Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 4TH FILING - PDP/FDP - 07-08/A - CORRESPONDENCE - (7)Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard City Planner Page 4 Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: landscape plan Number: 36 Created: 7/15/2008 [7/15/081 Provide 6 feet minimum separation between trees and water service/fire lines. Response: Please see BHA response. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 40 Created: 7/17/2008 [7/17/08] Please provide a drainage easement for the storm sewers highlighted on the redlines. Drainage easements are normally required when conveyance elements are necessary to carry the design flows. Roof drain laterals and piping are not required to be in a drainage easement. Response: A 20' easement has been added to the plat in the location requested. Number:41 - Created: 7/17/2008 [7/17/08] Please provide a conveyance mechanism other than the sidewalk itself for the sidewalk along Harmony Road. The area of concern is highlighted on the redlines. When the sidewalk carries flows, ponding and icing on the sidewalk have been a problem in the past. Response: A swale has been provided to carry flow next to the sidewalk. A representative cross section detail has been added to the grading plan as well. Number: 42 Created: 7/17/2008 [7/17/08] Please provide a signature block of approval for the owner of the irrigation line that is being modified. Response: We will not be adding the signature block to the plans but instead will have a signed agreement between the ditch user and the owner to allow modifications to the irrigation ditch. A copy of -the agreement will be provided when available. Number: 43 Created: 7/17/2008 [7/17/08] Please provide 8 to 10 feet of separation between trees and storm sewer. See redlined landscape plan. Response: Please see BHA response. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 34 Created: 7/15/2008 [7/15/08] City utility maps show the water main stub extending east of Tech Pkwy as 12- inch rather than 8-inch? Do you have other information showing 8-inch? Response: The plans have been modified to represent the existing 12" water line. Number: 35 Created: 7/15/2008 [7/15/08] If the water line extending north from Timberwood will ever have domestic services connecting to it, it should be looped now for water quality purposes. Response: This water line will not have any services connected to it. In the future a separate line will be constructed with a closed loop for new tenants. Page 3 1. Boundary and legal close. 2. Minor line over text issues on site plan and plat. 3. Harmony Road is no longer a state highway. 4. Who owns and maintains Tract A? Response: Stantec was informed by Engineering Dept there are no additional comments from Technical Services. Number: 31 Created: 7/14/2008 [7/14/08] The plat creates a sign easement which would theoretically be dedicated to the City. A sign easement shouldn't be dedicated to the City as it has no public benefit. The utility providers may object to the overlapping of a private sign easement with a public utility easement. Response: The sign easement has been removed from the plat and plans. Topic: Utility plan Number: 32 Created: 7/14/2008 [7/14/08] The private 24" irrigation pipe would not normally be allowed in Harmony Road right-of-way without an encroachment permit issuance. What is the use of the pipe/irrigation system? Response: The 24" irrigation pipe will be used to convey irrigation water from the existing irrigation pipe and structure to the earthen ditch. The existing concrete ditch section will need to be removed and a pipe constructed to accommodate the construction of the 8' public sidewalk. Number: 33 Created: 7/14/2008 [7/14/08] Evidence of permission from Intel to do work on their property should be provided prior to final sign off on the drawings... Response: The Owner is working with Intel to secure a letter of agreement for work on Intel property. A copy of this agreement will be provided as it becomes available. Number: 39 Created: 7/16/2008 [7/16/081 Have turning templates been done for verification that the median nose at Technology and Timberwood doesn't hamper turning movements onto the site or turning movements from Intel to Technology? Please provide an exhibit for our records. Response: Turning templates have been complete and exhibits have been sent to Mark Virata on 7/18/2008. Turning templates were also sent to Intel and approved. Department: Light & Power Issue Contact: Doug Martine Topic: Utility plan Number: 2 Created: 4/8/2008 [7/2/08] The C-1 form has been received. Coordinating a location for the electric transformer is still required. Response: The location for the transformer has been confirmed. It is off the northeast corner of the building. The size of transformer has also increased. Please review Utility Plan sheet for location.. [4/8/08] The developer will need to provide Light & Power Engineering with a completed Commercial Service (C-1) form outlining the electric needs of the building. A location for a transformer, and the electric development charges will also need to be coordinated with Light & Power Engineering (221-6700). Page 2 ma STAFF PROJECT REVIEW �(,Q _/7N°J Angela Milewski G A&A /''t VA aAIV Date: 7/28/2008 BHA Design 1603 Oakridge Dr Ft Collins, CO 80525 Staff has reviewed your submittal for HARMONY TECHNOLOGY PARK, 4TH FILING - TYPE I AND FINAL PLAN, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: General Number: 13 Created: 5/2/2008 [7/15/08] Carried over for reference. [5/2/08] The portion of Timberwood Drive not being built at this time fronting the development and Pond 101 would need to be obligated for at this time. The details of this will need to be worked out. I do need to verify with the City Engineer that not having this roadway built at this time is acceptable, as we've relooked at the concept of postponing construction of roads after some issues on other projects that have taken place. Response: Please let us know if this is acceptable not to construct the portion of roadway. The turnaround will allow for pavement to limit of lot boundary. Also need to determine if Owner obligation would be for sidewalk or full road section. Limit of Owner obligation will need to be defined for Development Agreement. Number: 14 Created: 5/2/2008 [7/15/08] Carried over for reference. [5/2/08] The developer's portion of Technology Parkway fronting Pond 101 would need to be obligated for at this time. Like Tlmberwood Drive, the details on this need to be worked out and verified. Response: Noted. Please see response for No. 13. Limit of Owner obligation will need to be defined for Development Agreement. Number: 37 Created: 7/16/2008 [7/15/08] As a heads -up Engineering staff has begun the process to coordinate the elements of analyzing local street portion obligations for Harmony Road as well as design costs for Harmony Road which would be funded by the applicant for the property's frontage along Hamrony Road. Response: Number: 38 Created: 7/16/2008 [7/16/081 Comments may be forthcoming from Engineering Inspection, who will be taking a look at the plans as well. Response: Stantec was informed by Engineering Dept there are no additional comments from Engineering Inspection. Topic: Plat Number: 22 Created: 5/2/2008 [7/18/08] Technical Services will be folling up with comments. [5/2/08] Technical Services has the following comments: Pay*e 1