Loading...
HomeMy WebLinkAboutASPEN DENTAL - FDP - 1-09/A - CORRESPONDENCE - (5)Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 78 Created: 6/ 19/2009 [7/14/09] Repeat Comment. [6/19/09] Formal permission from the Sunstone Mixed -Use property owner is required for the curb and gutter modifications and for their detention pond high water line to increase. Number: 80 Created: 7/14/2009 [7/14/09] No more comments. Please submit 3 signed copies of the drainage report with the mylars. Department: Zoning Issue Contact: Gary/Lopez Topic: Zoning Number: 79 Created: 7/8/2009 [7/8/09] OK. Be sure and return all red -lined plans if/when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours 1�Truly, Steve Olt City Planner cc: Susan Joy Lindsey Properties LLC Northern Engineering Current Planning file #01-09A Page 3 Number: 90 Created: 7/17/2009 [7/17/09] Please show, label and dimension the temporary construction easement on all plan sets and that it is dedicated by separate document, reception number xxx. Topic: Landscape Plan Number: 7 Created: 1 /22/2009 [7/15/09] The Landscape Plan needs to label and dimension this easement. [6/17/091 Plans are labeled only as an emergency access. Need to dedicate an access and emergency access as discussed below. [3/31/09] Please label this easement as access and emergency access, all sheets, all sets. [1/22/09] The access & emergency access easement through the site is not shown on any of the plan sets. Please show, dimension and label, all sheets. Number: 81 Created: 7/15/2009 [7/15/09] Please remove "PDF Submittal" from the lower right hand corner prior to running mylars. Number: 82 Created: 7/15/2009 [7/15/09] Please correct the spelling of "Landacape Sheet" in the Sheet Contents box of the title block. Topic: Site Plan Number: 83 Created: 7/15/2009 [7/15/09] Please remove "FDP Submittal" from the lower right hand corner prior to running mylars. Topic: Utility Plan Number: 84 Created: 7/15/2009 [7/15/09] Just a question (not a requirement) - can Sheets DT2 and DT3 be combined? Number: 87 Created: 7/16/2009 [7/16/09] Please remove the screen wall from the west side of the building, all sheets. Number: 88 Created: 7/16/2009 [7/16/09] From Technical Services: Elevation for benchmark 12-93 has changed. Please contact City surveying department for updated (August 2008) copy of the vertical control network. Department: PFA Issue Contact: Carie Dann Topic. Fire Number: 86 Created: 7/15/2009 PFA has no additional comments or concerns at this time. Page 2 STAFF PROJECT REVIEW Citz of Fort Collins ARCHITECTURE PLUS Date: 7/20/2009 c/o Shannon Doyle 318 East Oak Street Fort Collins, CO 80524 Staff has reviewed your submittal for Aspen Dental Care - Final Plans, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: General Number: 8 Created: 1 /22/2009 [7/15/09] Waiting for final documents. [6/17/09] Carrying the comment through until received. [3/31/09] Thank you for sending in the letter of intent. That is all we need to allow the project to go to public hearing. We will want a copy of the recorded easement in Final Compliance, prior to the final plan approvals. [1/22/09] Offsite construction is shown in the neighboring parking lot to the south. Is there an existing easement in place to allow that to occur or will we need to obtain one? Number: 12 Created: 1 /22/2009 [7/15/09] Waiting for final documents, TDRF and filing fees. [6/17/09] Letter of intent has been received however, still waiting for the final documentation described below. [3/31/09] Just keeping the comment alive until they are actually due in Final Compliance. [1/22/09] A legal description and exhibit for any additional easement is required for our review and approval in final compliance. There is an additional TDR Fee of $250 per dedication as well as Larimer County Filing fees. The county fees will not be known until we have the final number of sheets to record ($6 for the first page, $5 for each page there after & each dedication is calculated separately). Number: 85 Created: 7/15/2009 [7/15/09] Please coordinate all scanning issues and requirements directly with Jeff County in Technical Services (221-6588) prior to running mylars. Thank you. Number: 89 Created: 7/ 17/2009 [7/17/09] An updated Site Plan and Landscape Plan were emailed to me on Tuesday, July 14th at 3:45 pm. I was able to open and print out the Site Plan but unable to open or print the Landscape Plan. I responded by email to Shannon Doyle requesting that he resend the Landscape Plan for review but have not heard back as of July 17. All comments on the Landscape Plan are based on the original submittal. All comments on the Site Plan are based on the new submittal. Page 1