Harmony Technology Park - Phase 1
CONCEPTUAL SITE PLAN
V. .....
OF BFARING
i
Harmony Technology Park — Phase One Office Building
MAVDevelopment
20 November 2007
Design Team:
Developer — MAVDevelopment, Mark Melchi
Architect — Humphries Poli Architects, Joe Poli
Landscape Architect — BHA Design, Angela Milewski
Civil Engineer — Stantec, Jim Allen -Morley
Proiect Description
The current proposal includes a four-story 75,000 gross rentable s.f. office building
to be constructed near the southeast corner of the intersection of Harmony Road and
Technology Parkway. A second building of the same size is currently contemplated to
be built adjacent to the first phase with a common courtyard. The buildings will be
constructed in two separate phases.
This is an initial phase of the development of the remaining Harmony Technology Park
development; envisioned as a corporate campus including office, research and
technology, flex -office and related uses. The location of these initial office buildings
has been carefully considered to create a signature architectural statement along
Harmony Road.
An approved development plan and plat currently exists for this site with vesting still in
place. The market for the larger -sized office buildings contemplated at the time of the
design has shifted, so smaller office buildings are now being proposed in this location.
-r"iF
A change in the alignment of Timberwood Driv rs also being considered. If elected,
we would expect this change would require a Vmendment to the approved ODP for
the site. This change would not affect the vehicular or pedestrian circulation for this
first phase building.
Questions/Discussion Items:
1. Buildings are planned as virtually identical office buildings with shared
common pedestrian space and outdoor amenities between them. How can we
identify amenities to help us meet the requirements of Section 4.26.E.3.b. CAM? us
2. Since approved plans are in place for this site, what process will be required for tdel
review of these changes to the site and architecture? /1 i^'ox• � M Ar/L
3. We have shown expected roadway improvements required for Phase One.
�� b . What expectations are there for other infrastructure improvements needed with
this initial phase? (i.e. off -site road improvements, utitilities, pedestrian
connections, etc)
4. Will signal at Harmony/Technology Parkway be allowed/required immediately
with construction of Technology Parkway?