HomeMy WebLinkAboutMELDRUM OFFICE BUILDING - PDP - PDP130027 - REPORTS - RECOMMENDATION/REPORTMeldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 10 .
7. Findings of Fact/Conclusion
In evaluating Meldrum Office Building (111 S. Meldrum), #PDP130027, Staff makes the
following findings of fact:
A. The request for a modification of standard to permit the use of composite panel
material in modules larger than 3 feet by 5 feet is not detrimental to the public
good and will promote the general purpose of the standard equal to or better than
if it complied with the section 4.16(D)(5)(e). This is because the material does not
detract from the architectural interest of the building and continues to promote a
sense of human scale and pedestrian -oriented character.
B. The PDP contains permitted uses and complies with the applicable land
development standards of the Community Commercial District in accordance
with Article 4 of the Land Use Code with the exception of the requested
modification of standard.
C. The PDP complies with the applicable General Development Standards of Article
3 of the Land Use Code.
D. The PDP complies with the applicable procedural and administrative
requirements of Article 2 of the Land Use Code.
RECOMMENDATION:
Staff recommends approval of Meldrum Office Building (111 S. Meldrum), #PDP130027
ATTACHMENTS:
1. Site and Landscape Plan
2. Architectural Elevations
3. Color Perspectives
4. Shadow Study
5. Material Modification Request
6. Lighting Plan and Alternative Compliance Request
7. Bike Parking Alternative Compliance Request
8. Project Narrative
9. Neighborhood Meeting Notes 8-14-13
10. Public Comments
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 9
Building Heights Map
-{ Height Limits
F-1 +1-150 feat, 10 - 12 stones
r -�- +1- 115 feel, 7 - 9 stories
• - - -4■>r mar ■n r.
+1.85 feel, 5.6 stories
�•_ y _ - 3 - d 5 - b +1- 45 feet. 3 - 4 stones
_ o , - 45 85 = Note On blocks vuth multiple height
Gents, lines convey generst building
_ z ' MAPLE si massing concepts, not exact dimensions.
z L_ - 1 I, -
Civic Center 9 Canyon
Avenue Sub•Districts
$8OawrZone Districts
•fin x
LCl2's ' 1 5 - 6 (1 I - f xl�
W. 85T. R i T Gtj
�1 ..
—'--•—�—• —•--•. - `MO&WAINAVE EMOUNTAIN AVE
jj If
10-12
85 W 150 _ t
OAK ST L L)-%K sr - - - - -
w I o
105.�!_, 6-2�W1�gS-6 WMAGNOLIAST
_ F - MAGNOLIA
NOLIIAI ST�rp I
--�p.
97
6C1
3-4
-1 r
�4�
} - • eMAiWWRRY$F
In
Canyon Avenue?Civic Center Subdistricts
Height Limits Map
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 8
6. Downtown Strategic Plan
The Framework Diagram in Downtown Strategic Plan identifies this block as a transition
area. Transition areas are discussed in the following sections:
• Principle 2: Utilize the energy from the core to leverage and attract new development
in the infill/transition area.
o 2.1.1 The west side Infill/Transition Area presents the best opportunity to support
the core with redevelopment in the short term, and should be the primary focus of
attention and effort to support redevelopment.
o 2.2.1. Continue to allow taller buildings (more than 3 stories), to support the
market recommendations for redevelopment in the Infill/Transition Area, and to
reinforce downtown as the primary focal point of Fort Collins from a community
appearance and design standpoint.
o 2.2.2. Acknowledge that taller buildings affect various interests differently, with
both positive and negative effects; and set standards for scale and careful design
so that negative effects are considered and mitigated (e.g., changes to historic
character, quality of life in nearby neighborhoods, sunshine patterns in adjacent
spaces, views, and large existing trees).
• Principle 3: Blend the Downtown retail/entertainment district with adjacent
neighborhoods.
o 3.1.1. Protect the character of existing residential neighborhoods from insensitive
redevelopment by requiring careful attention to neighborhood scale, housing
types, and historic integrity.
o 3.2.1 The Infill/Transition Areas — West Side, East Side, and Downtown River
Corridor - will have their own distinctive character and identity.
o 3.2.2 Carefully locate and shape taller buildings (4-12 stories) in the westside
Infill/Transition Area to respond to defining characteristics of the surrounding
context. (The surrounding context includes both existing and emerging
characteristics that are consistent with adopted plans.)
This section informed the update to the Land Use Code and directly transferred the
following map from the Downtown Strategic Plan into the Land Use Code:
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 7
a. Relationship of Buildings to Streets, Walkways, and Parking. The main
entrance of the building faces directly onto the public sidewalk.
b. Variation in Massing. The proposed building provides both vertical and
horizontal variation throughout the building. Where there are changes in
material, the building articulates, thereby breaking the building mass up
into modules (see perspective renderings).
c. Character and Image. The proposed building provides a variety of high -
quality materials utilizing traditional building material such as brick and
stone. The design provides interest and wall articulation along connecting
walkways at intervals more frequent than the required 30 feet.
4. Development Standards for the Transit -Oriented Development (TOD) Overlay
Zone [Division 3.101
The standards contained in the TOD Overlay Zone are not applicable as they pertain to
properties south of Prospect Road and to projects including parking structures.
5. Modification of Standards [Division 2.8]
A. Canyon Avenue and Civic Center: Exterior fagade materials [4.16(D)(5)(e)]
The applicant is requesting a modification to the standard that requires the
following material to be used for the full height of a building in the Canyon
Avenue Subdistrict of the Downtown District in modules not to exceed 5 feet
horizontally and 3 feet vertically: stone, brick, clay units, terra cotta, architectural
pre -cast concrete, cast stone, prefabricated brick panels, architectural metals or
any combination thereof.
The applicant proposes to use a composite building material not included on the
list of acceptable materials, and that is configured in excess of the maximum
allowable module dimensions. The material is a high -quality durable cement
composite with panel sizes of 4 feet by 8 feet. This material is principally applied
to the upper three stories of the building where there is less need for architectural
interest created by material and texture because it is so far from the pedestrian
level. The material has a smooth finish and is proposed in a few tones of gray.
Larger panels and the gray tones will help the upper stories appear less prominent
and to visually recede.
Staff concurs with the applicant that the use of composite panel material in
modules larger than 3 feet by 5 feet is not detrimental to the public good and will
promote the general purpose of the standard equal to or better than other approved
building materials configured in compliance with Section 4.16(1))(5)(e). This is
because the materials do not detract from the architectural interest of the building
and promote a sense of human scale and pedestrian -oriented character.
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 6
beyond the street curb line. The light spill over is due to the
encroachment of the canopy entry feature which is subject to
approval of a ROW encroachment permit. Please see the applicant's
alternative compliance request letter attached.
Staff finds that the proposal for alternative compliance accomplishes
the purposes of Section 3.2.4 equally well or better than would a
lighting plan which complies with the standards of the section.
Proposed lighting complies with previously mentioned review
criteria, in that the site is not nearby a natural area, it enhances
neighborhood continuity and connectivity, fosters non -vehicular
access by providing softly lit sidewalks and plaza space for
pedestrians, and demonstrates innovative design by lowering light
intensity by reflecting it off trees and building walls.
B. Building Standards [Division 3.5]
1) Building and Project Compatibility [Section 3.5.11
Architectural Character, Building Size, Mass and Scale, Building Materials,
Building Color, and Building Height Review [Section 3.5 (B), (C), (E), (F),
and (G)] — The proposed building is taller by three stories than the existing
commercial building to the north. Facades are broken into distinct modules
that help reduce the perceived size. The base consists of the first floor and the
entry feature that is three stories tall. The middle section is three and four
stories of masonry which creates a pronounced principal element that is
similar in size to the existing building to the north. The top section is set back
and consists of a color (gray) and material (large module composite panels)
that helps to reduce the perceived building mass and bulk. Across the alley to
the west are single-family houses. The proposed building is setback from the
20 foot wide alley by a 65 foot deep parking lot. The top story on the rear side
is setback 29 feet from the face of the building helping to reduce the overall
perceived size.
Buildings exceeding 40 feet in height are subject to additional review to
maintain desirable views from public spaces, to mitigate substantial adverse
impacts of shadowing, and ensure privacy and compatibility with
neighborhood scale. The applicant has provided a view study that shows the
proposed development does not substantially alter the opportunity for
desirable views of the mountains from public places (see attached). The
applicant has also provided a shadow study showing that the proposed
building does not adversely affect the surrounding properties by casting
shadows that would preclude the functional use of solar energy technology.
2) Mixed -Use, Institutional, and Commercial Buildings [Section 3.5.3]
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 5
primarily along Meldrum Street and Canyon Avenue, of which an
estimated 7-10% use alternative modes to get to work. They presently
provide 302 private parking spaces within the immediate area, with the
closest parking being 65 leased spaces in the Key Bank lot on the
northwest corner of Meldrum and Oak. Further, Blue Ocean and the
City of Fort Collins are discussing partnership opportunities for a new
parking structure in the Meldrum Street area (such as the one that was
presented in the neighborhood meeting) in order to absorb the growing
parking needs within this area of Downtown.
b. Site Lighting: [Section 3.2.4] The applicant is proposing an Alternative
Compliance (3.2.4(E) request for the method of site lighting. Proposed
lighting includes fixtures that are up -cast (fixtures DD, KK, & HH) and
the light projected 20 feet beyond the property line exceeds 0.1 foot
candles. Section 3.2.4(D)(3) requires light sources to be fully shielded
and minimize up -light to avoid unnecessary diffusion on adjacent
property.
Alternative Compliance: (3.2.4(E) The proposed alternative
compliance is considered based on the "extent to which the proposed
design protects natural areas from light intrusion enhances
neighborhood continuity and connectivity, fosters non -vehicular
access, and demonstrates innovative design and use of fixtures or
other elements."
City Staff and the applicant agree that the basic format of a
photometric plan does not provide the detail necessary to "tell the
story" of site lighting because it measures foot-candles on a single
plane, the ground.
The alternative compliance proposal compares this site with the
Otterbox Headquarters (209 S. Meldrum) because it uses the same
fixtures. City Staff met the applicant on -site to inspect the lighting to
address two different purposes: light levels that will promote public
safety, and protect adjacent properties from adverse glare impacts.
Site inspection showed that, taken as a whole, fixtures cast a soft light
that is pleasant and bright enough to see another person anywhere on
the site. The up -casting fixtures (DD) shine on the trees and create an
ambient light that does not seem to adversely encroach onto adjacent
properties. In order to mitigate possible negative impacts, the
applicant is proposing to incorporate honeycomb louvers and glare
shields into the light fixtures. The up -casting fixtures (KK) are
decorative lighting which light the brick wall in a cross form which
does not diffuse off the site due to eve overhangs. The spillover light
beyond the maximum permitted distance of 20 feet does not exceed
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 4
i. Safety Considerations: [Section 3.2.2 (C)(1)] — Pedestrians, bicycles
and vehicles are separated to the maximum extent possible in the
proposed plan. Six parking spaces are proposed inside a private garage
that is accessed from the abutting alley via an access easement through
the parking lot at 417 Mountain Avenue. Easements necessary to
provide legal access to the parking are shown on the plat.
ii. Curb cuts and ramps [Section 3.2.2 (C)(2)] No curb cuts and ramps
are proposed with this application.
iii. Site Amenities and Bicycle Facilities: [Section 3.2.2 (C)(3) and (4)]
Required bicycle parking for this development is as follows: 1 space
per 4,000 square feet [42,000 s.f. / 4,000 = 10.5 spaces] provided at
20% enclosed and 80% fixed.
1. Alternative Compliance: The plan proposes 14 enclosed parking
spaces within the building and 0 fixed spaces. The property to the
north provides 6 fixed bicycle parking spaces and the applicant's
perspective is that the intended use of the building will not
generate bicycle parking demand exceeding the spaces provided.
Please see the attached alternative compliance request. Staff finds
that the proposal for alternative compliance accomplishes the
purposes of Section 3.2.2 equally well or better than would a
bicycle parking plan that complies with the standards.
iv. Walkways: [Section 3.2.2(C)(5)] Walkways within this site directly
and continuously connect pedestrian points of origin and destination.
v. Parking: [Section 3.2.2(K)] Nonresidential uses are limited to a
maximum number of parking spaces. Specifically, office use is
limited to 1 space per 0.75 employee or 3 spaces per 1,000 square feet.
The project is proposing to remove 12 abutting on -street parking
spaces within the ROW in order to expand the landscape parkway for
landscaping and public gathering space. Various City departments,
including Parking Services, Sustainability, Traffic Operations,
Development Review Engineering, Capital Projects, Stormwater, and
Planning, have reviewed the request for removal of the 12 on -street
parking spaces and determined that the number of removed spaces
represents a minimal impact to parking supply when viewed in the
context of the larger district. The City is pursuing a more
comprehensive parking solution to address needs within the
Downtown Canyon Avenue subdistrict. The development is proposing
6 on -site parking spaces in a private parking garage: 5 standard spaces
and 1 handicap and van accessible space. Blue Ocean/Otterbox has
roughly 550 employees spread out through the Downtown area,
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 3
portion of the building by utilizing a strong natural stone base and entry
feature, a middle section of red brick and windows with traditional sills and
lintels, and a top section that steps back in multiple tiers and is constructed
with a high quality composite panel. (See Architectural Elevations and
Perspectives.) Additionally, the applicant has provided shadow and viewshed
studies showing that the building mass does not significantly diminish access
to sunlight, views of the mountains or other historic resources (see attached).
4) Building Character and Facades: Buildings shall not have blank walls that
face a public street exceeding 50 feet in length, be constructed with high
quality materials, and promote outdoor activity with balconies and courtyards.
The building provides high quality material at the pedestrian level including
natural cut stone and steel canopy framing. The streetscape integrates with the
property to the north providing boulders for seating, rain gardens and
landscaping.
D. Site Design Standards: [Section 4.16 (E)]
1) Site Design: Buildings that are four stories or taller must provide an easily
accessible and highly visible public plaza that promotes active and passive
activities. The site has 75 feet of street frontage and has proposed to utilize an
expanded parkway within the right-of-way (by removing the on -street
parking) combined with the property to the north (which the applicant also.
owns) to create a public plaza space to promote passive gathering amongst the
landscaping and stone seating.
3. Compliance with Applicable General Development Standards — Article 3
A. Site Planning and Design Standards [Division 3.2]
1) Landscaping and Tree Protection: [Section 3.2.1] — The Project Development
Plan provides full tree stocking and street trees throughout the project site.
Street trees are shown, where possible, in landscaped parkways. The
applicant is preserving two mature trees in the landscape parkway and is
working with the City Forrester on a tree mitigation plan to compensate for
the removal of 3 trees on the site.
2) Landscape standards (E): All non -paved areas of the site plan are proposed
as landscaped areas including turf, shrubs, flower beds and foundation
plantings (see landscape plan). Detailed planting plans will be provided at
Final Plan.
3) Access, Circulation and Parking [Section 3.2.2]
a. Development Standards [Section 3.2.2 (C)]:
Meldrum Office Building PDP #130027
Administrative Hearing 12-05-2013
Page 2
The surrounding zoning and land uses are as follows:
Direction
Zone District
Existing Land Uses
North
Downtown (D)
Commercial office
South
Downtown (D)
Parking lot
East
Downtown (D)
Parking lot
West
Neighborhood Conservation,
Medium Density (N-C-M)
Single-family residential
2. Compliance with Applicable Downtown (D) District Standards [Division 4.161
A. Purpose: The purpose of the Downtown District is as follows:
The Downtown District is intended to provide a concentration of retail, civic,
office and cultural uses in addition to complementary uses such as hotels,
entertainment and housing. It is divided into three (3) subdistricts as depicted on
Figure 18. The development standards for the Downtown District are intended to
encourage a mix of activity in the area while providing for quality development
that maintains a sense of history, human scale and pedestrian -oriented character.
The proposed project is consistent with the stated purpose of the zone district as
the project proposes a commercial office building with extensive improvements
to the pedestrian environment.
B. Permitted Land Uses: [Section 4.16 (B)] The proposed use of Commercial
Oyice is permitted in this zone district and the Canyon Avenue Sub -district
subject to administrative review by a Hearing Officer (Type 1).
C. Building Standards: [Section 4.16 (D)]
1) Setback from Streets: A landscape setback with unspecified dimensions is
required on all block faces west of Mason Street. The proposed building
provides a landscape setback ranging between 2 and 4 feet.
2) Building Height: The height limit for this block of downtown is 5 — 6 stories
or +/- 85 feet. The proposed building is 6 stories totaling 85 feet in height.
3) Building Mass Reduction for Taller Buildings (over three [3] stories): Taller
buildings are required to provide a clearly defined base portion of one or two
stories with upper floor setbacks. The purpose is to provide a pedestrian -scale
along sidewalks and outdoor spaces, and preserve sunshine patterns and
views. The applicant worked extensively with staff to clearly define a base
arof
t Collins
ITEM NO
MEETING DATE December 5. 2013
STAFF Seth Lorson
ADMINISTRATIVE HEARING
PROJECT: Meldrum Office Building (111 S. Meldrum), #PDP130027
APPLICANT/OWNER: 111 Meldrum LLC (Blue Ocean Enterprises)
416 West Oak Street
Fort Collins, CO 80521
PROJECT DESCRIPTION:
This project proposes to demolish the existing building at 111 S. Meldrum (former Ulrich
Blueprint) and construct a 42,000 square foot, 6-story, commercial office building with 6 parking
spaces inside a garage on the ground level. The project proposes to remove 12 on -street parking
spaces and expand the landscape parkway with rain gardens and landscape features to serve as
informal gathering space from this site to the corner of Meldrum St. and Mountain Ave. The site
is in Downtown District (D), Canyon Avenue Sub -District and the Transit -Oriented
Development (TOD) Overlay Zone. In the Downtown District commercial offices are subject to
review and approval by an Administrative Hearing Officer. The project is requesting one
modification of standard by proposing a non -permitted building material (composite panel)
exceeding a five feet horizontal by three feet vertical module. The rest of the building consists of
brick and natural stone with a steel frame entry feature and canopy.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
The proposed PDP has been reviewed by staff and is in compliance with all applicable Land Use
Code (LUC) standards with the exception of the proposed modification of standard for which
staff is recommending approval based on the finding that the proposal "will promote the general
purpose of the standard for which the modification is requested equally well or better than would
a plan which complies with the standard" (Sec. 2.8.2.).
COMMENTS:
1. Background
The initial development concept for this project included a 450 space, mixed -use parking
structure wrapped in ground floor retail. The parking structure was subsequently dropped from
consideration and is not part of the development application. The applicant presented the initial
office building/mixed-use parking structure concept at the neighborhood meeting, with much of
the public discussion centered on potential traffic and compatibility impacts attributed to the
mixed -use parking structure.
Planning Services 281 N College Ave — PO Box 580 — Fort Collins, CO 80522-0580
fcgov.com/developmentreview/ 970.221.6750