Loading...
HomeMy WebLinkAboutASPEN DENTAL - PDP - 1-09 - REPORTS - PLANNING OBJECTIVESPDP Submittal December 29, 2008 Property Description: Speights P.U.D., Lot 7 Current Zoning: L-M-N (Low Density Mixed Use Neighborhood District) City Plan: Division 4.5 Applicant: Dr. Shiloh Lindsey, D.D.S. The proposed project consists of an approximate 2,600 square foot, single story dental office building located at 3838 South Timberline Road. The project shall be known as Aspen Dental. Based on the drives on existing developments to the north and south of the site, the eastern portion lends itself to vehicular circulation. Given our clients desire to have the main entrance on the south east corner of the building, the majority of the parking utilizes the southern portion. The west and northern portions of the site, due to setbacks, build to lines and easements, provides the opportunity for landscaping barriers to South Timberline Road. Please see the Landscape Plan that has been provided in this submittal for more information. The owner will provide service for the maintenance of public and private open areas as required. It is estimated that there will be a total of eight (8) employees at Aspen Dental. Due to the limited size of Lot 7, on site water detention was awkward at best. On behalf of the Owner, Architecture Plus and Northern Engineering attended the Sunstone Business Association's meeting on Dec 18`" to discuss tying into their detention pond. This, as well as a discussion about enlarging their existing trash enclosure to accommodate Aspen Dental's, was met with acceptance. Please see the attached email from Tom Kalert, principal of Architecture Plus to Dr. Shiloh Lindsey, owner that outlines the requirements set froth from that meeting. The civil drawings included in our submittal shall also lend further information. We have also included, in this submittal, the following: Response Letter based on comments from the Conceptual Review Letter. Three (3) lists of property owners within 800 feet of the property lines And a Development Schedule. 318 East Oak Street + Fort Collins, CO 80524 + 970.493.1220 tel + 970.224.1314 fax + www.aplusarch.com 16o3 Capitol Avenue + Suite 205 + Cheyenne, WY + 82001-4569 + 307.632.9903 tel + 307.634.6468 fax