Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 4TH FILING - PDP/FDP - 07-08/A - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW26. For further information on civil engineering issues, please contact Randy Maizland, 221-6605. Response: Sheri Langenberger has been the point of 4r- contact for Harmony Road improvements. 27. Regarding the Amended Transportation Impact Study, please be sure to address Levels of Service for bicycles, pedestrians, and transit. Staff supports the connecting walkway from Phase Two to Harmony Road via the proposed campus between the two buildings. For further information regarding alternative modes, please contact Denise Weston, 416-2643. Response: Noted. 28. The applicant is encouraged to take advantage of the design assistance for energy conservation offered by the Fort Collins Utilities. This is a voluntary program and referred to as the Integrated Design Process which has completed several successful projects. Please contact Gary Schroeder, 221- 6395, for further information. Response: Noted. 29. Please be aware that at the time of building permit issuance, the project will be assessed the capital improvement expansion fee. This fee is typically adjusted on an annual basis. For further information, please contact Felix Lee, 221-6750. Response: Noted. 30. Bicycle parking is required near customer entrances. Racks must be permanently anchored to concrete and not interfere with pedestrian walkways. Enhanced crosswalks are required in the parking at areas of high pedestrian traffic. Response: Bicycle parking has been provided near the main entrance and the secondary staff entrance. We look forward to your comments. Please let me know if you have any questions or need additional information. Sincerely, BHA Design, Inc. Angela K. ilewski Z any improvement beyond the local street portion is reimbursable. Response: Noted. PFA has reviewed the site plan for access conditions. 4w- 18. The access to Phase One may have to shift to the south to avoid conflicts with the northbound left turn lane. Response: Turn lane can be accommodated. 19. Vacating the western segment of Timberwood Drive requires an Ordinance and two readings by City Council, Response: Noted. 20. An Amended Transportation Impact Study will be required. This analysis will help determine the timing of the installation of a new traffic signal at Harmony and Technology. This new signal will be constructed only when sufficient warrants are met. For example, in the short term, traffic to Phase One could be routed east to Lady Moon Avenue to take advantage of the existing signal. Please contact Ward Stanford, 221-6820, to scope the magnitude of this Amended T.I.S. Response: An Amended TIS has been included with the submittal for review. 21. A Minor Amendment submittal will require a revised Utility Plan and an Amended Development Agreement. A revised Phasing Plan would be helpful as well. Response: Revised utility plans and phasing plans have been included. An amended Development Agreement is expected. 22. Staff prefers that a replat be considered versus vacating and dedicating rights - of -way and easements by separate instrument. Please note that each separate legal document that needs recording carries a $250.00 fee for processing. Response: We have included a replat of a portion of Lot 1 to vacated existing easements and dedicate new easements. 23. A replat requires a Type One hearing, including posting the property and. mailing notices to affected property owners. Response: Noted. 24. Please check with Matt Baker, 221-6605, Street Oversizing Fund Administrator, regarding any repays that may be due for improvements to the Harmony Road and Ziegler Road, including the intersection. Response: Matt Baker has been contacted. 25. At the time of building permit issuance, the project will be assessed the City's Street Oversizing Fee and the County's Road Impact Fee. These fees are based on square footage and land use. Usually, these fees are raised annually based on the Denver -Boulder consumer price index. For an estimate of these fees, please contact Matt Baker. Response: Noted. M. D. Extended detention is required for water quality treatment to be designed and incorporated into the water quantity portion of the detention pond. Response: WQCV is provided. E. The design of this site must conform to the drainage basin design of the McClellands Creek Master Drainage Plan as well the City's Design Criteria and Construction standards. Response: Done. F. The city wide new development fee is $3,070/acre ($0.0705/sq.ft.) for new imperviousness over 350 square feet. No fee is charged for existing impervious area. This fee is to be paid at the time each building permit is issued. Response: Noted. G. In the McClellands drainage basin onsite detention is required with a 0.2 cfs/ac release rate for the 10 year storm and a 0.5 cfs/ac release rate for the 100 year storm. Response: Design will comply with release rates. H. A drainage and erosion control report and construction plans are required and are to be prepared by a Professional Engineer registered in Colorado. For further information, please contact Basil Harridan, 221-6700. Response: Done. 14. Full public street improvements will be required along the property's frontage along eastbound Harmony Road with Phase One. This would include the segment between Technology Parkway and Lady Moon Avenue. Such improvements include the detached eight -foot wide meandering sidewalk. Response: Roadway Improvement Plans will be submitted as a seperate plan set March 21, 2008. The sidewalk will be constructed as part of the HTP Fourth Filing. 15. In addition, a design of the ultimate three -lane cross-section would be needed to make sure that development of both Phase One and Two will be coordinated with future long term improvements. Response: Ultimate design of Harmony has been submitted and reviewed by City Stoff. 16. Any improvement beyond the local street portion will be reimbursed by the Street Oversizing Fund upon completion and inspection. Response: Noted. 17. Technology Parkway would have to be fully improved for at least the segment along the frontage of the subject site. Offsite improvements, such as extending Technology Parkway south to Timbenvood, may be required in order to gain a second point of access for the Poudre Fire Authority. Again, 7 A. Extend a 16-inch water main in Timberwood Drive from Technology Pkwy to the east end of the pavement constructed with the initial phase 4w- of the project.. If Timberwood is re -aligned, the water main routing originally approved will need to be re-evaluated and likely revised. Response: 76" water main is proposed connecting from Lady Moon Drive through the future realigned Timberwood Dr. to Technology Parkway. B. Sewer in this area will be provided by the South Fort Collins Sanitation District. At present, the nearest sewer is located in Lady Moon at the future intersection with Timberwood Drive. Response: Sewer application and plans will be routed to FCLWD/SFCSD. C. Schedule meeting with City Water/Wastewater Utilities and the FCLWD/SFCSD to work out details of water and wastewater service and the possible re -alignment of Timberwood. Response: Our civil engineer has met with these entities to develop the utility design. D. Development fees and water rights due at building permit. For further information, please contact Roger Buffington, 221-6700. 13. Stormwater: A. Outfall for this site is through an existing pipe system installed in Lady Moon Drive by the neighboring development to the east. A private agreement between the owner of that development and the previous owner of this site may already exist for the installation costs of that system. Response: A storm outfall will connect to an existing storm pipe within the platted ROW of Technology Pkwy. B. A public drainage easement will be required from the point of outfall from this site to the point of tie in to the existing storm sewer system in Lady Moon drive. Response: See above. C. The site is part of a larger overall development. An overall drainage plan setting overall detention requirements and release rates should be prepared. A phasing plan showing how and when detention facilities will be built should be provided. Response: An overall Master Drainage Report has been prepared for the entire site. An individual report will be submitted for each development. C 1 G. Required Access 4V_ A fire lane may be required. A fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: 0 Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. 0 Have appropriate maintenance agreements that are legally binding and enforceable. 0 Be designated on the plat as an Emergency Access Easement. 0 Maintain the required minimum width of 20 feet throughout the length of the fire lane. If a fire lane cannot be provided, the building shall be fire sprinklered. Please refer to 97UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1. H. Tuning Radii Minimum turning radii for emergency apparatus on streets and drives is 25 feet inside, 50 feet outside. Response: The fire access allows for 25' inside and 50, outside radii. I. Address Numerals Address numerals shall be visible from the street fronting the property, and posted with a minimum of six-inch (6) numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). NOTE: Access to the buildings is from Technology Parkway; therefore, address numerals will be off Technology Parkway. Please refer to section 97UFC 901.4.4. For further information, please contact Cane Dann, 221-6570. Response: Noted. Building permit drawings will indicate address numerals. 12. Water and Wastewater: Existing mains: 12-inch water main in Technology Pkwy, 16inch water main at Lady Moon Drive and Timberwood Drive. 5 C These requirements may be modified if buildings are equipped with automatic 4v- fire sprinkler systems. Please refer to section 97UFC 901 .2.2.2. Response: Water service is to be provided by City of Fort Collins with fire by PFA. Hydrant spacing criteria noted and the building will be sprinklered. B. Sprinkler Requirements The proposed building(s) shall be equipped with an approved, automatic fire sprinkler system. Response: The building will be sprinklered. C. Standpipes and Fire Pump Buildings four or more stories in height are required to be equipped with firefighting standpipes in every stairwell. The standpipe system must be capable of supplying a minimum 100 psi to the top floor; an approved fire pump may be required to obtain this minimum pressure. Please refer to IFC 905.3.1. Response: Noted. D. Fire Department Connection Fire department connections shall be installed remote from the buildings, and located on the street or fire lane side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire code official. If possible, a fire hydrant shall be located within 100 feet of the FDC. PFA Bureau Policy Response: The FDC location will be determined as building mechanical design is finalized. E. Knox Box Required Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 97UFC 902.4; PFA BUREAU POLICY 88-20 Response: Noted. Building permit drawings will include this feature. F. Stairwell Signage Approved stairwell identification signs shall be posted at each floor level in all enclosed stairways in buildings four or more stories in height. 97UFC1210.4 and Appendix I-C Response: The building is sprinklered. A 20' wide fire access path is provided through the parking lot. An emergency access easement will be provided as required by PFA. EI 7. In accordance with the Harmony Corridor Plan, the 80-foot setback from 40- Harmony Road must include undulating berms with particular attention paid to proper screening of parking lots. Response: Noted. The proposed landscape and berming has been indicated on the plans. 8. As with the original Harmony Technology Park, the Amended P.D.P. will continue to be served electrical power by the City of Fort Collins. Existing system is installed along all public streets. Normal development charges will apply. A Commercial One ("C-1 ") Form will be required to be completed by a licensed electrical contractor to determine the load and panel size. Response: A C-I form has been completed and submitted with this submittal to assist with transformer sizing. 9. The size and location of the transformer will need to be evaluated. It is usually most efficient if a single transformer can be designed to serve both buildings. The location of a new transformer must be coordinated with Light and Power such that it is within ten feet of hard surface for emergency change -out. The transformers must be screened from view from the public streets by landscaping or by an enclosure that provides the minimum clearance specifications. Response: The transformer has been indicated on the east end of the building on the site plan. 10. Any change to the existing system will be at the developer's expense. Public street lighting may already be installed. Be sure that shade trees are kept at least 40 feet and ornamental trees 15 feet away from street lights. For further information regarding electrical service, please call Alan Rutz, 221-6700. Response: Noted. 1 1 . The site will be served by the Poudre Fire Authority. Please note the following: A. Water Supply Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: Commercial, 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter; residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800- foot centers thereafter; residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. 3 1 • This site is intended to be the initial phase of a two -building office campus. It is bounded on two sides by streets that do not allow on -street parking (Harmony Road and Technology Parkway). The Land Use Code allows for an increase of the parking ratio by 20% if on -street or shared parking is not available. We are requesting a ratio that equates a 16% increase since on -street parking is severely limited for this site. • A portion of our parking is proposed as temporary parking. It is located where the future second building is planned, so will be removed when that building is constructed. Since our increased parking ratio occurs in this temporary condition, we will have the opportunity to revisit the parking needs for both buildings as a campus when the second building is reviewed in the future by the City. At that time, we'll have known tenants with known parking needs, and can adjust the overall parking ratios for both buildings as a campus based on these specific needs. 4. Please be aware that Section 3.2.2(E)(6) large parking lots be divided into smaller sections such that no one section exceeds 200 spaces. Response: Noted. We've developed the parking lots to ,meet this standard. 5. Also, Section 3.2.1(E)(5) requires that for parking lots that exceed 100 spaces, there shall be no less than 10% of the interior devoted to landscaped islands. Response: Noted. 6. Regarding Section 4.26(E)(3)(b) — Campus Exception — Staff would support the combination of Phase One and Phase Two buildings creating an internal campus versus requiring Phase Two to comply with the build -to line requirements. Please be aware, however, that amenities and features that comprise the campus will be carefully scrutinized to ensure compliance with both the spirit and letter of the regulation. There are both good (Hewlett- Packard/Avago) examples and bad examples (Natural Resources Research Center) of office projects located within a campus setting. Please pay very close attention to the degree to which Large parking fields are brought up close to building entrances. A campus setting typically calls for parking fields to be distributed around the perimeter of the two buildings so that plazas, courtyards, green space, walkways, fountains, benches, planters and the like can be concentrated to form a cohesive sense of place not penetrated by vehicles. This space should connect the buildings for the benefit of the pedestrian, not parking lots. The campus layout must demonstrate that the vehicle parking is subordinate to creating a vital pedestrian environment. Response: We have developed the two -building campus to include an active central pedestrian courtyard which will be shared by both buildings when the second building is designed and constructed in the future. The entire courtyard space as shown would be developed with the initial building. Parking is located at the perimeter of the campus. 2 4V_ BHA Design Incorporated 1603 Oakridge Drive Fort Collins. CO 80525 March 18, 2008 Mr. Ted Shepard Current Planning City of Fort Collins 281 North College Avenue Fort Collins, CO 80521 / I j4 V O- 0 FFiG6 b(vic. o f nl 6 / 1 Wort, AM �.o. Dear Ted, AE1'4A7- We are pleased to submit the Minor Amendment documents for your review for the Harmony Technology Park Fourth Filing MAVD Office Building project in Harmony Technology Park. The following are responses to the Conceptual Review comments: The site is zoned H-C, Harmony Corridor which permits a mix of office and light industrial uses as primary uses. Response: Noted. 2. Since the proposed use is roughly equivalent to that which is approved, the Amended Project Development Plan may be processed as a Minor Amendment. Any replotting, however, must be processed as an Administrative (Type One) review. Response: Noted. A Replat of a portion of Lot 1 is included with this minor amendment submittal. 3. Parking for general office is regulated such that there can be no more than three spaces per 1,000 square feet of gross floor area, or .75 space per employee on the largest shift, or 4.5 spaces per 1,000 square feet if all additional parking spaces gained by the increased ratio (over 3/1,000 sq. ft.) are contained within a parking garage/structure. Please note that for labor intensive uses, such as call centers and the like, applicants may avail themselves of the Alternative Compliance or Exception to the General Office Parking Standard which allow for the maximum number of parking spaces to be determined on a customized basis for the particular needs of a specific end -user. Response: The proposed use is office with the actual tenants yet to be determined. While we do not yet have a specific end -user, given the type of office building proposed and its location on Harmony Road, we expect the tenant mix to include professionals, consultants, service providers and technical service and design. In general these uses can and have required more parking than the standard office ratio of 3 spaces per 1,000 s.f. Adequate parking is an important factor for attracting tenants. As a result, we would like to request a ratio equal to 3.5 spaces per 1,000 s.f. for this initial building based on the following justifications: landscape architecture I planning J urban design voices 970.223.7577 fax 970.223.1827 www.bhadesign.com