HomeMy WebLinkAboutSTORYBOOK THIRD FILING - PDP - PDP130021 - CORRESPONDENCE -Comment Number: 7 . omment Originated: 07/12/2013
07/12/2013: If the Plat is to be filed, please change the name to something other than 2nd
Filing. This name is already taken.
Response: Noted. See above.
Comment Number: 8 Comment Originated: 07/12/2013
07/12/2013: Please add "Being a replat of..." to the subtitle, since this property is already
platted. See redlines.
Response: Noted and added.
Comment Number: 9 Comment Originated: 07/12/2013
07/12/2013. Once we know that there is to be a replat, we will do a thorough review of the Plat.
Response: Noted
Topic: Site Plan
Comment Number: 10
Comment Originated: 07/12/2013
07/12/2013: Site/Landscape Plans:
Please correct all of the easements on sheet 1 to match
the Subdivision Plat. See redlines.
Response: Noted and revised.
Comment Number: 11
Comment Originated: 07/12/2013
07/1212013, Site/Landscape Plans:
Please rotate the marked text 180 degrees to read from the
right side of the sheet. See redlines.
Response: Noted and revised.
Comment Number: 12
Comment Originated: 07/12/2013
07/12/2013. Site/Landscape Plans:
Please change the title to "Storybook 2nd Filing" on all
sheets. See redlines.
Response: Noted, the project has
been renamed "Storybook 3'd Filing".
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals a( fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/03/2013
07/03/2013: Need to place two street trees along the North frontage of LOT 68.
Need to place two street trees along the South frontage of LOT 67.
Need to place two street trees along the West frontage of LOT 53.
Response: Street trees have been added to these areas.
Comment Number: 2 Comment Originated: 07/03/2013
07/03/2013: On the site/landscape plan please provide the seed mix for the Dryland seed and
the Bio-filtration seed.
Response: Bio-filtration seed mix has been added to Sheet 2 of the Site/Landscape Plan.
Comment Number: 3 Comment Originated: 07/03/2013
07/03/2013: The plat and site label the tract in the north east corner as two different things.
Response: Tract has been removed
Contact: Wes Lamarque, v10-416.2418, wlamarguena.fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 07/18/2013
07/18/2013: Please, to the extent reasonably feasible, re -grade the area of Phase 3 to avoid
the condition of 3 or more lots draining i nother.
Response: These lots have been r r accordingly.
Comment Number: 3 u,P Comment Originated: 07/18/2013
07/18/2013: At final, detailed design will be reviewed of all the bio-swales that are proposed
for this development.
Response: Noted
Comment Number: 4 Comment Originated: 07/18/2013
07/18/2013: Please include the ditch company's allowable release rate into their ditch for this
development in the drainage report after a decision is made.
Response: Noted
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountyCa)fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 07/12/2013
07/12/2013: Please change the title to "Storybook 2nd Filing" on all sheets. See redlines.
Response: Project has been renamed to Storybook 3ro Filing,
Comment Number: 2 Comment Originated: 07/12/2013
07/12/2013: Can the text & linework be sharpened up on all sheets? See redlines.
Response: This linework is from pdf's. I made them as high quality as I could. I'll see if a different
printer helps.
Comment Number: 3 Comment Originated: 07/12/2013
07/12/2013: There are line over text issues on sheets 2 & 3. See redlines.
Response: Noted and fixed.
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 07/12/2013
07/12/2013: Please change the index on sheet 1 to match the titles shown on each sheet. See
redlines.
Response: Noted and fixed.
Comment Number: 5 Comment Originated: 07/12/2013
07/12/2013: There are line over text issues on several sheets. See redlines.
Response: Noted and fixed.
Topic: Plat
Comment Number: 6 Comment Originated: 07/12/2013
07/12/2013: Why does this project need to replat? Storybook 2nd Filing is already filed and
did not expire with the development plans.
Response: There are slight modifications in this plat. It has been renamed to Storybook 3rd Filing.
Department: Light And Pu._,;r
Contact: Justin Fields, 970-224-6150, ifields(7o fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/27/2013
06/27/2013: The electric system has been installed except on Sherwood Forest Ct. and a
section of Deep Woods Ln. Any modification of the existing system will incur additional
charges.
Response: Noted.
Comment Number: 2 Comment Originated: 06/27/2013
06/27/2013: Electric development charges will apply for any areas not previously paid for.
Contact Light and Power Engineering, 970-221-6700, for an estimate of these charges.
Response: Noted.
Comment Number: 3 Comment Originated: 06/27/2013
06/27/2013: The developer will need to coordinate the location of any new electric services
with Light and Power Engineering due to conflicts with shared drives and other utilities.
Response: Noted.
Comment Number: 4 Comment Originated: 06/28/2013
06/28/2013. Shade trees need to maintain 40 feet of clearance with street lights and ornamental
trees need to maintain 15 feet of clearance with street lights.
Response: Clearances have been met and notes have been added to the General Notes.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(o)poudre fire.org
Topic: General
Comment Number: 1 Comment Originated: 07/11/2013
07/11/2013: All prior fire department concerns have been addressed. No further comment.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 07/17/2013
07/17/2013: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3.
Current Erosion Control Materials Submitted does not meet requirements. Please submit;
Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ ischlam cbfcQov.com
Response: Erosion Control plan has been included in the resubmittal.
Specify the Littleleaf Linden as Greenspire Littleleaf Linden.
Street trees are labeled as QUMA on both sides of Deep Wood Lane. QUMA is not in the plant
list. It is assumed that these are intended to be Bur Oak which would be a good choice for this
location.
Response: Street tree suggestions have been incorporated into the design.
Comment Number: 3 Comment Originated: 07/18/2013
07/18/2013: Please add these two notes in place of General Note number 2.
• A permit must be obtained from the City forester before any trees or shrubs as noted on
this plan are planted, pruned or removed on the public right-of-way. This includes zones
between the sidewalk and curb, medians and other city property. This permit shall approve the
location and species to be planted. Failure to obtain this permit may result in replacing or
relocating trees and a hold on certificate of occupancy.
• The developer shall contact the City Forester to inspect all street tree plantings at the
completion of each phase of the development. All trees need to have been installed as shown
on the landscape plan. Approval of street tree planting is required before final approval of
each phase. Failure to obtain approval by the City Forester for street trees in a phase shall
result in a hold on certificate of occupancy for future phases of the development.
Response: Notes have been added to the General Notes section.
Comment Number: 4
Comment Originated: 07/18/2013
07/18/2013: Please add these additional separations in General Note number 3. Provide
street tree locations that meet these separation standards.
Forty feet between shade trees and street lights
15 feet between ornamental trees and street lights
Eight feet from driveways
Twenty feet between trees and traffic control signs
Response: Notes have been added to the General Notes section.
Comment Number: 5
07/18/2013:
Please add this General Note.
Comment Originated: 07/18/2013
All street tree planting shall be the responsibility of the developer for planting. Actual planting
of Street Trees shall be a qualified landscape contractor.
Response: Note have been added to the General Notes section.
Comment Numucr: 9 omment Originated: 07/24/2013
07/24/2013: Please provide some additional detail on how the north side of Mountain Vista will
be constructed and how it will tie to the existing asphalt.
Response: Details on the construction of the north side of Mountain Vista has been provided.
Topic: Plat
Comment Number: 2 Comment Originated: 07/24/2013
07/24/2013: At the staff review it was indicated that the applicant wanted to replat. Please name
this plat differently than Storybook 2nd Filing and adjust the name on the utility plans
accordingly
Response: The project has been renamed to Storybook 3rd Filing.
Contact: Sheri Langenberger, 970-221-6573, slangenbergero�fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/08/2013
07/08/2013. the project owes an additional $960 for the Transportation Development Review
Fees (TDRF) for the PDP application.
Response: Additional fees due have been included in the resubmittal.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex a(Dfcgov.com
Topic: General
Comment Number: 1
07/16/2013: No comments.
Comment Originated: 07/16/2013
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(cDfcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 07/18/2013
07/18/2013:
Provide actual quantities of trees shrubs and other landscape plants in the plant schedule.
Response: Noted and added.
Comment Number: 2 Comment Originated: 07/18/2013
07/18/2011
Requested street trees species adjustments and clarification as follows.
Use Sentry American Linden in place of Texas Red Oak.
Use Skyline Honeylocust in place of Shademaster Honeylocust.
Use Bur Oak along Monte Vista in place of Chinkapin Oak and also use Bur Oak in place of the
Little leaf Linden shown in the parkway along Monte Vista.
Comment Number: 6 uumment Originated: 07/23/2013
07/23/2013: Was it mentioned that the access potential between Lots 62 and 63 is to be
deleted due to concerns by the Poudre School District? If so, please elaborate as to the
justification for this neighborhood connection to be removed. If not, please retain and describe
the extent of this improvement and what it ties into.
Response: The current plan is to build the connection as shown. It was our understanding that the City
was the driver behind keeping this connection to Bar Harbor Drive, even though the future school did not
need it. This drive could be removed and another 55' wide lot put in its place, which would be the
preferred option.. Z' M 'i ftk * N 4 C? V *J X w A ti
I40ouy Pr
Department: Engineering Development Review N �T A' ST N �r
Contact: Andrew Gingerich, 970-221-6603, agingerich(dUcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 07/24/2013
07/24/2013: Since the project will be replatted as a separate project name the 2nd filing plans
can be reduced in size and become a standalone plan set. It is not necessary to show
existing road profiles, sanitary, water profiles, etc. if they have already been built and no other
work is to occur from those sheets.
Response: Noted
Comment Number: 4 Comment Originated: 07/24/2013
07/24/2013: Please update all pertinent details to current Elco and City of Fort Collins standard
details.
Response: Details have been updated.
Comment Number: 5 Comment Originated: 07/24/2013
07/24/2013: Since the project will be replatted we will want to enter into anew development
agreement specific for this project.
Response: Noted
Comment Number: 6 Comment Originated: 07/24/2013
07/24/2013. As discussed previously money will need to be collected for the portions of
Chesapeake that are not constructed.
Response: Noted
Comment Number: 7 Comment Originated: 07/24/2013
07/24/2013: Please confirm that existing grades shown for street tie-ins are appropriately
shown per as -built shots.
Response: Existing grades are shown.
Comment Number: 8 Comment Originated: 07/24/2013
07/24/2013: It is the understanding that the applicant proposes to construct the north side of
Mountain Vista Drive for the portion adjacent to their frontage. Final design plan and profiles for
centerline and flowlines will need to be provided. The plans for the 2nd filing was only a future
preliminary design that was shown. Per our Master Street Plan this road should be designed
as a 2-lane arterial. Special attention should be paid to how this sidewalk for this portion will tie
to the existing sidewalk just west of this frontage.
Response: Plan and profiles have been provided.
4.
n
Comment Number! 3, Comment Originated: 07/23/2013
07/23/2013: With o encing, what are the opportunities to buffer the back yards being only
20 feet away from a collector roadway that, according to the Master Street Plan, will extend for
about 1.5 miles? And that within these 20 feet is a drainage swale?
Given the fact that Lots 63 through 75 are essentially double -frontage lots, has any consideration
been given to providing some additional buffering to mitigate traffic noise, headlight glare and
public roadway lighting? Will rear yard landscaping be the responsibility of each individual
homeowner? Or will common landscaping be installed to establish some plant maturity prior to
construction of Bar Harbor Drive? Lots 67 and 68 look particularly vulnerable due to the proximity
of the future Bar Harbor / Chesapeake intersection.
Staff recommends that in addition to the call out for an eight -foot wide utility and drainage
S
easement, additional width be dedicated for a buffer from future Bar Harbor Drive and that the
t
sleo`off
extent of the buffer be shown on the Landscape Plan. r Jr r PC r" vej ? f �'
>E7
0
Response: A letter from the school districtwill be provided stating their desire to not have any landscape
improvements on the edge of their property that abuts the Storybook subdivision. Rear yard landscape
Al
improvements shall be the responsibility of the homeowner, however, as displayed on the Typical Lot
(55' Lot), the rear yard will have ample room to provide landscape screening on the homeowners property.
This project comes with intense water issues as appropriate water shares had not been dedicated to the
C� VHF
various common areas, or the offsite park. Priorities have been taken to provide turf in the tree lawns,
-V JN
provide as much turf in the park as possible, and to make sure there is enough accent planting in the park
�� tj
and entry drive to beautify the project. This amount of landscape comes with a significant price tag as we
p��f
0
are having to buy water shares from other entities.
Sit`
THE CoJT III
1 f N 4 r I! ('rw-'e .% o r
Providing planting along the eastern edge of the property adds to this hardship. Additional planting would
\
need to be offset by the reduction of plantings in other areas of the project so that the budget for water
purchases can still be met. --yE P n A, K 1 s )e d R, 4 c
L A"'o v ,re
.n 0
Comment Number: 4 Comment Originated: 07/23/2013
� d r
1 �'�
07/23/2013: On both the Plat and Site Plan, please enhance the vicinity maps so that the name
and full alignment per the Master Street Plan for future Bar Harbor Drive is clearly labeled and
depicted.
Response: Bar Harbor Drive has been added to the vicinity maps.
Comment Number: 5 Comment Originated: 07/23/2013
07/23/2013: As you are aware, Section 3.5.2(F) requires that garages be recessed behind the
front building line and that garage doors not exceed 50% of the ground floor building line.
These requirements must be factored in with the specifications on the site plan referring to
building setbacks and the tree separation requirements from water and sewer lines. With all of
these requirements, please provide Lot Typicals (interior and corner lots, wide and narrow lots)
so all the parameters can be graphically illustrated.
Response: Lot Typicals have been added to Sheet 2 of the Site/Landscape Plan.
Fort Collins
July 25, 2013
Michael Mcbride
BHA Design
1603 Oakridge Dr.
Fort Collins, CO 80525
i
RE: Storybook 2nd Filing, PDP130021, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/deve/opmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard(&fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 07/23/2013
07/2312013: Please clearly label the ownership of the surrounding vacant land. For example,
please specify who owns the "20' offsite drainage easement?" Also, please label the future
public collector street, 76-feet of right-of-way as the future extension of Bar Harbor Drive per the
City's Master Street Plan. Please correct the plat designation so it states "Poudre School
District" as there is no longer an"R-1." And, please state that this area is intended for future
development for public schools.
Response: Adjacent property ownership information has been added.
Comment Number: 2
Comment Originated: 07/23/2013
07/23/2013: Staff is concerned about the treatment of the eastern edge of the project along the
rear property lines of Lots 63-76. Contained within these lots is the easterly eight feet
easement for utilities and drainage. Then, behind these property lines will be a 20-foot wide
drainage easement followed by a public minor collector street on 76 feet of right-of-way. Since
the rear eight feet of these lots are encumbered by a drainage easement, this will require that
any rear yard fencing be open so as to allow water to pass. Please provide a specification for
this open fence including the type and gauge of wire for those seeking a dog enclosure.
Response: Open fence detail has been provided on Sheet 2 of the Site/Landscape Plan.