Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 4TH FILING - PDP/FDP - 07-08/A - CORRESPONDENCE -has completed several successful projects. Please contact Gary Schroeder, 221-6395, for further information. 29. Please be aware that at the time of building permit issuance, the project will be assessed the capital improvement expansion fee. This fee is typically adjusted on an annual basis. For further information, please contact Felix Lee, 221-6750. 30. Bicycle parking is required near customer entrances. Racks must be permanently anchored to concrete and not interfere with pedestrian walkways. Enhanced crosswalks are required in the parking at areas of high pedestrian traffic. 19. Vacating the western segment of Timberwood Drive requires an Ordinance and two readings by City Council. 20. An Amended Transportation Impact Study will be required. This analysis will help determine the timing of the installation of a new traffic signal at Harmony and Technology. This new signal will be constructed only when sufficient warrants are met. For example, in the short term, traffic to Phase One could be routed east to Lady Moon Avenue to take advantage of the existing signal. Please contact Ward Stanford, 221-6820, to scope the magnitude of this Amended T.I.S. 21. A Minor Amendment submittal will require a revised Utility Plan and an Amended Development Agreement. A revised Phasing Plan would-be helpful as well. 22. Staff prefers that a replat be considered versus vacating and dedicating rights -of -way and easements by separate instrument. Please note that each separate legal document that needs recording carries a $250.00 fee for processing. 23. A replat requires a Type One hearing, including posting the property and mailing notices to affected property owners. 24. Please check with Matt Baker, 221-6605, Street Oversizing Fund Administrator, regarding any repays that may be due for improvements to the Harmony Road and Ziegler Road, including the intersection. 25. At the time of building permit issuance, the project will be assessed the City's Street Oversizing Fee and the County's Road Impact Fee. These fees are based on square footage and land use. Usually, these fees are raised annually based on the Denver -Boulder consumer price index. For an estimate of these fees, please contact Matt Baker. 26. For further information on civil engineering issues, please contact Randy Maizland, 221-6605. 27. _ Regarding the Amended Transportation Impact Study, please be sure to address Levels of Service for bicycles, pedestrians, and transit. Staff supports the connecting walkway from Phase Two to Harmony Road via the proposed campus between the two buildings. For further information regarding alternative modes, please contact Denise Weston, 416-2643. 28. The applicant is encouraged to take advantage of the design assistance for energy conservation offered by the Fort Collins Utilities. This is a voluntary program and referred to as the Integrated Design Process which D. Extended detention is required for water quality treatment to be designed and incorporated into the water quantity portion of the detention pond. E. The design of this site must conform to the drainage basin design of the McClellands Creek Master Drainage Plan as well the City's Design Criteria and Construction standards. F. The city wide new development fee is $3,070/acrre ($0.0705/sq.ft.) for new imperviousness over 350 square feet. No fee is charged for existing impervious area. This fee is to be paid at the time each building permit is issued. G. In .the McClellands drainage basin onsite detention is required with a 0.2 cfs/ac release rate for the 10 year storm and a 0.5 cfs/ac release rate for the 100 year storm. H. A drainage and erosion control report and construction plans are required and are to be prepared by a Professional Engineer registered in Colorado. For further information, please contact Basil Hamdan, 221-6700. 14. Full public street improvements will be required along the property's frontage along eastbound Harmony Road with Phase One. This would include the segment between Technology Parkway and Lady Moon Avenue. Such improvements include the detached eight -foot wide meandering sidewalk. 15. In addition, a design of the ultimate three -lane cross-section would be needed to make sure that development of both Phase One and Two will be coordinated with future long term improvements. 16. Any improvement beyond the local street portion will be reimbursed by the Street Oversizing Fund upon completion and inspection. 17. Technology Parkway would have to be fully improved for at least the segment along the frontage of the subject site. Offsite improvements, such as extending Technology Parkway south to Timberwood, may be required in order to gain a second point of access for the Poudre Fire Authority. Again, any improvement beyond the local street portion is reimbursable. 18. The access to Phase One may have to shift to the south to avoid conflicts with the northbound left turn lane. I. Address Numerals Address numerals shall be visible from the street fronting the property, and posted with a minimum of six-inch (6) numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). NOTE: Access to the buildings is from Technology Parkway; therefore, address numerals will be off Technology Parkway. Please refer to section 97UFC 901.4.4. For further information, please contact Carie Dann, 221-6570. 12. Water and Wastewater: Existing mains: 12-inch water main in Technology Pkwy, 16inch water main at Lady Moon Drive and Timberwood Drive. A. Extend a 16-inch water main in Timberwood Drive from Technology Pkwy to the east end of the pavement constructed with the initial phase of the project.. If Timberwood is re -aligned, the water main routing originally approved will need to be re-evaluated and likely revised. B. Sewer -in this area will be provided by the South Fort Collins Sanitation District. At present, the nearest sewer is located in Lady Moon at the future intersection with Timberwood Drive. C. Schedule meeting with City Water/Wastewater Utilities and the FCLWD/SFCSD to work out details of water and wastewater service and the possible re -alignment of Timberwood. D. Development fees and water rights due at building permit. For further information, please contact Roger Buffington, 221-6700. 13. Stormwater: A. Outfall for this site is through an existing pipe system installed in Lady Moon Drive by the neighboring development to the east. A private agreement between the owner of that development and the previous owner of this site may already exist for the installation costs of that system. B. A public drainage easement will be required from the point of outfall from this site to the point of tie in to the existing storm sewer system in Lady Moon drive. C. The site is part of a larger overall development. An overall drainage plan setting overall detention requirements and release rates should be prepared. A phasing plan showing how and when detention facilities will be built should be provided. ` access or as otherwise approved by the fire code official. If possible, a fire hydrant shall be located within 100 feet of the FDC. PFA Bureau Policy E. Knox Box Required Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 97UFC 902.4; PFA BUREAU POLICY 88-20 F. Stairwell Signage Approved stairwell identification signs shall be posted at each floor level in all enclosed stairways in buildings four or more stories in height. 97UFC1210.4 and Appendix I-C G. Required Access A fire lane may be required. A fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: 0 Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. 0 Have appropriate maintenance agreements that.are legally binding and enforceable. 0 Be designated on the plat as an Emergency Access Easement. 0 Maintain the required minimum width of 20 feet throughout the length of the fire lane. If a fire lane cannot be provided, the building shall be fire sprinklered. Please refer to 97UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1. H. Tuning Radii Minimum turning radii for emergency apparatus on streets and drives is 25 feet inside, 50 feet outside. from the public streets by landscaping or by an enclosure that provides the minimum clearance specifications. 10. Any change to the existing system will be at the developer's expense. Public street lighting may already be installed. Be sure that shade trees are kept at least 40 feet and ornamental trees 15 feet away from street lights. For further information regarding electrical service, please call Alan Rutz, 221-6700. 11. The site will be served by the Poudre Fire Authority. Please note the following: A. Water Supply Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: Commercial, 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter; residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter; residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. Please refer to section 97UFC 901.2.2.2. B. Sprinkler Requirements The proposed building(s) shall be equipped with an approved, automatic fire -sprinkler system. C. Standpipes and Fire Pump Buildings four or more stories in height are required to be equipped with firefighting standpipes in every stairwell. The standpipe system must be capable of supplying a minimum 100 psi to the top floor; an approved fire pump may be required to obtain this minimum pressure. Please refer to IFC 905.3.1. D. Fire Department Connection Fire department connections shall be installed remote from the buildings, and located on the street or fire lane side of buildings, -fully visible and recognizable from the street or nearest point of fire department vehicle avail themselves of the Altemative Compliance or Exception to the General Office Parking Standard which allow for the maximum number of parking spaces to be determined on a customized basis for the particular needs of a specific end -user. 4. Please be aware that Section 3.2.2(E)(6) large parking lots be divided into smaller sections such that no one section exceeds 200 spaces. 5. Also, Section 3.2.1(E)(5) requires that for parking lots that exceed 100 spaces, there shall be no less than 10% of the interior devoted to landscaped islands. 6. Regarding Section 4.26(E)(3)(b) — Campus Exception — Staff would support the combination of Phase One and Phase Two buildings creating an internal campus versus requiring Phase Two to comply with the build -to line requirements. Please be aware, however, that amenities and features that comprise the campus will be carefully scrutinized to ensure compliance with both the spirit and letter of the regulation. There are both good (Hewlett-Packard/Avago) examples and bad examples (Natural Resources Research Center) of office projects located within a campus setting. Please pay very close attention to the degree to which large parking fields are brought up close to building entrances. A campus setting typically calls for parking fields to be distributed around the perimeter of the two buildings so that plazas, courtyards, green space, walkways, fountains, benches, planters and the like can be concentrated to form a cohesive sense of place not penetrated by vehicles. This space should connect the buildings for the benefit of the pedestrian, not parking lots. The campus layout must demonstrate that the vehicle parking is subordinate to creating a vital pedestrian environment. - 7. In accordance with the Harmony Corridor Plan, the 80-foot setback from Harmony Road must include undulating berms with particular attention paid to proper screening of parking lots. 8. As with the original Harmony Technology Park, the Amended P.D.P. will continue to be served electrical power by the City of Fort Collins. Existing system is installed along all public streets. Normal development charges will apply. A Commercial One ("C-1") Form will be required to be completed by a licensed electrical contractor to determine the load and panel size. 9. The size and location of the transformer will need to be evaluated. It is usually most efficient if a single transformer can be designed to serve both buildings. The location of a new transformer must be coordinated with Light and Power such that it is within ten feet of hard surface for emergency change -out. The transformers must be screened from view CONCEPTUAL REVIEW STAFF COMMENTS of Fort ITEM: Harmony Technology Park Amended Project Development Plan, Buildings A and B. MEETING DATE: November 26, 2007 APPLICANT: MAVD Development Company c/o Mrs. Angie Milewski, B.H.A. Design, 1603 Oak Ridge Drive, Fort Collins, CO 80525 LAND USE DATA: Request to amend the northerly portion of Harmony Technology Park (Building A) in order to accommodate two new office buildings that would contain a different mix of uses and less square footage than what is presently approved. Each multi -story building would contain approximately 75,000 square feet. The exact nature of the tenant mix has not been determined at this time. Interior floor area will be designed to be flexibly arranged to accommodate a wide range of potential users. The applicant may seek L.E.E.D certification at the Gold level. A re -alignment of Timberwood Drive to the south is proposed. The site is located at the southeast corner of Harmony Road and Technology Parkway. The parcel contains approximately seven acres. COMMENTS: 1. The site is zoned H-C, Harmony Corridor which permits a mix of office and light industrial uses as primary uses. 2. Since the proposed use is roughly equivalent to that which is approved, the Amended Project Development Plan may be processed as a Minor Amendment. Any replatting, however, must be processed as an Administrative (Type One) review. 3. Parking for general office is regulated such that there can be no more than three spaces per 1,000 square feet of gross floor area, or .75 space per employee on the largest shift, or 4.5 spaces per 1,000 square feet if all additional parking spaces gained by the increased ratio (over 3/1,000 sq. ft.) are contained within a parking garage/structure. Please note that for labor intensive uses, such as call centers and the like, applicants may COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT Plannin` 3evelopment and Transportati, Services Planning and Zoning City of Fort Collins November 30, 2007 Mrs. Angie Milewski BHA Design, Inc. 1603 Oak Ridge Drive Fort Collins, CO 80525 Dear Angie: For your information, attached is a copy of the Staffs comments for Harmony Technology Park Amended Project Development Plan which was presented before the Conceptual Review Team on November 26, 2007. The comments are offered by staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 970-221-6750. Sinc 7Zerely, L_ Jtcf� Ted Shepard Chief Planner cc: Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020