Loading...
HomeMy WebLinkAboutCHOICE CENTER MIXED-USE REDEVELOPMENT - PDP - PDP110006 (15-08) - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY__.. _._.l '�:; if .iui :.i .. LLi'•: fl ll l'il 'J Cit� Fir, CLI Fort Collins 9d Vr w 111r1h. St Colorado Slate Un6v-Prltgree Pelfk m' F= Cri E PrDscev Rd (l. W 3 1 c! Rullana �' �ossGormlr- - Figure 1: Vicinity Map Choice Ce77?er Vulti i.:Ye Redeve1Gpmew Tl a7i.$iJ(irtat%GiZ I�l?1'iQL'i �?ilC'i April 2008 • �•'r•te;r. I N _8 Edore Per:: EL& Engineering, LLC 5=0j Tgvlor Lane Fart Co!lu,s, CO 80528 I. Introduction This transportation impact study addresses the Choice Center Mixed Use project located in Fort Collins, CO. The project is a student housing/retail project being proposed by Capstone Development from Birmingham, Alabama. The site is located off of South College Avenue just south of Prospect Road at the intersection of Spring Park. The site is primarily vacant and is the property that was a mobile home park that was destroyed during the flood of 1997. The remaining portions of the site is in an old strip mall that will be redeveloped., The project entails the construction of apartment units consisting of 1,2 and 3 bedrooms (1000 bedrooms approximately) and three retail buildings. The project will be constructed in 2 phases. Figure 1 on the following page is a vicinity map displaying the location of the project. II. Agency Discussions Discussions with City staff indicated that an full traffic study as described in Chapter 4 of the Lorimer County Urban Area Streets Standards (LCUASS) would be appropriate for this particular development. Staff also requested that an alternative modes analysis be conducted as part of the TIS. Although the peak hours for a student housing oriented development are between 10:OOAM and 3:OOPM, the City requested that standard peak hours be used in the study. There are no immediate or pending projects within the area to consider and background. traffic is assumed to be 1.5% per year. The short-range horizon for the project is the year 2010 and the long range 2028. Appendix A contains the form (Attachment A), which outlines the agreed to scope of the study 1 Choice Center Aladti Use Rederelopntenr ELB Engineering, LLC Transportation lbrtpact StndV 5401 Tmlor Lane April 2008 Fort Collins, CO 80528 List of Figures Figures Page 1. Vicinity Map 2 2. Existing Peak Hour Traffic 5 3. Site Plan 8 4. Trip Distribution 9 5. Site Distributed Traffic 11 6. Year 2010 Background Traffic 13 7. Year 2010 Total Traffic 14 8. Year 2028 Total Traffic 15 9. Multimodal Evaluation Area 21 APPENDIX A_ Base Assumptions/Scoping Form B. Traffic Counts C. HCM Capacity Analysis — Base Condition D. HCM Capacity Analysis — Background E. HCM Capacity Analysis — Year 2010 Total Traffic F. HCM Capacity Analysis — 2028 Total Traffic G. Multi -modal worksheets i® 10 0 00 !1 TABLE OF CONTENTS Page 1 Introduction 1 2. Agency Discussions 1 3. Existing Conditions 3 4. Project Description 7 5. Traffic Projections 12 6. Traffic Analysis 13 7. Improvements 20 8. Multimodal Analysis 21 9. Conclusions 26 List of Tables Table Page 1. LOS Definitions 4 2. Existing Operation 6 3. Trip Generation 9 4. 2010 Background Capacity Analysis 13 5. 2010 Total Traffic Capacity Analysis 17 6. 2028 Total Traffic Capacity Analysis 18 7. Transit Travel Time Comparisons/Analysis 24 Choice Center Multi -Use Redevelopment Transportation hnpact Study Fort Collins, Colorado March 29, 2008 Prepared for: Mr. Walker May Capstone Development 431 Office Park Drive Birmingham, AL 35233 Prepared by: 6` c k� Eric L. Bracke, P.E., P.T.O.E ,`�, 4 5401 Taylor Lane ` Fort Collins, CO 80528 Office:970-988-7551 Faz:970-225-8942 ELBEngineerin g(4,lnbroad band. net :L �. caa• n\.Y HBBngineezig6, L "lam Transportation fngineenng Sol. tions Transportation Impact Study Choice Center Multi -Use Redevelopment Capstone Development Fort Collins, Colorado April 2008