'Basic Industrial Non -Retail Employment Activity Center' as per the Harmony Corridor Plan. According to the Plan, the property is allowed to contain 100% secondary uses due to the small size of the parcel. 2. Multi -family is a permitted secondary use subject to review by the • Planning and Zoning Board. The building must be setback from Harmony Road by a minimum distance of 30 feet. Both the interior and perimeter of the parking lot must be landscaped. 3. The minimum residential parking standards can be modified based on documentation from other existing projects that there are fewer drivers associated with this type of project than a project that does not target this specific population. 4. The Trash enclosures must be constructed to match the predominant material of the building and be sufficiently sized for containers for Project Development Subtal • Planning Objectives and Response to Conceptual Review Notes Fort Collins Supportive Housing — Fort Collins. Colorado 2/23/2007 Page 3 of 3 CrIA r1'!Al -}- sP F A . O/o 19. The adjacent property owner to the east,is in agreement with the configuration of sidewalk access across their site and east to Hogan. A letter of intent is being prepared for their signature. 20, Utility coordination meetings have been held and agency input has been incorporated into the submittal documents. 21. We understand that a Capital Expansion Fee will be collected based on the size of the units. 22. No response needed. 23. Native species of plantings have been selected for use in the development. 24. Existing significant trees, where possible given the constraints of grading, drainage, and utility improvements, will be preserved. It may be possible to preserve trees adjacent to Harmony provided they do not hinders}€elines or if preservation becomes impractical due to surrounding improvements. At this point, it is assumed all existing trees in the area of site improvements will be removed. 25. Site improvements are not proposed within the 100-foot natural habitat buffer zone from Mail Creek. 26. No response needed. 27. No response needed. 28. Dialogue with Fairway Estates Homeowner's Association has been ongoing. 29. A neighborhood information meeting has been held. We believe the proposed plan addresses the neighbor's major concerns with regard to nuisance lighting, noise, views, parking, and shadows. a. Building was relocated north and a variance is sought to reduce the front yard setback by approximately 10 feet in order to provide the maximum amount of visibility for neighbors to Horsetooth Rock. See the attached diagram prepared from GPS data of the neighbor's property and Horsetooth Rock. b. Parking is reduced to a ratio of just over 1:1. c. Landscape shrub screening is proposed to discourage occupants from wandering down to Mail Creek and to screen properties from vehicle lights. d. Noise will be improved with placement of the proposed building up against Harmony Road and by locating the access drive on the west side of the site. e. Shadows will not significantly affect the adjacent residential property except during very late in the day in summer. See the attached shadow study. WRITTEN AND ISSUED BY: DISTYLE DESIGN, P.C. Michael D. Knisely, Principal Project Development Submittal • Planning Objectives and Response to Conceptual Review Notes Fort Collins Supportive Housing — Fort Collins. Colorado 2/23/2007 Page 2 of 3 !'' 10 "'A a n y . # -.2 2. We seek a variance from the 30-foot setback in order to provide additional, undeveloped area south of the building and increase visibility for neighbors of natural landscape features off to the west (Horsetooth Rock). 3. The developer has an historical base of nearly 118 similar housing projects across the country. Their experience shows that due to the nature of the occupants and their disabilities, parking needs for supportive housing developments do not exceed a ratio of 1 space per dwelling unit. Typically, only about 40 percent of the occupants will hold a driver's license. and even fewer will own a vehicle. The vast majority of the residents will avail themselves of alternative public and private modes of transportation. 4. There are no trash enclosures. Rubbish and recyclables are collected internally and dumpsters are rolled out from within the building and returned once trash is collected by the hauler. 5. Walkways are proposed to connect the building entrance to Harmony Road and east to Hogan. 6. Electrical utilities are assumed to be fed from the south side of Harmony. The transformer is located just off the north east corner of the building. 7. See Item No.6. 8. Coordination will take place with Fort Collins Loveland Water District and south Fort Collins Sanitation District. 9. Poudre Fire Authority has reviewed the proposed design and has provided input on the location and layout of fire hydrant, water service, and the fire access lane through the site. The building will be fully fire sprinklered. 10. Drainage and erosion control documents are included in the submittal. 11. Onsite extended detention is proposed to treat water runoff. 12. We understand the property will need to be platted. 13. A Transportation Impact Study will be submitted under a separate cover. 14. We understand there will be Street Oversizing and Road Impact Fees assessed for this development. 15. Access to the site is provided along the west property line and will be shared with the property to the west. Letters of intent are being prepared and signatures obtained for the requisite easements. 16. Right of way dedication has been coordinated with the Development Review Engineer and shown on the submittal documents. 17. We understand that existing sidewalks, curbs, and gutters that are damaged or in disrepair must be replaced or repaired prior to issuance of a Certificate of Occupancy. 18. We understand that a development agreement will be required. and that construction may not begin until planning documents, development agreement, and utility plans have been signed and recorded. ❑ 1 S T Y L E D E S 1 G N Project Development Submittal Planning Objectives and Response to Conceptual Review Notes Project: Fort Collins Supportive Housing Fort Collins. Colorado Project No.: 05.11.04 Date: February 23, 2007 Property Data: Glass/Keenan property located on the south side of Harmony Road between College Avenue and Hogan Drive, consisting of 1.96 acres exclusive of proposed Harmony Road Right of Way. PLANNING OBJECTIVES: 1. Replatting of subject property, realignment of existing easements to be retained, and elimination of obsolete easements. 2. Approval to develop, as designed, a 3-story, 23-dwelling unit apartment building for exclusive use by low income persons with disabilities in accordance with U.S. Department of Housing and Urban Development (HUD) Section 811 criteria. 3. Approval of shared access off Harmony Road and dedicated fire access lane as designed. 4. Approval for parking as designed at just over a ratio of 1 space per dwelling unit. 5. Approval of grading and drainage, landscaping, pedestrian access, and utilities as indicated on the accompanying Documents. 6. Acceptance of the Traffic Impact Memorandum and approval of traffic right -turn lane to accommodate the proposed development. 7. Approval of a 10-foot variance in building setback from the required 30 feet to the proposed 20 feet. CONCEPTUAL PLAN REVIEW COMMENTS: Item numbers reference Conceptual Plan Review Comments Dated August 8. 2005. 1. We understand that this site is allowed to contain 100% secondary uses, which includes multifamily housing. 620 Mendelssohn Ave. N.. Suite 116 Golden Valley, Minnesota 55427 www. d i styled es i gn.com T [7631 591.0996 1 [7631 591.0964 F