Loading...
HomeMy WebLinkAboutCHOICE CENTER MIXED-USE REDEVELOPMENT - PDP - PDP110006 (15-08) - REPORTS - RECOMMENDATION/REPORTS and Recreational Park Planning and Development Division City of Fort Collins MEMORADNUM DT: April 9, 2008 TO: Anne Aspen, City Planner FR: Craig L. Foreman, Manager Park Planning and Development ifY RE: Choice Center Development, Sidewalk Connection on Creekside Park This memo is my commitment to work with Jim Sell Design and the Choice Center Development for the granting of an easement for the purpose of a sidewalk connection from the Development to the Spring Creek Trail in Creekside Park. cc: Lindsay Kuntz 215 North Mason Street • 3rd Floor • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6360 • FAX (970) 221-6586 Page 1 of 1 Anne Aspen - Anne, From: Brian Varrella To: Anne Aspen Date: 10/27/2008 2:00 PM Subject: Anne, CC: Bob Smith Anne, We would like to add the following conditions to the PDP hearing text for the Choice Center: 1. No surface fill, excavation, or site grading may be initiated in the effective FEMA-regulatory floodway until a Conditional Letter of Map Revision (CLOMR) is approved by FEMA. 2. Any utility installation activities in the effective FEMA-regulatory floodway will require a floodplain use permit and no rise certification, shall be immediately returned to original grade upon completion, and be supported with survey information before and after installation. 3. No building permits will be issued in the effective FEMA-regulatory floodway until a Letter of Map Revision (LOMR) is approved by FEMA. 4. All allowable development in the FEMA-regulatory flood fringe or floodway must be preceded by approved floodplain use permits. Please review this information and offer any necessary revisions or suggestions. We would like to contact Walker May today and share this information directly. Please contact me at 2217, or Bob at 6021, after you have had a chance to look at these comments. Thanks, Brian file://C:\Documents and Settings\AAspen\Local Settings\Temp\XPgrpwise\4905C98EFC1CFCP010013... 10/27/2008 0 of F6rt Collins Memo Date: November 3, 2008 To: Rich Lopez, Administrative Hearing Officer From: Anne Aspen, Senior City Planner 44' Re: Choice Center Mixed -Use Redevelopment Project Development Plan, Administrative Hearing on November 3, 2008 Planning, Development and Transportation Services Current Planning 281 N. College Ave. PO Box 580 Fort Collins, CO 80522-0580 970.221.6750 970.224.6134 - fax fcgo v. com/currentplanning This memo is intended to be a supplement to the staff report for the Choice Center Mixed -Use Project Development Plan to clarify that all standards contained in the Land Use Code have been met or will be met by the project before final approval of the project, except where a modification of standards is requested and granted. In particular, the standards of Division 3, Section 3.3.3—Water Hazards will be met prior to final approval of this project. The meeting of these standards is implied in the proposed condition of approval, since FEMA cannot and will not approve the CLOMR without these standards being met, but staff wishes to make these Final Plan review compliance with these standards explicitly clear in the PDP approval. Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 13 shall be immediately returned to original grade upon completion, and be supported with survey information before and after installation. 3. No building permits will be issued in the effective FEMA-regulatory floodway until a Letter of Map Revision (LOMR) is approved by FEMA. 4. All allowable development in the FEMA-regulatory flood fringe or floodway must be preceded by approved floodplain use permits. Attachments: Zoning exhibit Full sized site, architecture, landscape, and lighting plan set Special Height Review submittal Excerpts of the Transportation Impact Study dated April 2008 Modification of standards request, dated August 22, 2008 Letter of Intent from the City of Fort Collins for work done on the south of the property Copy of review file Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 12 2 and creates a building with 4 stories on College and 5 stories on Choice Center Drive. Building 3, as it exists also has a second floor on this lower level, accessible only from Choice Center Drive. All retail space has large commercial display -type windows framed with stone veneer fagade treatments within the parameters of the standard. 4. Findings of Fact / Conclusion: After reviewing the Choice Center Mixed -Use Project Development Plan - #15-08, staff makes the following findings of fact and conclusions: A. Mixed -use dwellings, multi -family and retail are all permitted uses in the C— Commercial District, subject to an Administrative Hearing. B. The Project Development Plan complies with all applicable district standards of Section 4.21 of the Land Use Code, C—Commercial District. C. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code, with one exception: i. Transportation Level -of Service Requirements [Section 3.6.4], where the applicant seeks a modification to the standard. D. The requested modification of standards complies with the procedural standards in Section 2.8.2 (H)(1). E. The Project Development Plan complies with all applicable administrative standards contained within Article 2 of the Land Use Code. 5. Staff Recommendation: Staff recommends approval of the request for modification and approval of the Choice Center Mixed -Use Project Development Plan - #15-08 with one condition: A. The Project Development Plan approval shall be contingent upon Federal Emergency Management Agency (FEMA) approval of the Conditional Letter of Map Revision (CLOMR). Construction in the floodway will be limited as follows: 1. No surface fill, excavation, or site grading may be initiated in the effective FEMA-regulatory floodway until a Conditional Letter of Map Revision (CLOMR) is approved by FEMA. 2. Any utility installation activities in the effective FEMA-regulatory floodway will require a floodplain use permit and no rise certification, v . � I d.., ..c, Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 11 cars, parties, etc. This project, on the other hand, is in effect the perfect antidote to the original problem as it offers the student population appropriate housing that is designed to meet their needs. The hearing officer may increase the number of unrelated persons who may reside in the four -bedroom units if he is satisfied that the project meets the needs of students. D. Development Standards for the Transit -Oriented Development (TOD) Overlay Zone — [Division 3.10] 1) Site Planning [Section 3.10.3] Primary building entrances all face public sidewalks or walkways that are designed to be like public sidewalks. Parking lots are to the sides of the buildings. Buildings face streets or private driveways that are designed to feel like public streets. Outdoor gathering spaces are created by Building 1's configuration with courtyards on the west side. 2) Streetscape and Pedestrian Connections [Section 3.10.4] This development will be constructing streetscape improvements on College, Stuart and Choice Center Drive. All have wide sidewalks to standard. The sidewalks on College and Stuart will be detached with street trees in a parkway to provide a sense of protection and buffering with traffic on College. The walkway on Choice Center Drive will be a wide attached walk with trees in cutouts with grates. Staff will work with the design team in Final Plan review to resolve the changes proposed for the walkways in front of Buildings 3 and 4 that are currently an arcade but which are proposed to be attached walks with no trees or foundation plantings. Aside from existing parking in front of Buildings 3 and 4 which will remain, all parking is to the sides of or behind the buildings, leaving the front entries easily accessible to pedestrians without vehicular conflicts. 3) Character and Image [Section 3.10.5] All of the buildings feature multi- faceted roofs which break the massing up into more human -scaled and visually interesting volumes. Chevron -shaped roof volumes cut through the rectangular volumes and provide visually interesting organization to the spaces. Materials proposed for the project include stacked flagstone veneers closest to pedestrian level, painted lapped metal panels, and painted cementitious panels which highlight the base and articulation of the structures. The colors proposed are low -reflectance earth -toned hues and fairly subtle. Multiple store fronts. are unified with a repeating pattern of fenestration and mullions which echo the pattern of downtown businesses. As mentioned above, the development is mixed -use and contains residential space that comprises at least 1/7th of the total square footage, so the allowable height is the base height in the district which is three stories, plus an additional story for a total of 4 stories. The site also has a significant grade change from College Avenue towards the west which spans building Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 10 set back approximately 300 feet from the property line so its impact is minimized. The impact is further minimized by the landscaping buffer. 5) Outdoor Storage Areas/Mechanical Equipment [Section 3.5.1 (1)]—All trash and recycling areas are at least 20 feet from public walks and are screened from view according to Section 3.2.5 of the Land Use Code. Trash enclosure elevations will be reviewed in Final Plan Review. All HVAC equipment will be located on the roof and screened from view. 6) Mixed -use, Institutional and Commercial Building Standards [Section 3.5.3]—Building 2 is a mixed -use building which fronts on both College Avenue and Stuart Street with connecting walkways and sidewalks along both streets. The College elevation is extended to the build -to line. A single, large dominant building mass has been avoided in the proposed building. Numerous changes in mass break up the volumes and are integrally related to entries, building structure and the organization of space. The proposed project contributes to the uniqueness of the Commercial zone district and sets a higher bar for future residential and mixed -use projects in the area. The design's emphasis on pedestrian spaces and more urban streetscapes are tailored to this site both in terms of its immediate context and its wider context within the zone district, especially in relation to the University. Most facades exceed the minimum wall articulations. Walls have clearly defined bays, multiple changes in plane, materials and texture. During Final Plan review, we will ensure that the architectural bays do not exceed 30 feet. All buildings have been designed with appropriate base and top treatments including stone veneer bases and chevron shaped roof forms. During Final Plan review we will address the 'future terrace' that is shown on Building 4 and which cannot be vested as shown on the plans. It will need to be added to the plans for approval now or be removed and added through a minor amendment process later. D. Supplementary Standards — [Division 3.8] 1) Occupancy Limits; Increasing the Number of Persons Allowed: [Section 3.8.16(E)(2)] This proposal is for multi -family and mixed -use dwellings which contain 1-4 bedroom units which are specifically tailored to and marketed to students. The 4-bedroom units do not meet the requirement to house no more than 3 unrelated people. The ordinance was specifically geared to prevent damage to established single-family residential neighborhoods that often accompanies students in the form of noise, extra Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 9 4) Special Height Review [Section 3.5.1(G)] Buildings 1 and 2 are proposed to be over 40 feet in height and thus are subject to this section of the Land Use Code. The maximum height allowed in the C—Commercial Zone district is 3 stories. However, in the TOD Overlay Zone District, an additional story is allowed over the base height for mixed -use projects, as described below. In addition, the grade change allows for a 5t' story on the back side (west side) of Building 2. Building 1's highest roof height is 54'3" though the predominant height is 477'. Building 2's highest roof is 63'8" though the predominant height is 57'6". The criteria for preserving views, minimal shadows, privacy and neighborhood scale must be considered within the context of the site and balanced with other interests that the project promotes. The project is surrounded by commercial properties to the north, south and east. The western portion of the site is sunken from the eastern portion that fronts on College Avenue so the buildings' height appears shorter from the street. The west property line is immediately adjacent to the BNSF railroad tracks which are raised on an embankment of land rising to 14 feet at its tallest, minimizing the appearance of the height of the project from the west. The land beyond that is zoned E—Employment and is owned by Colorado State University Research Foundation (CSURF). This site is immediately adjacent to the Mason Corridor and a prime site for increased density, given its proximity to the campus. Views of the foothills will be unavoidably altered as there is no feasible way to reorient the site plan to minimize this intrusion into the views. It is not anticipated that any single family homes will have substantially altered views from their property. The height of the buildings will contribute to significant new shadow casting but with limited impacts to adjacent private property, most of which is commercial or institutional in nature. Most shading will happen internally and in the worst case scenario, on December 21, on College Avenue, which may cause some maintenance issues during snow storms or icy conditions, though the shadow does not reach College Ave until the afternoon, so presumably the roads will have already been cleared. Snow and ice are likely to be an issue in the western courtyards during winter. Staff will suggest that this be addressed by the owner in their management plan. There are no existing or planned residential areas immediately adjacent to this site, so privacy is not a major cause for concern here. The project is adjacent to a public park, Spring Creek Park, to the south but Building 1 is Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 8 sufficiently lit and to provide additional shielding in a few places to protect adjacent properties from light spill and glare. f. Trash and Recycling Enclosures [Section 3.2.5]—Trash enclosures have been sized appropriately to accommodate trash and recyclables. Trash enclosure elevations will be reviewed in Final Plan Review. B. Environmental, Natural and Cultural Standards — [Division 3.4] 1) Buffer Zone Performance Standards: [Section 3.4.1(E)(1)] The Spring Creek is a protected natural feature that carries a buffer zone of 100 feet. The buffer is shown on the site plan. No buildings or paved surfaces are proposed within the buffer. A dense planting of appropriate trees and shrubs are proposed to screen the view of the parking lot and building beyond and to provide some mitigation habitat for wildlife. C. Building Standards — [Division 3.5] 1) Architectural Character, Building Size, Mass and Scale [Section 3.5 (B) and (C)]—The design of the project sets an enhanced standard of quality for future redevelopment projects in the area. The elevations of Building 1 are broken down into 3 "superbays" that align with the courtyards on the west side. Each superbay is about 115'. Within these superbays, the elevations are further broken down into roughly thirty-foot bays which lend a more pedestrian scale to these immense facades. Building 2 blends with Building 1 and adds a very pedestrian oriented base on the south and east facades with the retail use and commercial storefront windows. Additional articulation is needed to meet the standards and will be done in Final Plan review. Buildings 3 and 4 show additions and much -needed facelifts to existing strip shopping buildings which are outdated. The project generally sets an enhanced standard for future redevelopment with its architectural detailing, commercial display windows and metal detailing. 2) Privacy Considerations [Section 3.5.1 (D)]—The project is quite urban in nature, however zones of semi -private and public have been established relatively effectively in the outdoor courtyard areas. The mixed -use nature of the site provides some natural settings for interaction among neighbors in a public space. 3) Building Materials [Section 3.5.1 (E)]—Both the materials and colors proposed blend well with existing materials and colors and set an enhanced standard for future redevelopment. Clear glass is used in all commercial storefront windows and residential fenestration. J Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 7 bicycles and pedestrians. Parking bays are mostly perpendicular to the uses they serve, except where that was not possible due to the orientation of the land or where parking exists in front of Buildings 3 and 4. Parking is broken into smaller lots that serve each building and each side of Building 1. All landscaped islands are defined with curbs. Required parking setbacks are met. d. Parking Lots [Section 3.2.2 (K)]: 1.) Residential Parking requirements: [Section 3.2.2(K)(1)(a)] Since the proposed Buildings 1 and 2 are multi -family and mixed -use dwellings and since the project is within the City'sTransit-Oriented Development (TOD) Overlay Zone District, there are no minimum parking requirements. The proposed parking is significantly below what would have been required outside the TOD Overlay Zone but the plan counts on use of the readily alternative transportation opportunities: walking to campus, biking to campus on the Mason Trail when it is completed and riding the MAX BRT on the Mason Corridor when it is complete. Parking on Choice Center Drive is also available to residents. 2.) Non-residential parking requirements: [Section 3.2.2(K)(2)] Retail parking is limited by maximums. In this site design, aside from the new mixed -use parking to the south of Building 2, all retail parking exists. Additions to the east facades of the buildings will eliminate one row of existing parking and leave one row intact. 3.) Handicap Parking [Section 3.2.2(K)(5)]: The total number of parking spaces in the project is 327. Section 3.2.2(K)(5)(d) specifies that for this number, a minimum of 8 handicap accessible spaces must be provided. Twenty handicap parking spaces are provided. These spaces are located conveniently to the main entry doors of each of the buildings. 4.) Parking Space Dimensions: [Section 3.2.2.(L)] The parking dimensions indicated on the plans meet the minimum dimensions required. Many spaces are dimensioned for overhang into the paved and landscaped areas as allowed by Code. [Section 3.2.2 (L)] Where spaces overhang paved areas, the adjacent walk is at least 6 feet wide. e. Site Lighting [Section 3.2.4]—Proposed site lighting mostly meets our lighting standards. All but one of the specified light sources are concealed, down -directional luminaires, Additional work will be done during final plan review to resolve the one fixture that is not in compliance with the code, to resolve a few areas that are not Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 6 north as the Spring Creek Trail. Completion of the trail north to Laurel St. is expected by 2009. These are constraints on this project's ability to provide bike access that meets multi -modal level of service standards as described in Appendix H of the Transportation Master Plan, specifically for directness. A request for modification of standard has been submitted with this project (attached) which adheres to Section 2.8.2(H) of the Land Use Code. The modification cites the hardship rationale and states that adding bike lanes to either of these streets is neither practical nor feasible. The Mason Corridor is not a direct path between residents and their most common destination, CSU, but it is a dedicated bike path that is not excessively indirect either. A more northerly and thus more direct connection to this trail is not feasible because of the grade change, the imminent bus rapid transit fixed guideway and the existing BNSF railroad, all of which are safely crossed at an existing underpass on the Spring Creek Trail immediately south of the project. The project has provided an 8-foot wide bike and pedestrian path connecting to the Spring Creek Trail which, in turn connects to the Mason Trail past the railroad underpass. 5.) Transportation Impact Study. [Section 3.2.2(C)(8)] A Transportation Impact Study was performed and submitted with this proposal. Pertinent excerpts of the study are attached to this staff report. b. Access and Parking Lot Requirements [Section 3.2.2 (D)]: 1.) Pedestrian/Vehicle Separation [Section3.2.2.(D)(1)] Pedestrians and vehicles are separated to the maximum extent feasible on this infill and redevelopment site. Specially paved crosswalks connect the walkways with the street sidewalk along College Avenue where existing drive aisles prevent complete separation of pedestrians and vehicles. 2.) Access: [Section3.2.2.(D)(2)] All off-street parking spaces have unobstructed access to and from public streets. All off-street parking is contained onsite. 3.) Location: [Section3.2.2.(D)(3)] Lot 1 contains parking for Building 1. Lot 2 contains parking for Building 2. As this project is within the Transit -Oriented Development (TOD) Overlay Zone, there is no minimum parking required per Section 3.10. Therefore, no minimum guest parking is required either. c. Parking Lot Layout [Section 3.2.2 (E)-(J)]: The parking lot is designed with clear and logical circulation routes for vehicles, and also for Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 5 With 2 exceptions, standards have been met for interior parking lot landscaping. In the south parking lot and the lot in front of Building 3, a required landscape island to break up a row of 15 or more cars was not provided. This will be addressed in Final Plan review. Sight distance triangles are maintained at the driveway intersections. Landscaping notes are included in the landscaping plan set and will be reviewed for completeness and accuracy during Final Plan review. 2) Access, Circulation and Parking [Section 3.2.2] a. Development Standards [Section 3.2.2 (C)]: 1.) Safety Considerations: [Section 3.2.2 (C)(1)]— Pedestrians, bicycles and vehicles are separated to a large extent in this project. Choice Center Drive, a private drive, and the other internal access driveways connect streets and parking lots for auto access. Trails, sidewalks and walkways connect to the regional trails and public sidewalk network for pedestrians and bicyclists with enhanced crosswalks where needed for safe separation. All retail and residential uses take their primary access from the street fronts along College, Stuart and Choice Center Drive. Bike racks are conveniently located near all main entrances and are provided in numbers that far exceed the standards in this section. 2.) Curb cuts and ramps [Section 3.2.2 (C)(2)] Curb cuts and ramps are provided throughout the site. 3.) Site Amenities: [Section 3.2.2 (C)(3) and (4)] The design includes convenient and ample parking facilities for bicyclists and ramps and walkways for clear and direct access to all entrances. Walkways: [Section 3.2.2(C)(5)] To the extent maximally feasible, walkways within this infill and redevelopment site directly and continuously connect pedestrian points of origin and destination. Pedestrian access is provided from all primary doors to points north in anticipation of redevelopment of the private property between here and Prospect providing pedestrian connections. Pedestrian connections are also made to the public sidewalks on all frontages in logical and convenient locations. 4.) Direct Onsite Access to Pedestrian and Bicycle Destinations: [Section 3.22(C)(6) and Section 3.6.41 There are no bike lanes on College Avenue or Prospect Avenue between Shields and Timberline. No bike lanes are proposed on the City's Bike Plan because the high volumes and high speed of traffic along College are not conducive to safe bicycling. Bicyclists are expected to use the new Mason Corridor trail, which the City has constructed as far Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 4 Courtyards are proposed for the west sides of Building 1 to provide students with sheltered areas in which to gather. Pedestrian access to the north has been provided for in anticipation of future redevelopment on the private properties under separate ownership to the north. Pedestrian connections are made through the site to College Avenue on the north and south end of Building 2 and at the north end of Building 4. Eight -foot wide pedestrian and bike trail connections link the south end of the site with the Spring Creek Trail and Mason Corridor trail beyond. 3) Development Standards for the Transit -Oriented Development (TOD) Overlay [Section 4.21 (G)]—This site falls entirely within the TOD Overlay boundary and complies with the standards contained in Section 3.10 as described in the next section. 3. Compliance with applicable General Development Standards A. Site Planning and Design Standards [Division 3.2] 1) Landscaping and Tree Protection: [Section 3.2.1 ]—The existing undeveloped portion of the site contains a fairly dense canopy of trees. Early on in the project, the City Forester met onsite with the development team and assessed the health and significance of the existing trees. A majority of the trees are either weedy species or in poor health or both. The City Forester determined that very few of these required mitigation. Most will be removed. Four will be saved. The remaining significant trees to be removed will be mitigated by transplanting them on site or replaced with upsized trees. The Project Development Plan provides full tree stocking and street trees throughout the project in order to form at least a partial urban canopy. Street trees on College and Stuart are placed at 20-40 foot intervals in landscaped parkways. The design team will select species from the City's approved street tree list during Final Plan review. Screening of parked cars from the park and natural area to the south will be achieved with a dense planting of trees and mixed plantings of shrubs and ornamental trees. Buildings 1 and 2 have appropriate foundation plantings. Details will be reviewed in Final Plan review. Buildings 3 and 4 do not show foundation plantings. They are existing buildings which have an arcade and no landscaping. Proposed elevations for these 2 buildings were not submitted in time for staff review prior to the hearing and appear not to have arcades. These buildings may need to provide foundation landscaping. This issue can be addressed as a condition of approval or informally during Final Plan review. Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 3 2. Compliance with Applicable C—Commercial District Standards A. Purpose: The purpose of the Commercial District is as follows: "The Commercial District is intended to be a setting for development, redevelopment and infill of a wide range of community and regional retail uses, offices and personal and business services. Secondarily, it can accommodate a wide range of other uses including creative forms of housing. While some Commercial District areas may continue to meet the need for auto - related and other auto -oriented uses, it is the city's intent that the Commercial District emphasize safe and convenient personal mobility in many forms, with planning and design that accommodates pedestrians. " The proposed project will contain four buildings: a 4-story multi -family residence in the westem portion of the site, a 4-5 story mixed -use dwelling at the northwest comer of Stuart and College, and two rehabilitated, existing retail buildings (one 1-story and one 2-story) along College Avenue, which together will greatly increase the density of this infill and redevelopment site. The project's close proximity to CSU, the Mason Corridor and regional bike and walking trails make it a convenient and logical location for private student housing. The project will provide much needed aesthetic improvement for the existing retail buildings and will hopefully lay the groundwork for high quality future redevelopment in the area. B. Permitted Land Use: Multi -family dwellings, mixed -use dwellings and retail are all permitted in the Commercial District, subject to a Type I — Administrative Hearing. C. Development Standards: 1) Land Use Standards [Section 4.21(D)]—The maximum building height in this zone district is 4 stories. Buildings 3-4 are proposed to remain at one and two stories. Building 1 is proposed at 4 stories. Building 2 is proposed at 4-5 stories with 4 stories along College and 5 stories along Choice Center Drive, where the grade drops down. These 4t' stories are allowable per Section 3.10.5(F)(1)(a) because the proposed is a mixed -use development in which at least 1/7t' is residential. This is described in more detail in the following section. 2) Development Standards [Section 4.21(E)]—Site Design: The configuration of the site encourages pedestrian activity. Retail and office uses are proposed for the existing shops and the ground level of building 2. Choice Center Redevelopment Project Development Plan -Type I - #15-08 November 3, 2008 Administrative Hearing Page 2 EXECUTIVE SUMMARY: Mixed -use dwellings are permitted in the C—Commercial District, subject to an Administrative Hearing. This Project Development Plan complies with the applicable Administrative and General Development standards and the standards of the C— Commercial District, except where a modification of standard has been requested as noted below. COMMENTS 1. Background The surrounding zoning and land uses are as follows: N: C—Commercial, existing restaurant and retail (Chuck E. Cheese, Harbor Freight, etc) with CC —Community Commercial, existing retail and office beyond; E: C—Commercial, existing retail and office with LMN—Low Density Mixed -Use Neighborhood District, existing single family houses beyond; S: C—Commercial, existing retail, undeveloped land, and Spring Creek park and trail; W: E—Employment and CSU: Undeveloped land with some Colorado State University Research Facility (CSURF) agricultural facilities. The western portion of the site is the former site of the Johnson Mobile Home Park which was destroyed in the 1997 flood. The western portion of the site is now vacant land. The eastern portion of the site contains the Choice Center strip shopping center which is in operation. Portions of the site are currently in the floodplain and floodway. Since the flood of 1997, significant capital improvements have been made both upstream and downstream of this site to prevent a similar disaster from happening again. This site has far fewer potential impacts than it did prior to these improvements, but the remapping of this parcel is not official. The developer is in the process of working through this remapping and updating of the site through a Conditional Letter of Map Revision (CLOMR) with assistance from the City's Stormwater Utility. Therefore, any approval of the Project Development Plan must be conditioned on FEMA approval as noted in the Findings section of this report. Construction within the floodplain shall also be restricted per the condition, as noted below. A neighborhood meeting was not required for this project and none was held. No written comments from the public have been received by the planner on this project. A few calls have come in with basic questions about the project which were answered to the caller's satisfaction. The project has had a sign posted, the hearing was noticed by mail to affected property owners and notice of the hearing was posted in the Coloradoan. 717 City Of cM NO Fort Collins MEETING DATE Ndv. mil. 2oDrA STAFF AAws%2Pv� HEARING OFFICER PROJECT: Choice Center Mixed -Use Redevelopment PDP—Type 1 (#15-08) APPLICANT: Dave Pietenpol Jim Sell Design 153 W. Mountain Ave. Fort Collins, CO 80524 OWNER: Capstone Development Corp. 431 Office Park Drive Birmingham, AL 35223 PROJECT DESCRIPTION: This is a request to redevelop a 10.49 acre site near the southwest comer of College and Prospect which currently contains about 6 acres of vacant land and 5 existing buildings. As proposed, 3 of the buildings will be razed, the remaining 2 will be rehabilitated and 2 new residential buildings will be constructed to create a mixed -use project that offers private, off -campus student housing and retail. A total of 270,434 sf of residential space is proposed with 166 one- to four -bedroom units in Building 1 and 55 two- to four -bedroom units plus`7410sf of new retail in Building 2. The existing retail buildings along College will be expanded by approximately 4000sf each to a total of about 30,920sf for Building 3 (on two doors) and 15,910 for Building 4 (on one floor). The property is located near the southwest comer of Prospect Street and College Avenue. The site is within City limits and is zoned C—Commercial District. RECOMMENDATION: Staff recommends approval of the Choice Center Mixed -Use Redevelopment PDP—Type 1(#15-08) and associated modification with one. condition listed in the Findings section below. Current Planning 281 N College Av PO Box 580 Fort Collins, CO 80522-0580 fcgov.com/currentplanning 970.221.6750