HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 4TH FILING - PDP/FDP - 07-08/A - CORRESPONDENCE - (6)Number: 43 Created: 7/17/2008
[7/17/08] Please provide 8 to 10 feet of separation between trees and storm sewer. See
redlined landscape plan.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 34 Created: 7/15/2008
[7/15/08] City utility maps show the waater main stub extending east of Tech Pkwy as 12-
inch rather than 8-inch? Do you have other information showing 8-inch?
Number: 35 Created: 7/15/2008
[7/15/08] If the water line extending north from Timberwood will ever have domestic
services connecting to it, it should be looped now for water quality purposes.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Ted Shepard
City Planner
Page 3
utility providers may object to the overlapping of a private sign easement with a public utility
easement.
Topic: Utility plan
Number: 32 Created: 7/14/2008
[7/14/08] The private 24" irrigation pipe would not normally be allowed in Harmony Road
right-of-way without an encroachment permit issuance. What is the use of the pipe/irrigation
system?
Number: 33 Created: 7/14/2008
[7/14/08] Evidence of permission from Intel to do work on their property should be provided
prior to final sign off on the drawings.
Number: 39 Created: 7/16/2008
[7/16/08] Have turning templates been done for verification that the median nose at
Technology and Timberwood doesn't hamper turning movements onto the site or turning
movements from Intel to Technology? Please provide an exhibit for our records.
Department: Light & Power Issue Contact: Doug Martine
Topic: Utility plan
Number: 2 Created: 4/8/2008
[7/2/08] The C-1 form has been received. Coordinating a location for the electric
transformer is still required.
[4/8/08] The developer will need to provide Light & Power Engineering with a completed
Commercial Service (C-1) form outlining the electric needs of the building. A location for a
transformer, and the electric development charges will also need to be coordinated with
Light & Power Engineering (221-6700).
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: landscape plan
Number: 36 Created: 7/15/2008
[7/15/08] Provide 6 feet minimum separation between trees and water service/fire lines.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 40 Created: 7/17/2008
[7/17/08] Please provide a drainage easement for the storm sewers highlighted on the
redlines. Drainage easements are normally required when conveyance elements are
necessary to carry the design flows. Roof drain laterals and piping are not required to be in
a drainage easement.
Number: 41 Created: 7/17/2008
[7/17/08] Please provide a conveyance mechanism other than the sidewalk itself for the
sidewalk along Harmony Road. The area of concern is highlighted on the redlines. When
the sidewalk carries flows, ponding and icing on the sidewalk have been a problem in the
past.
Number: 42 Created: 7/17/2008
[7/17/08] Please provide a signature block of approval for the owner of the irrigation line
that is being modified.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Angela Milewski Date: 7/28/2008
BHA Design
1603 Oakridge Dr
Ft Collins, CO 80525
Staff has reviewed your submittal for HARMONY TECHNOLOGY PARK, 4TH FILING -
TYPE I AND FINAL PLAN, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 13 Created: 5/2/2008
[7/15/08] Carried over for reference.
[5/2/08] The portion of Timberwood Drive not being built at this time fronting the
development and Pond 101 would need to be obligated for at this time. The details of this
will need to be worked out. I do need to verify with the City Engineer that not having this
roadway built at this time is acceptable, as we've relooked at the concept of postponing
construction of roads after some issues on other projects that have taken place.
Number: 14 Created: 5/2/2008
[7/15/08] Carried over for reference.
[5/2/08] The developer's portion of Technology Parkway fronting Pond 101 would need to
be obligated for at this time. Like Tlmberwood Drive, the details on this need to be worked
out and verified.
Number: 37 Created: 7/16/2008
[7/15/08] As a heads -up Engineering staff has begun the process to coordinate the
elements of analyzing local street portion obligations for Harmony Road as well as design
costs for Harmony Road which would be funded by the applicant for the property's frontage
along Hamrony Road.
Number: 38 Created: 7/16/2008
[7/16/08] Comments may be forthcoming from Engineering Inspection, who will be taking a
look at the plans as well.
Topic: Plat
Number: 22 Created: 5/2/2008
[7/18/08] Technical Services will be foiling up with comments.
[5/2/08] Technical Services has the following comments:
1. Boundary and legal close.
2. Minor line over text issues on site plan and plat.
3. Harmony Road is no longer a state highway.
4. Who owns and maintains Tract A?
Number: 31 Created: 7/14/2008
[7/14/08] The plat creates a sign easement which would theoretically be dedicated to the
City. A sign easement shouldn't be dedicated to the City as it has no public benefit. The
Page 1