Loading...
HomeMy WebLinkAboutPOUDRE SCHOOL DISTRICT, EAST PROSPECT ROAD SERVICE FACILITY - ODP & APU - 44-08/A - REPORTS - TRAFFIC STUDYf a4e Schad PN/ _ld rrlp 4-eneratlm Study - Malntenaxe ad Wa-Aac-e Cadl1il pate of Study, Cebru g 2009 JGnfillneerI q ac il_�rai. ' ,. is /• .III 'li Time Gate Pass. Veh. BUSES I PSD VEHICLES OTHER TOTAL IN T OUT IN OUT IN OUT IN OUT IN OUT 4:004:15 1 2 7 8 0 1 0 0 0 11 7 2 0 2 0 0 0 0 0 0 0 2 3 0 1 0 0 1 0 0 0 0 1 Sub -Total 2 10 8 0 2 0 0 0 11 10 4:15.4:30 1 1 11 11 1 1 0 0 0 13 12 2 0 1 0 0 0 0 1 0 1 1 3 0 4 0 0 0 0 0 0 0 4 Sub -Total 1 16 11 1 1 0 1 01 14 17 430445 1 21 10 0 1 0 01 0 0 21 11 2 0 6 0 0 0 0 0 0 0 6 3 0 2 0 0 0 0 0 0 0 2 Sub -Total 2 18 0 1 0 0 0 0 2 19 445-500 1 0 13 13 0 0 0 0 0 13 13 2 0 3 0 0 0 1 0 0 0 3 3 0 3 0 0 0 0 0 0 0 3 Sub -Total 0 19 131 01 0 1 0 0 13 19 5:00-5:15 1 0 10 2 0 0 0 0 0 2 10 2 0 3 0 0 0 0 0 01 0 3 3 0 8 0 0 0 0 0 0 0 8 Sub -Total 0 21 2 0 0 0 0 ,:;0 2 21 5.15-530 1 0 13 4 0 0 0 0 0 4 13 2 0 2 0 0 0 0 0 0 0 2 3 0 9 0 0 0 0 0 0 0 9 Sub -Total 0 24 4 0 0 0 0 0 4 24 5:30 -5:45 1 0 3 3 0 0 0 0 0 3 3 2 1 0 0 0 0 01 0 0 1 0 3 0 1 0 0 0 0 0 01 0 1 Sub -Total 1 4 0 0 0 0 0 0 4 4 5:45 - 6:00 1 0 5 2 0 0 0 0 0 2 5 2 0 1 0 0 0 0 0 0 0 1 3 0 0 1 0 0 0 0 0 1 0 Sub -Total 0 6 3 01 0 0 0 0 3 6 ELB Engineering. LLC 5401 Tmlor L me Fort Collins. CO 80528 Phone: 970-988-7551 1 FAX 970-225-8942 ELBEngineeringir"Za 1pbroadbandnet '�MEW . w . % i 1rlp amera*a1 Study - Ma1n(6fLa',L�e ad Wa-4#wse Cx11ff# Pam- of5[udy: Pebfn g 2ccq 51peng1ieerIn uc Man/w Pea( fair (7,00 - 9.,00A41) Time Gate PV BUSES PSD VEHICLES OTHER TOTAL Pass. Veh. 1 3 0 IN OUT IN OUT IN OUT IN OUT 7:00-7:15 0 13 0 0 0 0 3 13 2 2 0 0 0 0 0 0 0 2 0 3 4 1 0 0 0 0 0 0 4 1 Sub -Total 9 1 0 13 0 0 0 0 9 14 7.15-7: 30 1 7 0 2 5 0 5 0 1 9 11 2 5 0 0 0 0 0 0 0 5 0 3 1 0 0 0 0 0 0 0 1 0 Sub -Total 13 0 2 5 0 5 0 1 15 11 7:30-7:45 1 7 0 3 6 3 8 0 0 13 14 2 3 0 0 0 0 1 0 0 3 0 3 2 0 0 0 0 0 1 1 3 1 Sub -Total 12 0 3 6 3 9 1 1 19 15 7:45-8:00 1 2 0 2 3 1 9 0 0 5 12 2 3 0 0 0 0 2 0 0 3 0 3 2 0 0 0 0 0 0 0 2 0 - Sub -Total 7 0 2 3 1 11 0 0 10 12 8:00-8:15 1 4 0 5 0 02 0 0 9 2 2 6 0 0 0 0 0 0 0 6 0 3 3 1 0 0 0 3 0 0 3 1 Sub -Total 13 1 5 0 0 5 0 0 18 3 8:15-8:30 1 2 5 6 3 3 1 1 0 12 9 2 1 0 0 0 1 0 0 0 1 0 3 1 1 0 0 1 0 1 0 2 1 Sub -Total 4 6 6 3 5 1 2 0 15 10 8:30-8:45 1 1 5 9 1 1 3 0 0 11 9 2 4 0 0 0 1 0 1 1 5 1 3 1 1 0 0 0 0 0 0 1 1 Sub -Total 6 6 0 1 2 3 1 1 17 11 8:45-9:00 1 1 5 6 1 2 4 0 0 9 10 2 1 1 0 0 0 1 0 0 1 1 3 1 1 0 0 0 0 1 0 2 1 Sub -Total 3 7 6 1 2 5 1 0 12 12 ELB Engineering, LLC 5401 Taylor Lane Fort Col ins. CO 80528 Phone: 970-988-7551 1 F.4.Y: 970-215-8942 ELBEngineering@dpbroad band. net AMNPIX A ELB Engineering, LLC 5401 Taylor Lane Fort Collins. CO 80528 Phone: 970-988-7551 1 FAX 970- 25-8942 ELBEngineering@lpbroadband net The Table below compares the estimated trip generation to the actual traffic counts that were conducted at the existing site. As can be seen from the table, the actual total trips in the morning peak hour were exactly the same as the estimate. However, the distribution between the ingress and egress varied. The afternoon peak hour actual counts were nearly identical to the initial estimate found in the TIS. It is also noted that the afternoon peak hour is the most critical since the traffic volume on the adjacent side streets is at its peak during this time. F,'V 1rlp Gewra&m Cmmparlsam (e5&mate vs, actaal) AM PM Trip Generation F7fAL IN F fOT—X IS �511MAT� 891 191 108 2,4 7� 99 ACTUAL COUNTED 53 55 I08 3I 1 771 105 DIFFFIZENCE (from 65timate? 36I1 0 -711 9 Recommendation It is recommended that the original estimate used in the December 2008 TIS for the PSD project be used for the traffic analysis. This recommendation is based on the following: • In terms of real numbers, the actual counts are very close to the estimate. • The actual counts contain traffic from other uses that are not associated with the project. • The use of the estimates will provide for a more conservative analysis of the project. • It is not likely that using the actual counts will change the results of the analysis. ELB Engineering. LLC 4 5401 Taylor Lane Fort Collins, Co 80528 Phone:9i0-988-7551 FLY.-9,'0-22.i-89J2 ELBEngineerurg'ujlpbrtntdbmrd. net The only issue with the three locations is that it will result in an "over count" of the actual number of trips that will be generated by the proposed project. The proposed project is specifically the warehousing operation and the bus and vehicle maintenance facility. The driveways that have been counted as part of this exercise will pick up some traffic from the following PSD uses: • IT Technology Center/staff development • Operations Center Johnansen Support Services Center • Security Nevertheless, since there is not a practical way to separate the various uses from the driveway counts, it was determined that the traffic counts obtained would be a conservative number to use for analysis purposes. Actual Traffic Counts Traffic counts and vehicle classifications were obtained on February 4, 2009. The counts were conducted in 15-minute increments for the 2-hours periods described on page two of this memorandum. The peak hours were determined to be: • 7:00 — 8:00 AM, and • 4:15 — 5:15 PM The raw data counts are provided in Appendix A. The vehicle classification used is as follows: • Privately -owned passenger vehicle/pick-ups • School Buses • PSD Service vehicles (vehicles with PSD logo) • Other — outside vendor trucks The summary of the peak hour totals are presented in the Table below. Pass. Vehicle BUSES OTHER TOTAL OUT IN OUT IN OUT IN OUT 41 1 7 27 1 2 53 55 on 38.89% 31.48% n 2.78% 100.00% =HourIN 3 74 26 2 3177 on 71.30% 25.93% 0.93°k 100.00% ELB Engineering, LLC 3 5401 Taylor Lane Fort Collins. CO 80528 Phone: 970-988-7551 1 FAA'.- 970-225-894. ELBFrtginceringL 1pbroadbtu1d.net Daily I ENTER AM EXIT ENTER PM EXIT Code Use units I ate I trips rate trips rate trips rate trips rate trips employee t Warehousing 25 3.89 97 0.37 9 0.14 4 0.21 5 1136 10 110 li ht industrialmeet services - Poudre Schooi District 215 3.02 649 0.37 60 0.07 15 0.09 19 0.3 65 TOTAL TRIPS 747 69 19 2 75 As can be seen from the table, it was estimated that the two land uses in question would generated approximately 108 morning peak hour trip ends and 99 afternoon trip ends. Methodology for Revised Trip Generation Estimates A methodology was derived to determine the trip generation of the proposed land uses. It was decided to count the three driveways of the current operations on Laporte Avenue during the peak hours of 7:00 — 9:00 AM and the 4:00 — 6:00 PM. The three driveway locations are displayed in Figure 1. SNUM-M aaaaaa•Tia.*Wr tT Ilea tlaa orelio eamaeelseo.ei Taeuaaq� aarrna•aa..aram ay. aeatw.raRaia caauarr . A{ a rewaq lee leraraaa.alas uar�e Va1N.ilairran.r Seem saa+ly 011111111110 4 YNM Y lan a&IIII.a1111T kaawaa ae Meader YaePsa fl'tiM aq rroarr o.laarr�eWse Fertrr. �o.yra (bYlebn T eer. r laerMRa BMIOMa P a.eea. a .limt aT' r-ATF Y7 _.. _ a fEC 3• t 9' JSSC r.ATs in 2 * sv ~ w ® .1 D J(WtL1N5CN 5liiOdlTS°RNLC9 CEIfiCR �>iSGI • FaWer - ACL.I..Rtaw� o! CIatlIM CNa+Ne.. _ Car.a`dlva � Ovleol lervka !4/MM.YAw.bn aW.ala.N.r. 6mq.ry a.Na.v 9:maYaraa. Figure I; Traffic Count Locations ELB Engineering. LLC Z S401 Taylor Lane Fort Collins. CO 80518 Phone: 970-988-7551 1 FAY: 970-215-8941 ELBEngineering 1pbroadband.ner �B�tneenng, IZC. Transportation EnBineerinB,Solutions Memorandum - DRAFT TO: Ms. Tammie Simpson, PSD Project Manager 9p REr Mr. Joe Olson, Traffic Engineer, COFC �'�RCNC� Sr r' FROM: Eric L. Bracke, P.E., P.T.O.E 8 �` K1fAl�• DATE: February 10, 2009 SUBJECT: PSD Maintenance Facility Trip Generation Validation Background The Poudre School District in Fort Collins, Colorado is proposing to construct a new vehicle/bus maintenance facility, warehousing facility, and a new school on a parcel of property adjacent to Prospect Road and Larimer County Road 5. The project would also consist of the Larimer County vehicle maintenance facility. The PSD vehicle maintenance and the warehousing uses are existing uses of PSD currently being conducted at the facility located on Laporte Avenue. A Transportation Impact Study (TIS) was prepared by ELB Engineering, LLC in December 2008 and submitted to the City of Fort Collins for review and comment. During a recent neighborhood meeting hosted by the City of Fort Collins, a local resident suggested that the trip generation estimates used in the Transportation Impact Study were not valid and suggested that the trip generation estimates be reviewed. The City supported the suggestion and this memorandum addresses the issue as it pertains only to the warehousing facility and the vehicle/bus facility of PSD. Trip Generation Estimates The trip generation estimates used in the initial TIS were derived from Manual of Trip Generation, 7th Edition, developed by the Institute of Transportation Engineers. The resource is the accepted resource for developing trip generation estimates as documented in the Larimer County Urban Area Streets Standards, Chapter 4 as well as a nationally accepted resource. The table on the following page shows the trip generation for the two proposed land uses as described in the TIS of December 2008: ELB Engineering, LLC 5401 Taylor Lone Fort Collins, CO 80528 Phone: 970-988-7551 j FAA-: 970-225.894' ELBEngineeringrii),Iphroadband net