Loading...
HomeMy WebLinkAboutSTORYBOOK THIRD FILING - PDP - PDP130021 - REPORTS - CORRESPONDENCE-HEARINGJul, 16, 2013 2:45PM 11QIJ1)Rlt 1 C;,hl f)t71. l)151"tIC`r July 16, 2013 Ted Shepard, Chief Planner City of Fort Collins — Current Alarming 281 North College Avenue Fort Collins, CO 80524 Subject: Storybook2"d Filing Review Comments Dear Ted: No, 0654 P. 2 I've been reviewing the comment sheets for this project dated April 29, 2013, and would like to add a few from the District: The applicant has been working with the District to address the off -site retention pond as stated under the Stolinwater Engineering comment #3. This requirement was part of the original sale agreement for the school site. It is also my understanding that the new Low Lnpact Development (LID) requirements may have an effect on the 20' off -site drainage easement between our adjoining properties. Some form of long-term maintenance agreement needs to be considered for both the drainage easement and retention pond. The City Master Street plan still shows a 2-lane collector street running north/south between our properties. This future right-of-way needs to be coordinated with the drainage easement, retention pond location, as well as the Chesapeake Drive extension. The access and utility easement between lots 61 and 62 may be restricted in the future due to security reasons. At this time, the District has not identified the use of this portion of the property, or age -group of children in this area. With the extension of Tittle John Lane to the north, and Chesapeake Drive to the east, I would suggest that the "access" portion of this easement be deleted. • Asper District standard, gates from individual lots will not be allowed direct access to. District property. Should you ]rave any questions, please call me at 490-3412. Sincerely, Poudre School Dish•ict 4+00,1h� Ed Holder Planning, Design, & Construction