Loading...
HomeMy WebLinkAboutASPEN DENTAL - FDP - 1-09/A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI I I I I I I I r is e� ,° •„�. f DRAKE ROAD I I I I 6GR� GNCT PDUDR � ° •i LI L CITY MITS J NQ4�j, FRN ° � }a I R � � t � I ]n r I CITY LIMITS J , r — + e �° 1 j ORSETOOTH ROAD ° WARREN LAKE _PROJECT.. LOCATION �n � a �° I I n ` CITYLIMITS HARMONY ROAD Ie r•---- ° I + c ° z + ljc2% F = o m I J ° I W I > ` , Q r - - - a °a 0 > ...�,. Z Z w FF a F w •� �fq ��,,, e• / m CITLI Y MITS) p — > ii a 1f {a U . J f o —3 I PDRTNER VICINITY MAP 1V "=3000' It APPENDIX Vicinity Map J NORTHERN Final Drainage Report Aspen Dental References 1. Drainage Criteria Manual, Urban Drainage and Flood Control District, Wright Water Engineers, Inc., Denver, Colorado, Updated April 2008. 2. City of Fort Collins. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins, May 1984. 3. Final Drainage Report for Speights PUD, Northern Engineering Services, Inc., Fort Collins, Colorado, June 1992. 4. Drainage and Erosion Control Report for Sunstone Mixed -Use, Ayres Associates, Fort Collins, Colorado, September 2001. Z I I I I NORTHERN Final Drainage Report Aspen Dental - ENGINEERING As p Basins B1 and B2 have a water quality requirement of 0.006 ac-ft, which falls below the capacity of the existing structure. 8.0 Temporary Erosion Control Temporary erosion control measures have been provided on the grading and erosion control plan which will minimize sediment leaving the project site during construction. Silt fence will be placed along the north and western perimeter of the site to minimize sediment disturbance on -site. Wattles will be placed at all curb cut locations in order to minimize sediment entering the receiving storm sewer system. A vehicle tracking control pad will be placed at the southeastern entrance to the site, to reduce the amount of sediment tracked off -site. 9.0 Conclusions The proposed project will comply at final design with drainage criteria outlined in the City of Fort Collins Storm Drainage Design Criteria. Overall, the drainage system proposed within this report provides adequate conveyance, detention and water quality enhancement for the developed stormwater runoff for the site. Care has been taken to minimize any negative impacts on the downstream receiving waters. 8 I El I Chi I I I I D I I I I I I I I NORTHERN NfFzi ENGINEERING On -site Pond Information Final Drainage Report Aspen Dental Basin WQCV WQ Detention Water Detention Release Description Impervious- (ft3) WSEL Volume Surface Rate ness ft3 ( ) Elevation (cfs) Detention/Water 68.6% 332 4944.19 314 4945.01 1.58 Quality Pond As shown above the 100-year water surface elevation in the pond is 4945.01, which is at the same elevation as the. high point in the northern driveway to the animal clinic. The drive will serve as an emergency overflow for the pond. Flow from this point will travel north, ultimately reaching the Sunstone swale located north of the Clinic site. The available freeboard in the pond is approximately 0.30', with the lowest top of wall elevation being 4945.30. A variance will be requested to allow for the freeboard requirement of 1.0' to be waived. As designed, in the 100-year condition there will be 0.40' of ponding seen in the parking lot area. This falls below the acceptable limit of 1.0' in the 100-year condition. Basins B1 and B2 will discharge to the Sunstone Mixed Use detention pond located to the southeast of the site. The existing pond was analyzed to calculate the excess volume in the pond for use by the Aspen Dental site. The as -built detention ponds grading certification done by Ayres and Associates in April of 2004 were used as a basis for the analysis. The pond certification states that the detention volume requirements were met at an elevation of 4942.44, with a volume of 1.093 acre-feet. The pond spillway, located in the drive south of the Sunstone pond, was surveyed at with a flowline elevation of 4942.43 and a lip of gutter elevation of 4942.51 (inflow curb and gutter). The intent of this project is to replace the portion of the curb and gutter along the northern edge of the road, which is the lowest point of the emergency spillway for the Sunstone pond. When the portion of curb and gutter is replaced with an outfall section or a flat section, the spillway elevation will be increased to a minimum elevation of 4942.51. This translates into an additional 1791 cubic -feet of available volume in the pond. The additional volume required for the 0.166 acres flowing to the Sunstone pond was calculated to be 1551 cubic -feet. The Sunstone outlet structure was not modified, the additional depth of water on the existing structure was calculated to be 0.06'. This resulted in an additional release rate of 0.09 cfs. Water quality for Basin B1 will also be included in the Sunstone Pond. The water quality plate elevation for the Sunstone Pond was designed at 4939.10. From the as -built survey (Ayres), the available water quality volume at that elevation is 0.141 ac-ft. The Sunstone report lists a required water quality volume of 0.12 ac- ft for the site. This results in an excess in 0.021 ac-ft of volume for water quality. I 7 IFinal Drainage Report NORTHERN 9 p N ENGIMEERIMG Aspen Dental ■1 I I I I I Detention for the site has been included with the water quality pond located on - site. The detention and water quality portions of the pond were designed for the on -site area only. Both off -site basins will be allowed to be released undetained through the existing pipe system, flowing to the north. The existing pipe system was modeled using an assumed downstream water surface elevation of 4941.90. This value was agreed upon by Northern Engineering and City Staff, as a conservative estimate. The downstream hydraulic grade line is halfway between the top of pipe elevation of 4939.90 (24" invert elevation = 4937.90) and the rim elevation of 4943.90. The Aspen Dental site will contribute runoff to the existing storm pipe system within 5-10 minutes. The assumption is that the Aspen site will beat the existing swale/storm line peak by a large time margin. Below is a summary of the flows to the existing storm system. 100- Area year Accumulated Description Served Flow to Pipe Flow Comments (ac) Pipe (cfs) cfs) Off -site Basin 0.094 0.82 OS-1 Off -site Basin 0.400 1.77 OS-2 On -site Basins 0.284 1.58 0.82+1.77 On -site Basin release rate A1,A2,A3,C1 +1.58= 4.17 matches historic release rate (to on -site (Speights Basin D2) and Countryside 1.44 4.17+1.44= Flow taken from Speights PUD Animal Clinic 5.61 flow to existing inlet The release from the water quality/detention pond will be 5.61 cfs, as shown A above. The off -site basins will contribute 4.03 cfs of that value (undetained flow from OS-1, OS-2 and existing Countryside Animal Clinic inlet), while the on -site basins will be released at the historic Speights PUD Basin D2 flow value of 1.58 cfs. An 8" orifice will be placed at the outlet structure and will act as the controlling factor in the pond release for the 100-year storm. Below is a summary of the detention and water quality pond. a Ell 6 I (NORTHERN ENGINEERING Final Drainage Report Aspen Dental regarding the pond can be referenced in the detention/water quality section of this report. Basin OS-1 Basin OS-1 consists of a small area north of the site, on the Countryside Animal Hospital site, which drains onto the property. The basin contains the southern portion of the Animal Hospital parking lot area, as shown on the drainage plan. The drainage basin boundary for this area was verified with field visits, and shown approximately on the drainage plan. The imperious value for this basin was calculated from the existing site layout. Drainage from this basin travels overland into Basin A3. Basin A3 drains to a low point along the eastern curb line, where a curb cut has been provided, at Design Point A3. The drainage from the basin will discharge into the proposed detention/water quality pond, located at the eastern edge of the site. Flows from the basin will be allowed to pass through the pond undetained, per conversations with the City of Fort Collins Stormwater Staff. Basin OS-2 Basin OS-2 consists of the area located east of the site, which drains onto the property. The basin incorporates drainage from the back yards of the residential properties directly east of the site. The drainage basin boundary for this area was outlined in the "Speights PUD" drainage report, indicated as Basin D2. Basin D2 of the Speights report includes the Aspen Dental clinic site area as well as the residential area, for a total basin area of 0.85 acres. The area for Basin OS-2 was calculated by subtracting the Aspen Dental site area of 0.45 acres from the Speights Basin D2 area of 0.85 acres, for a total of 0.40 acres. The imperious percentage for the site was taken from the original Speights Report, matching that of Basin D2. The Speights Basin D2 information can be found in Appendix B. For the runoff time of concentration calculations, a time of 5 minutes was used as a conservative estimate. The flow from Basin OS-2 will travel overland, following historic drainage patterns to a proposed inlet located in sump at the eastern edge of the site. Flows from the basin will be discharged directly into the existing storm system undetained, per conversations with the City of Fort Collins Stormwater Staff. 7.0 Proposed Detention and Water Quality Water quality for the site will be provided on -site through the use of a traditional water quality structure, with an orifice plate designed to drain the pond within a 40-hour period. The water quality pond will be designed in accordance to standards issued in the Urban Drainage and Flood Control Manual 3. The water quality system will allow water to be filtered and discharged following historic drainage patterns. 61 NORTHERN Final Drainage Report Nt-. ENGINEERING Aspen Dental Basin A2 Basin A2 consists of the northern half of the building roof area. Downspouts from the roof are located on the north side of the building. Drainage from this basin travels to a drainage swale provided in the grassed area north of the building. Drainage from the swale travels to curb cut A3-1. Ultimately flow travels overland to a low point along the eastern curb line, where a curb cut has been provided. The drainage from this basin will discharge into the proposed detention pond, located at the eastern edge of the site. Basin A3 Basin A3 consists of the northern and eastern portions of the site. The impervious value for this basin was calculated from the proposed site layout. Drainage from this basin travels overland to a low point along the eastern curb line, where a curb cut has been provided. The drainage from this basin will discharge into the proposed detention pond, located at the eastern edge of the site. Basin Bi Basin B1 consists of the western half of the building roof area. Downspouts from the roof area are located on the west side of the building. Drainage from this basin travels beneath sidewalk chases B2-1 and B2-2, then overland to the eastern curb line. The southern portion of the eastern curb line slopes to the south, where drainage is discharged into the Sunstone detention pond. The Sunstone pond is located southeast of the site, and will intercept drainage from Basins B1 and B2. Basin B2 Basin B2 consists of the southern half of the site and includes the southern parking lot area. The impervious value for this basin was calculated from the proposed site layout. Drainage from this basin travels overland to an existing pan, which flows to the Sunstone Detention Pond. Historic drainage from Speights PUD Basin H1 is 0.55 cfs with a basin area of 0.26 acres. Basins B1 and B2 have a combined area of 0.166 acres and a developed runoff of 1.65 cfs. The total area of land draining to the pond is less than historic, however total runoff has been increased due to the developed impervious condition. Upon discussions with the City of Fort Collins Stormwater Staff, allowing runoff to travel south to the Sunstone Detention Pond is acceptable, providing the total area values fall below the original historic value seen in the Speights report. Basin C1 Basin C1 consists of the detention/water quality pond area located on the eastern edge of the site. The basin contains a traditional water quality structure, with a 40-hour release time. Detention volume for the site has been added to the water quality volume, per the City of Fort Collins requirements. Additional information 4 NORTHERN Final Drainage Report gLL en Dental As ENGINEERING p 5.0 Proposed Development The proposed project site consists of a single -story commercial building to be used as a dental clinic. Surrounding the proposed building will be a parking lot area and detention/water quality pond. The parking area will also provide a traffic connection between the veterinary clinic and the commercial buildings to the south. The site is 0.449 acres, and is located on Lot 7 of the Speights PUD subdivision. The USDA Soil Conservation maps indicate the site lies within soil hydrologic group C and is classified as Nunn Clay Loam. 6.0 Proposed Drainage Plan The drainage plan for the project is intended to match historic drainage patterns for the site. Storm runoff for the northern portion of the site will travel overland to the eastern boundary of the parking lot area. A curb cut will be placed in a sump location along the eastern curb line. Drainage will flow from the curb cut into the water quality and detention pond. An orifice plate at the outlet structure will act as the water quality control component, allowing the pond to drain within a 40- 1 hour time period. Larger flows will overtop the water quality plate and be discharged into the existing 15" storm line. An orifice plate will not be required to regulate larger storm event flows, the existing 15" storm line will be the controlling release factor. The northern portion of the site falls within Basin D2 of the Speights PUD drainage report, which discharges north through the existing pipe. The pipe drains to the Sunstone Swale located north of the Animal Hospital site. The southern portion of the site will flow to the south, to the detention pond constructed with the Sunstone Mixed Use Development. The southern portion of the site falls within Historic Basin H1 (Speights PUD), which drains to the south. Below is a description of the proposed basins for the site and their drainage patterns. Basin Al Basin Al consists of the eastern half of the building roof area. Downspouts from the roof are located on the east side of the building. Drainage from this basin travels through sidewalk chase A3-3, then overland to a low point along the eastern curb line, where a curb cut has been provided. The drainage from this basin will discharge into the proposed detention pond, located at the eastern edge of the site. I 3 N NORTHERN ENGINEERING 4.0 Historic Drainage and Major Drainage Basin Final Drainage Report Aspen Dental Historic drainage patterns are outlined in the Speights PUD Drainage Report provided in Appendix B. The site is included in the Speights historic drainage Basin D2, Design Point 2. Basin D2 consists of a residential area within the eastern portion of the basin, with the remaining portion of the site modeled as undeveloped. The overall C value for the undeveloped basin was shown to be 0.27 in the Speights Drainage Report. Basin D2 is drains to an area inlet located in a sump condition on the Aspen Dental project site. Flow to the existing inlet was modeled as 0.45 and 1.58 cfs for the 2—year and 100-year storms respectively. The existing storm inlet drains to a 15-inch diameter storm pipe which drains to the north. The storm line intercepts drainage from the Countryside Animal Hospital site via an area inlet located in the northeast corner of the Animal Hospital property. The existing 15" storm line ultimately flows north to an existing 24" storm line which parallels the Sunstone drainage swale. The drainage swale is located north of the residential homes on Sunstone Drive. The swale and pipeline flow to the east to an existing detention pond constructed with the previous infrastructure improvements for the Sunstone development. Existing calculations from the above mentioned reports are shown in Appendix B. The project site is located within the Fox Meadows major drainage basin. There are no floodplains associated with the project. a: INORTHERN Final Drainage Report ENGINEERING Aspen Dental 1.0 Scope This preliminary drainage report has been prepared for the proposed Aspen Dental site, located at 3838 South Timberline Road in Fort Collins, Colorado. This report is intended to provide information regarding existing and proposed storm drainage including: • Historic drainage patterns for the site, including quantities of flow to the existing storm drainage system. • Proposed drainage patterns for the site. i• Proposed on -site water quality, and off -site detention for the site. 2.0 Design Criteria and References Drainage criteria outlined in the City of FortCollins Storm Drainage Design Criteria (SDDC) has been referenced in this study, and will be complied with at final design. I - The Rational Method has been used to estimate peak discharge rates in the initial and major storm events for proposed conditions in this study, and will also be used at final design to estimate peak discharge rates. The initial and major storm events are considered to be the 2-year and 100-year storm events, respectively. Runoff coefficients and rainfall values utilized in the Rational Method are consistent with the City of Fort Collins SDDC and will also be utilized at final design. 3.0 Site Location and Description The project site is located on the east side of Timberline Road between Caribou Street and Horsetooth Road, in Fort Collins, Colorado. The Aspen Dental site lies on Lot 7 of the Speights PUD subdivision. The Aspen Dental site is bounded on the north by the Countryside Animal Hospital, to the south by the Reflections Medical Spa, to the west by Timberline Road, and to the east by a residential neighborhood. The major east -west running street is Horsetooth Road located to the north of the development and Caribou Drive to the south. 1 I I TABLE OF CONTENTS I 1.0 Scope 1 2.0 Design Criteria and References 1 3.0 Site Location and Description 1 4.0 Historic Drainage and Maior Drainage Basin 2 5.0 Proposed Development 3 6.0 Proposed Drainage Plan 3 7.0 Proposed Detention and Water Quality 5 8.0 Temporary Erosion Control 8 9.0 Conclusions 8 1 APPENDIX APPENDIX A - VICINITY MAP APPENDIX B - PREVIOUS DESIGN REPORT INFORMATION APPENDIX C - RATIONAL CALCULATIONS APPENDIX D - DETENTION AND WATER QUALITY POND CALCULATIONS APPENDIX E - STORM SEWER CALCULATIONS APPENDIX F - MISCELLANEOUS CALCULATIONS MAP POCKET I �I i NORTHERN J14E I ENGINEERING ADDRESS: PHONE: 970.221.4158 200 S. College Ave. Suite 100 Northern E N Fort Collins, CO 80524 FAX: 970.221.4159 orthernEngineering.com iCity of Fort Collins Stormwater Utility 700 Wood St. Fort Collins, CO 80521 May 5, 2009 RE: Final Drainage Report Aspen Dental Dear Stormwater Staff: Northern Engineering Services, Inc. is pleased to submit this Final Drainage Report for the Aspen Dental Clinic site in Fort Collins, Colorado. In general, this report serves to outline the overall drainage design for the site in accordance to the concepts outlined in the Speights PUD Final drainage report, prepared by Northern Engineering in June of 1992. We understand that review by the City is to assure general compliance with standardized criteria contained in the City of Fort Collins Storm Drainage Design Criteria. If you should have any questions or comments regarding this report, please feel free to contact us at your convenience. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Cinde Welken, PE Design Engineer I I Final Drainage Report for Aspen Dental Care . 3838 South Timberline Road Fort Collins, CO May 5, 2009 Prepared for: Aspen Dental Prepared By: M INORTHERN ENGINEERING 200 South College Ave., Suite 100 Fort Collins, Colorado 80524 Phone: (970) 221-4158 Fax: (970) 221-4159 Project Number: 431-001