Loading...
HomeMy WebLinkAboutCHOICE CENTER MIXED-USE REDEVELOPMENT - PDP - PDP110006 (15-08) - SUBMITTAL DOCUMENTS - ROUND 1 - MODIFICATION REQUEST• 1. "the plan as submitted will promote the general purpose of the standard for which the modification is requested equally well or better than would a plan which complies with the standard". 2. The requirement for on -street bike lanes would place and unusual and exceptional hardship on the developer. 3. Bikes are prohibited on College Avenue and there are no bike lanes on Prospect Road (from Shields to Timberline). Adding bike lanes to these roadways is neither practical nor feasible. The owners of the project respectfully request the granting of the modification to the standard. Please let me know if additional information is required. ELB Engineering. LLC 5401 Taylor Lane Fort Collins, CO 80528 Phone: 970-988-7551 1 FAX: 970-225-8942 ELBEngineering@lpbroadband. rret 2 � � A �F.LB1vgineering, LLC Transportation Engineenng.SoluHons GVV� Memorandum TO: Ms.. Ann Aspen, City Planner Mr. Steve Olt, Interim Planning Director ?pO•RF��S Denise Weston, Senior Transportation Planner pa Per ee Planning and Zoning Hearing Officer FROM: Eric L. Bracke, P.E., P.T.O.E DATE: August 22, 2008 SUBJECT: Choice Center Development — Request for Modification of the Standard In accordance with Section 2.8.2 of the Fort Collins Land Use Code, the owners of the Choice Center Development Center request a modification of the standard as it pertains to bicycle level of service (LOS). The bicycle LOS standards are found in Part II of the City of Fort Collins Multi -modal Transportation Level of Service Manual. The surrounding street system was evaluated for compliance with the City of Fort Collins bicycle level of service standards. Acceptable LOS for bicycles is considered C. To achieve LOS C, the project must have at least direct access to either north/south or east/west on -street bike lanes. Prospect Road and College Avenue do not have bike lanes as part of their geometries. Bicycles are prohibited on College Avenue and adding bike lanes on these two roadways is outside the realm of this project or even a City Capital project at this time. The bicycle LOS for the project has been calculated at D. However, the project will have excellent connectivity for bikes since the site is located at the intersection of the Spring Creek bicycle trail and the Mason Corridor. The functionality of the bicycle system at this location is outstanding, irregardless of not meeting the standard. Granting of the modification request will not be detrimental to the public good, health, or safety. The following criteria for approving the request: ELB Engineering, LLC 5401 Taylor Lane Fort Collins, CO 80528 Phone: 970-988-7551 1 FAX; 970-225-8942 ELBEngineering@lpbroadband. net