Loading...
HomeMy WebLinkAboutRETREAT AT 1200 PLUM ST. - PDP - 34-08 - DECISION - MINUTES/NOTESAdministrative Public Hearing Sign -In Project: `�� Meeting Location: Date: Am'.-:l PLEASE PRINT CLEARLY Name Address Phone Email f LO, do X�/ S- fT, / ,fv s i 70 - le: "2Y ` ; C s lU - 7TS, �g1ixga� v.���"CewWh 1LfZS /v I/iM1Y. Ilsa /�(/( �!'C*L'C VT' fS`I&N 342-clyz'G Y �'C _w�an(� iPG crhGS.ldw� I C,K HA1�S c r � u . u "c c*ti iN thi N Ayr. ,-c. z.5;z4 q"70 . z z 1. 4155Z WA '!+Of �JenO- Ao, FL So5zs %O '12 -1191 1-, is ^� C l brig' % U,n Y�\wc � L [' L, ZIZ, - U605 aK 1 v(. 03 '- W - (o -7b !(cZS tO P/wl 7 -O;k7 . ii. Front yards facing Bluebell Street (Buildings A and B) at 11 feet iii. Front yards facing Columbine Street (Building C only) at 12 feet 5. The Exception to Section 3.8.16 to permit 4 persons in 38 units is hereby approved. Dated May 7, 2009 per authority granted by S ctions 1.49 and 2.1 of the Land Use Code. Richard Vopez Heari. L ng Officer 17 streetscape in this proposed development places the buildings up to the street and creates a pedestrian realm that forwards the TOD Overlay Zone and CC zoning. Additionally, the criteria for alternative compliance are designed primarily for multifamily, yet the analytical elements are achieved through the incorporation of private courtyards for residents, provision of on -street parking, and strengthening the streetscape. • Section 3.8.16 — Occupancy Limits; Increasing the Number of Persons Allowed (Exception) The Hearing Officer finds that the recreational areas and open space provided for this type of urban development coupled with the fact that 314 parking stalls are provided where none in the TOD Overlay Zone are required satisfies the protections for the adjacent neighborhood. Furthermore, there is not a density limitation in the CC zone district. The Hearing Officer grants the request for an increase in the number of unrelated persons who may reside in individual dwelling units from the allowable 3 persons to 4 persons for 38 units only. The Retreat @ 1200 Plum Street, PDP complies with the land use and development standards of the Division 4.18 CC, Community Commercial District. The Retreat at 1200 Plum Street, PDP is proposed to be on a property that is included in the TOD Overlay Zone. DECISION The Hearing Officer hereby enters the following rulings: 1. The Retreat @ 1200 Plum Street, Project Development Plan - #34- 08 is hereby approved with the following condition: Applicant shall incorporate a base feature and the use of varying material or scoring accents for the Parking Structure. 2. The requested Modification of Standards to Section 3.5.1(1)(1) reducing the Trash Dumpster from 20 feet to 6 feet is hereby approved. 3. The requested Modification of Standards to Section 3.5.2(C)(2) permitting an Alternative Street Facing Fagade is hereby approved. 4. The Alternative Compliance request to Section 3.5.2(D)(2)(a) are hereby approved which will allow: i. Front yards facing Plum Street (Buildings A, B & D) at 6 feet 16 neighborhood. Furthermore, there is not a density limitation in the CC zone district. Therefore, staff recommends that the Hearing Officer grant the request for an increase in the number of unrelated persons who may reside in individual dwelling units from the allowable 3 persons to 4 persons for 38 units only. Hearing Officer: The Hearing Officer agrees with Staff's recommendation to approve the increase in the number of unrelated persons who may reside in individual dwelling units from 3 person to 4 persons for 38 units only. The amenities provided and the location of the development in near proximity to the University campus justify this specific increase in the permitted density. CONCLUSIONS AND FINDINGS OF FACT The Hearing Officer makes the following conclusions and findings of fact: Multi -family dwellings are permitted in the CC, Community Commercial District, subject to an administrative review. The Retreat at 1200 Plum Street complies with applicable General Development Standards of Article 3, with the exception of two (2) Modification Requests, one (1) Alternative Compliance Request, and one (1) Exception Request for the following Sections: • 3.5.1(1)(1) Outdoor Storage Areas/Mechanical Equipment (Trash Enclosures) (Modification of Standards) The Hearing Officer finds that the design of the trash enclosure into the building mitigates the need for the entire 20 feet of setback and results in a modification that is inconsequential from the perspective of the entire development plan. • 3.5.2(C)(2) Street Facing Facades (Modification of Standards) The Hearing Officer finds that the design of the entries for building C meet the standard "equally well or better than would a plan that complies with the standard" and the variation between the proposed design and the standard is nominal and inconsequential to the overall development plan. • 3.5.2(D)(2)(a) Residential Building Setbacks, Lot Width and Size (Alternative Compliance) The Hearing Officer finds the property is located in the CC zoning district and the TOD Overlay Zone, which are designed to promote infill and compact urban development. A critical component of achieving the aforementioned design components is the streetscape. The 15 (A) Except as provided in subsection (B) below, or pursuant to a certificate of occupancy issued by the city to the owner of the property, the maximum occupancy allowed per dwelling unit in a single-family, two-family or multi- family dwelling shall be: (1) one (1) family as defined in Section 5.1.2 and not more than one (1) additional person; or (2) two (2) adults and their dependents, if any, and not more than one (1) additional person. Section 3.8.16(E) of the LUC allows an owner to petition the appropriate decision maker for an increase in the number of unrelated parties allowed within an individual unit by: (E) Increasing the Occupancy Limit. (2) With respect to multiple -family dwellings, the decision maker (depending on the type of review, Type 1 or Type 2) may, upon receipt of a written request from the applicant and upon a finding that all applicable criteria of this Land Use Code have been satisfied, increase the number of unrelated persons who may reside in individual dwelling units. The decision maker shall not increase said number unless satisfied that that the applicant has provided such additional open space, recreational areas, parking areas and public facilities as are necessary to adequately serve the occupants of the development and to protect the adjacent neighborhood. Applicant's Request as stated in the Applicants Narrative or Planning Objectives: Since the development is proposing four bedroom units, the issue of unrelated occupants arises. The developer would like to propose an increase in the occupancy limit per LUC Section 3.8.16(E)(2). The project will provide approximately 30' x 60' courtyard amenity areas within buildings A and B. The areas are approximately 1,800 sq. ft. each and will contain a large hot tub, seating, and landscaping in each courtyard. In addition, there will be approximately 7, 000 square feet of interior amenity space in Building B, where the community services described above will be available for use by the building's occupants. Staff Analysis of Exception Request Staff has reviewed the request in accordance with the review criteria outlined in Section 3.8.16(E)(2) and finds that the recreational areas and open space provided for this type of urban development coupled with the fact that 314 parking stalls are provided where none in the TOD Overlay Zone are required satisfies the protections for the adjacent 14 We are proposing the following street setbacks: • Front yards facing Plum Street (Buildings A, B & D) - 6 feet • Front yards facing Bluebell Street (Buildings A and B) — 11 feet • Front yards facing Columbine Street (Building C only)- 12 feet We are requesting approval for an alternative site layout that we feel meets the standard equally well or better than a plan that complies with the standards per Review Criteria 3.5.2(D)(2)(a) 2b. and c. in the following ways: • The buildings will have off-street parking located in a parking structure. • The buildings will have private amenity areas. Buildings A & B will have interior courtyards (30' x 60) and there will be approximately 7, 000 square feet of interior amenity space in Building B. • The buildings feature ground level patios with walk -out doors, and balconies at the upper stories, giving the building a quality residential appearance. The closer setbacks give the building more of the urban feel that typically occurs with higher density housing. • The project provides street enhanced sidewalks that exceed the standards, reinforcing the streetscape as a comfortable pedestrian route and gathering area with an urban residential character that exemplifies the urban infill goals of the City. Staff Analysis of Alternative Compliance Request The property is located in the CC zoning district and the TOD Overlay Zone, which are designed to promote infill and compact urban development. A critical component of achieving the aforementioned design components is the streetscape. The streetscape in this proposed development places the buildings up to the street and creates a pedestrian realm that forwards the TOD Overlay Zone and CC zoning. Additionally, the criteria for alternative compliance are designed primarily for multifamily, yet the analytical elements are achieved through the incorporation of private courtyards for residents, provision of on -street parking, and strengthening the streetscape. Therefore, based upon the criteria set forth in Section 3.5.2(D), staff recommends approval of the alternative compliance setback request. Hearing Officer: The Hearing Officer agrees with Staff's recommendation to approve the alternative compliance setback request of Section 3.5.2(D). EXCEPTIONS Section 3.8.16 — Occupancy Limits; Increasing the Number of Persons Allowed Section 3.8.16(A) specifies: 13 The citation for the applicable review criteria for a Modification is as follows: "(H) Step 8 (Standards): Applicable, and the decision maker may grant a modification of standards only if it finds that the granting of the modification would not be detrimental to the public good, and that: (1) the plan as submitted will promote the general purpose of the standard for which the modification is requested equally well or better than would a plan which complies with the standard for which a modification is requested; (4) The plan as submitted will not diverge from the standards of the Land Use Code that are authorized by this Division to be modified except in a nominal, inconsequential way when considered from the perspective of the entire development plan, and will continue to advance the purposes of the Land Use Code as contained in Section 1.2.2. " Staff Evaluation of Applicant's request Staff has evaluated the applicant's request against the criteria provided in Section 2.8.2(H) of the Land Use Code. Specifically, Staff finds that the design of the entries for building C meet the standard "equally well or better than would a plan that complies with the standard" and the variation between the proposed design and the standard is nominal and inconsequential to the overall development plan. Therefore, Staff recommends approval of this request. Hearing Officer: The Hearing Officer agrees with Staff's recommendation to approve the modification of Section 2.8.2(H). Building C entries on the North and South sides of the building meet the standard. At the public hearing, the owner of the property South of Building C, stated that he was in negotiations with the applicant for the purchase of his property. If the property is acquired and the applicant decides to modify the size and orientation of the entries, Section 2.8.2(H) should be re-evaluated and consideration given to the location of the entries. ALTERNATIVE COMPLIANCE Section 3.5.2(D) — Residential Building Standards The code requires the minimum setback of every residential building from any public street right-of-way be fifteen (15) feet. The applicant is requesting Alternative Compliance set forth in Section 3.5.3(D)(2)(a). Applicant's Summary of Alternative Compliance Request 12 We are requesting approval for this modification that we feel complies with the standards per Review Criteria 2.8.2(H)(1) and (4) in the following ways: Criteria (1): the plan as submitted will promote the general purpose of the standard for which the modification is requested equally well or better than would a plan which complies with the standard for which a modification is requested. A goal of this City Standard is to have building facades that allow a quality street presentation, where entrances are generally designed with pedestrian -scale porches and massing that allow the building to have an attractive appearance from the street. As a response to these goals, Building C is designed with "four sided" architecture, where all of the faces of the building are highly articulated and feature fagade bump -outs, and a hierarchy of material coursing that reduces the overall massing of the structure. As a result, the proposed West elevation of Building C has an attractive street presentation, and provides a "street facing fagade" equal to the standard. Overall, the proposed building is more attractive than a strict interpretation of the standard- in which the front is highly articulated and the other building sides are less articulated. • Two sidewalk connections are provided for Building C that are clearly illuminated, and are identifiable from Columbine Street. The entrances are only 42 feet from Columbine Street and serve only eight units with each sidewalk connection. We feel that this configuration is "equal to" providing only one entrance that faces Columbine Street directly. • A shade arbor is proposed along the street -facing fagade of Building C, which further enhances the fagade and overall massing of the structure and provides additional pedestrian -scale interest. Criteria(4): The plan as submitted will not diverge from the standards of the Land Use Code that are authorized by this Division to be modified except in a nominal, inconsequential way when considered from the perspective of the entire development plan, and will continue to advance the purposes of the Land Use Code as contained in Section 1.2.2. • Columbine is a dead end street with little vehicular traffic, and in functional terms, the street frontage at Building C remains "public" mainly to be used by this development. Even though Columbine Street is a public street, and therefore requires a street -facing fagade, the benefit of having a street -facing fagade in this context is inconsequential. There does not appear to be any benefit to the general public with having the Building C entrance face Columbine Street. Review of the Modification Criteria — Section 2.8.2(H): 11 Review of the Modification Criteria — Section 2.8.2(H): The citation for the applicable review criteria for a Modification is as follows: "(H) Step 8 (Standards): Applicable, and the decision maker may grant a modification of standards only if it finds that the granting of the modification would not be detrimental to the public good, and that: (4) The plan as submitted will not diverge from the standards of the Land Use Code that are authorized by this Division to be modified except in a nominal, inconsequential way when considered from the perspective of the entire development plan, and will continue to advance the purposes of the Land Use Code as contained in Section 1.2.2." Staff Evaluation of Applicant's request: Staff has evaluated the applicant's request against the criteria provided in Section 2.8.2(H) of the Land Use Code. Specifically, Staff finds that the design of the trash enclosure into the building mitigates the need for the entire 20 feet of setback and results in a modification that is inconsequential from the perspective of the entire development plan. Therefore, Staff recommends approval of this request. Hearing Officer: The Hearing Officer agrees with Staff's recommendation to approve the Section 3.5.1(1) — Outdoor Storage Areas/Mechanical Equipment requested modification of the location of the trash enclosure areas. The Hearing Officer finds that the granting of the six foot setback and location of the trash enclosures into the building will not be detrimental to the public good. Modification #2: Section 3.5.2(C)(2): street -facing front facade The code requires that every building containing four (4) or more dwelling units shall have at least one (1) building entry or doorway facing any adjacent street that is smaller than a full arterial or has on -street parking. The applicant is proposing that the entrance of building C, not face directly on to Columbine, but rather face North and South. The applicant has proposed that the modification of the standard would not be detrimental to the public good and that the current design with entries facing North and South, meets the requirements for a modification set forth in Sections 2.8.2(H)(1) & (4) of the LUC. The Applicants iustification is as follows: 10 The applicant is proposing trash facilities at Aster Street and Columbine Street be located a minimum of 6 feet from the Right of Way (ROW) where a minimum of 20 feet are required. The Applicants justification is as follows: We are requesting approval for this modification that we feel complies with the standards per Review Criteria 2.8.2(H)(1) and (4) in the following ways: Criteria (1): the plan as submitted will promote the general purpose of the standard for which the modification is requested equally well or better than would a plan which complies with the standard for which a modification is requested. And, Criteria(4): The plan as submitted will not diverge from the standards of the Land Use Code that are authorized by this Division to be modified except in a nominal, inconsequential way when considered from the perspective of the entire development plan, and will continue to advance the purposes of the Land Use Code as contained in Section 1.2.2. The proposed 6 foot setback is adequate for the trash enclosures at both Aster and Columbine Street to operate without impeding pedestrian flow at the adjacent sidewalk. The main service doors will not encroach into the R.O.W. when fully open. The wall enclosures have been designed to be fully integrated into the main architectural fagade, using a precast base course material, and a stone veneer material for the top course. The main service doors are fully opaque painted steel. Each door panel is framed with a wide steel band, with vertical banding accents on the interior portion of each panel. The intent of this design is to provide pleasing aesthetics that are appealing to pedestrians in close proximity to the enclosures. We are providing wider sidewalks at both Aster and Columbine Streets and the trash enclosures are integrated into an overall streetscape that enhances pedestrian circulation. Both Aster Street and Columbine are essentially dead-end streets, and locations of the enclosures at the end of these streets are at portions of the site where impact on pedestrians and adjacent properties are minimal. The walls of the trash enclosures have been designed to be eight feet six inches in height, and additionally the trash containers within the enclosures are fully covered. These factors are sufficient to mitigate the possibility of odors or trash from escaping from the enclosures. Given the location and design of the trash enclosures, and the treatment of a functional pedestrian streetscape around the enclosures, we feel that the 6 foot setback is equal to the 20 foot setback in this circumstance. E 3. Privacy. Buildings or structures greater than 40' in height shall be designed to avoid infringing on the privacy of adjacent public and private property, particularly adjacent residential areas and public parks. While there may be instances of nominal privacy infringement, staff finds that this will be temporary as the area redevelops and achieves the intent of the CC zone district. 4. Neighborhood Scale. Buildings or structures greater than 40' in height shall be compatible with the scale of the neighborhoods in which they are situated in terms of relative height, height to mass, length to mass, and building or structure scale to human scale. This application proposes buildings that meet the minimum height requirements and do not exceed the maximums of the CC zone district. Additionally, this property is located in an area that will undoubtedly with this project provide an opportunity for additional redevelopment. This proposed development anticipates the desired Neighborhood Scale and is not incompatible with respect to the neighborhood context and desired development pattern. H. Section 3.6.4 — Transportation Level of Service Requirements The Transportation Impact Study that was submitted as part of the Retreat at 1200 Plum Street, PDP has been reviewed by City staff. The project represents infill re- development that will generate a significant increase in the number of trips to and from the area. The trip generation was discussed and agreed to in a scoping meeting between the Applicant and City staff and the project will comply with the Transportation Level of Service Requirements. MODIFICATIONS TO APPLICABLE GENERAL DEVELOPMENT STANDARDS; EXCEPTIONS AND ALTERNATIVE COMPLIANCE MODIFICATIONS (1) As specified in Section 2.8.2 Modification Review Procedures, (H) (Standards), the Administrative Hearing Officer may grant a modification of standards only if he/she finds that the granting of the modification would not be detrimental to the public good. The Applicant has proposed the following Modifications: Modification #1: Section 3.5.1(1) — Outdoor Storage Areas/Mechanical Equipment 8 would unify with the balance of the project and help mitigate the concerns expressed by the property owner to the East. Staff recommends the following Condition: Applicant shall incorporate a base feature and the use of varying material or scoring accents for the Parking Structure. The buildings as proposed are either 4 or 5 stories (55' — 70') in height. Of note is that the CC district has a minimum height requirement, which creates an expectation for vertical urban development, which this development proposes. A concern expressed by the property owner of the rental home located at the Northwest corner of Columbine and Plum was that a four story is not compatible. However, Staff finds that the intent of the zoning district, the requirements of the zoning district and the vision for this area are achieved by this development application and would also submit that the low intensity uses in this area will eventually redevelop in accordance with the intent of the zoning. G. Section 3.5.1(G) — Building Height Review- Special Height Review The purpose of this section is to establish a special process to review buildings or structures that exceed 40' in height and define and reinforce downtown and designated activity centers. 1. Views. A building or structure shall not substantially alter the opportunity for, and quality of, desirable views from the public places, streets and parks within the community. Desirable views are views by the community of the foothills, mountains and/or significant local landmarks. Staff finds that the requirements of the CC zone district relative to minimum height requirements, the existing trees, required landscaping and existing development in the immediate vicinity render this standard not applicable. 2. Light and Shadow. Buildings or structures greater than 40' in height shall be designed so as not to have a substantial adverse impact on the distribution of natural and artificial light on adjacent public and private property. Adverse impacts include, but are not limited to, casting shadows on adjacent property sufficient to preclude the functional use of solar energy technology, creating glare such as reflecting sunlight or artificial lighting at night, contributing to the accumulation of snow and ice during the winter on adjacent property, and shading of windows or gardens for more than 3 months of the year. While the applicant conducted a shadow analysis that demonstrated negligible impacts, this property is located within the CC zoning and as such, a shadow analysis is not necessary in accordance with Section 3.2.3(D) (1). 7 The property is located in the City's defined Transit -Oriented Development Overlay Zone. Section 3.2.2(K)(1)(a)l states: "Multi -family dwellings and mixed -use dwellings within the Transit -Oriented Development (TOD) Overlay Zone shall have no minimum parking requirements. " Since the Retreat at 1200 Plum Street, PDP contains only multi -family dwellings as the proposed land use, there are no minimum on -site parking requirements associated with the project. However, the applicant is proposing an on -site parking structure, with access from Plum Street, that contains 314 parking spaces (compact, long-term, handicap). For reference only, and based on the minimum parking requirements for the mix of 1-, 2-, 3-, and 4-bedroom dwelling units, a total of 369 parking spaces would be required if the project were not in the TOD Overlay Zone. D. Section 3.2.3(C) — Access to Sunshine This standard is intended to ensure, to the maximum extent feasible, the protection to sunshine for planned solar energy systems or for solar -oriented rooftop surfaces that can support solar collectors or collectors capable of providing for the anticipated hot water needs of the buildings in the project between the hours of 9:00 am and 3:00 pm MST, on December 21. This development can meet the standards as outlined in this code section. E. Section 3.2.3(D) (1) and (2) — Shading These standards are designed so as not to cast a shadow onto structures on adjacent property using specific parameters and the evaluation of the impact of trees on an individual basis. However, Section 3.2.3(D) (1) is not applicable since the property is located within the CC zoning district and the trees that will be planted as part of this proposed'development will not have a significant adverse impact upon the surrounding properties. F. Section 3.5.1 —Building and Project Compatibility This standard is designed to ensure compatibility of new buildings with the surrounding context. In this case, the context includes a 1 story rental unit located at the Northwest corner of Plum and Columbine; a Sorority to the East across Aster on the North side of Plum; the Cambridge House Apartments to the East on the South side of Plum and the Sunstone Condominiums and a Fraternity to the North. The building materials include stone, stucco and the residential buildings are well articulated. The parking structure is a combination of concrete materials with metal trellis for "living walls", which are designed to soften the streetscape with greenery and also serve to break up the mass of the building. However, the parking structure lacks some of the architectural appointments of the residential buildings such has a defined base and use of stone that 2 Building Orientation, The Retreat ground floor will not include a commercial use therefore the orientation requirement set forth in Section 4.18(E)(1)(a), does not apply. Central Feature or Gathering Place set forth in Section 4.18(E)(1)(b) is achieved by the two interior courtyards for Buildings A and B and niches along the streetscape adjacent to the buildings that provide casual gathering areas that include seating opportunities and welcoming landscaping. Of note are the combined stormwater detention facilities that include landscaping and additional opportunities for seating. These unique and cutting edge stormwater retention facilities may be considered a central feature. Minimum Building Frontage set forth in Section 4.18(E)(2)(c), requires 40% of each block side or 50% of the total of all block sides to consist of either building frontage, plazas or other functional open space. The proposed buildings included in this development front the entirety of all adjacent streets. The subject blocks are bounded by West Plum Street to the South, Aster Street and Scott Avenue to the East, Bluebell Street in the center, and Columbine Street to the West. Building Height set forth in Section 4.18(E)(2)(d) requires a minimum height of 20'. The proposed buildings are to be either 4 or 5 stories in height, which exceeds the minimum height while not exceeding the 5 stories height limit. 3. Compliance with Applicable General Development Standards: The Retreat PDP complies with the applicable General Development Standards as follows: A. Section 3.2.1 — Landscaping and Tree Protection The PDP satisfies the applicable standards set forth in this section of the LUC. Existing and proposed street trees are being provided, foundation plantings will be provided in the parkway along all adjacent streets. Some existing trees on -site are to be removed and will be replaced with the required number of mitigation trees. B. Section 3.2.2 — Access, Circulation and Parking The site is an infill project surrounded by existing development. Connections for vehicles, bikes and pedestrians are existing in the area, but not along all streets. The existing circulation network provides 3' attached walks along all streets, but only offers bike lanes along Plum Street. The proposal includes planters, detached walks, trees, bike lanes and auto travel lanes on all streets included in the proposal. The addition of detached walks and bike lanes provides for a safer route for students traveling to and from C.S.U. C. Section 3.2.2(K) - Parking Lots — Required Number of Off -Street Spaces for Type of Use N FACTS AND FINDIN Multi -family dwellings are permitted in the CC, Community Commercial District, subject to an administrative review. The Retreat at 1200 Plum Street complies with the applicable requirements of the Land Use Code (LUC). In addition, The Retreat complies with applicable General Development Standards of Article 3 with modifications and exceptions described more fully in this Decision. 1. Compatibility with Surround Uses. The surrounding zoning and land uses are as follows: N: CC; Existing multi -family dwelling units (Sunstone Condos) S: CC; Existing multi -family dwelling units (Cambridge House, Town Square Condo) E: CC; Existing sorority house (Tau of Gamma Phi Beta) W: CC; Existing single family detached dwelling units 2. Compliance with Division 4.18 CC, Community Commercial District A. Purpose The purpose of the Community Commercial District is as follows: The Community Commercial District provides a combination of retail, offices, services, cultural facilities, civic uses and higher density housing. Multi -story buildings are encouraged to provide a mix of residential and nonresidential uses. Offices and dwellings are encouraged to locate above ground -floor retail and services. The Retreat is a multi -family student housing project containing 197 dwelling units in 4 buildings and a separate building containing 314 parking spaces. The 4 multi -family buildings contain a total of 451 bedrooms. There are no minimum off-street parking requirements for this development because it is located in the Transit -Oriented Development (TOD) Overlay Zone. Buildings A and B are proposed to be 5 stories tall, approximately 70 feet in height. Buildings C, D and the parking structure are proposed to be 4 stories tall, approximately 55 feet in height. B. Permitted Land Use The proposed land use is permitted in the CC District, subject to an Administrative review and public hearing in front of the Hearing Officer. This was accomplished on April 23, 2009. C. Development Standards M PUBLIC HEARING: The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the hearing at approximately 5:30 p.m. on April 23, 2009, in the Community Room, 215 N. Mason, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The Hearing Officer accepted during the hearing the following evidence: (1) Planning Department Staff Report; (2) application, plans, maps and other supporting documents submitted by the applicant and the applicants' representatives to the City of Fort Collins; (3) opportunity for public testimony was provided during the hearing. Members of the public commented on the parking, traffic impacts, pedestrian and bicycle flows and . (4) The Land Use Code, the City's Comprehensive Plan (City Plan) and the formally promulgated polices of the City are all considered part of the evidence considered by the Hearing Officer. The following persons attended the hearing: From the City: Steve Dush, City of Fort Collins Steve Olt, City of Fort Collins Sheri Langenberger, City of Fort Collins From the Applicant: Rondo Fehlberg, Glenwood Intermountain Properties Nick Haws, Northern Engineering Russell Lee, VFR Design Doug Dohn, Dohn Construction From the Public Seven citizens attended and spoke. A copy of the sign in sheet is attached hereto. NEIGHBORHOOD INFORMATION MEETING The applicant held a neighborhood information meeting on March 24, 2009. This was not required, but the information obtained from the meeting has been considered in the staff review. The topics from the neighborhood meeting included the design of the parking structure; the compatibility of a four story structure adjacent to the existing single story rental home at the NW corner of Plum and Columbine and the use of Scott Avenue. 3 tI CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE 1 ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION ADMINISTRATIVE HEARING DATE PROJECT NAME: CASE NUMBER: April 23, 2009 The Retreat at 1200 Plum Street Project Development Plan #34-08 APPLICANT: Northern Engineering C/O Nick Haws 200 South College Avenue, Suite 100 Fort Collins, CO 80524 OWNER: Glenwood Intermountain Properties 1425 N. University Ave. Provo, Utah 87604 HEARING OFFICER: Richard V. Lopez PROJECT DESCRIPTION: This is a request for a luxury student housing project containing 197 units, located on 2.63 acres in the 700 block of West Plum Street. The site is approximately 350 feet from the Western edge of the Colorado State University campus. The property is zoned Community Commercial District (CC) and currently contains several single-family homes built in the 1950's that are being used as rental properties for students. The proposal consists of four (4) multi -family housing structures and a parking structure that contains 314 spaces. The two larger buildings contain 90 and 83 units and are proposed to be 70 feet in height. The smaller buildings contain 16 and 8 units and are proposed to be 55 feet in height. The parking structure is proposed to be 55' in height. SUMMARY OF HEARING OFFICER DECISION: Approval ZONING DISTRICT CC - Community Commercial District NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established the fact that the hearing was properly posted, legal notices mailed and notice published. 2 �.F,�ort Collins May 7, 2009 Dear Participant: Planning, Development and Transportation Services Current Planning 281 N. College Ave. PO Box 580 Fort Collins, CO 80522-0580 970.221.6750 970.224.6134 - fax fcgo v. com/currentptanning RE: Administrative Hearing for: The Retreat at Plum Street, Project Development Plan (PDP), # 34-08) Final Action Date: May 7, 2009 Appeal Application due to City Clerk by: May 21, 2009 Enclosed is a copy of the Type I Administrative Hearing Findings, Conclusions, and Decision for the The Retreat at Plum Street, Project Development Plan (PDP), # 34-08). The Hearing Officer has approved the application. This final decision of approval may be appealed to the City Council in accordance with Section 2-48 of the Code of the City of Fort Collins. The appellant must submit written notice of appeal, reasons for the appeal and a filing fee of $100 to the City Clerk's Office within 14 days of the date of final action by the Hearing Officer by the appeal by date shown above. Information regarding the grounds for appeal is available on the City Clerk's page of the City's website at http://fcqov.com/cityclerk/appeals.php. If appealed, the City Clerk will place the item on the Council agenda for hearing as expeditiously as possible. The City Clerk will provide written notice of an appeal from a final decision of the Hearing Officer to the City Council to the appellant, the applicant and all other parties -in -interest 10 days prior to the date set for the hearing. An appeal of the Hearing Officer's final decision is based on the minutes of the proceedings at the Administrative Hearing and any other materials received by the Hearing Officer. New evidence may not be considered on an appeal. The City Council may uphold, overturn, or modify the decision of the Hearing Officer. If you have specific questions about the appeal process, please contact me at 221-6750. Sincebush ev Current Planning Director