Loading...
HomeMy WebLinkAboutPOUDRE SCHOOL DISTRICT, EAST PROSPECT ROAD SERVICE FACILITY - ODP - 44-08 - CORRESPONDENCE - ENVIRONMENTAL REPORTJanuary 15, 2009 Barb Farrell Email address: bbfarrell@msn.com Re: Email communication regarding the Poudre School District/Larimer County Joint Service Facility ODP Application Dear Barb, Thank you for your emails voicing your concerns regarding the PSD project located at the northwest corner of East Prospect Rd. and County Road 5. The City is currently reviewing the project as an Overall Development Plan (ODP). My responsibilities for reviewing an ODP application are limited to ensuring that all future development on the property complies with Section 3.4.1 — Natural Habitat and Features, of the Land Use Code (LUC). You can access the relevant section of the LUC on-line at the following link: hftp://www.colocode.com/ftcollins/landuse/article3.htm#div3d4 During the review of the project plans, I conducted two site investigations to become familiar with the ecological character of the property. Based upon my site visits and review of available literature, I have determined that the site, except the Cache La Poudre Reservoir Inlet Canal, is devoid of any ecological character. The property has been used for crop production over the years and remains an empty piece of property. Thus, the canal is the only feature on the site that will be protected under Section 3.4.1(E) of the LUC. In your most recent email, you formally requested that the City conduct an environmental study of the site due to numerous environmental concerns. Under Section 3.4.1(D), the Director may require an Ecological Characterization Study (ECS) be prepared for the site under review. If an ECS would be required, the applicant would be responsible for preparing said study, not the City. As stated in the previous paragraph, with the site predominantly devoid of any ecological character, the City will not be required an ECS be prepared as part of any development review. If you feel that there are compelling reasons to have the City require an ECS for the site, you will need to provide any pertinent information as required in Section 3.4.1(D). If you wish to pursue your concerns in such a manner, I can provide you with the name of several firms that routinely conduct ECS for review by my office. Once again, thank you for your email regarding the PSD project. Please contact me if you wish to follow up on my response in any manner. Regards, Dana Leavitt, ASLA Environmental Planner City of Fort Collins 970-224-6143 dleavitt Dfcgov.com cc: T. Shepard S. Dush PrejWA&