HomeMy WebLinkAbout216 S. GRANT AVE., ACCESSORY BLDG. W/HABITABLE SPACE - PDP - 10-07 - CORRESPONDENCE - (3)Department: Zoning Issue Contact: Jenny Nuckols
Topic: ZOMIVG
Number: 1 Created: 5/ 10/2007
[5/ 10/07] Will require a modification for the setbacks. Five foot rear and
side setbacks are required but only 2'9" is being shown.
Number: 2 Created: 5/ 10/2007
[5/ 10/07] What is the total square footage of the new building?
Number: 3 Created: 5/ 10/2007
[5/ 10/07] What is the square footage of the existing house and the lot?
Number: 4 Created: 5/ 10/2007
[5/ 10/07] Please show and note lot lines and lot dimensions
Number: 5 Created: 5/ 10/2007
[5/ 10/07] What is the square footage of the existing garage?
Be sure and return all red -lined plans if/when you re -submit prior to the
Administrative Public Hearing (to be scheduled for a date 8s time in the near
future) or when you submit the required Final Compliance documentation
for review.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
A"49W
Steve Olt
City Planner
cc: Susan Joy
Planning & Zoning file # 10-07
Page 3
Number: 7 Created: 5 / 21 / 2007
[5/21/07] Please dimension the existing right-of-way (ROW) for both South
Grant Avenue and the alley, and the driveway and sidewalks.
Number: 8 Created: 5 / 21 / 2007
[5/21/07] Please use the engineering scale (the drawing has to be scalable).
Topic: General
Number: 14 Created: 6/ 1/2007
[6/ 1/07] Stormwater and Engineering have agreed that a Site/Landscape
Plan is sufficient and we will not require a Utility Plan set. However, to
avoid problems pulling your building permit later, we will want to have 3
paper copies of the final signed mylar submitted for distribution. Since no
Utility Plans will be filed, there is no other way for the certain departments
to know that you have submitted any plan set whatsoever so that they can
release the hold on your building permit. Thanks : )
Topic: Tech Services
Number: 11 Created: 5 / 29 / 2007
[5/29/07] From Technical Services:
1. Needs lot description - (Lot XX, Block XX of ?? Subdivision).
2. Dimension lot; and, how do you know that the north fence is the lot
line?
3. Dimensioning should be consistent (feet and inches or decimal feet).
From Engineering - we actually require the plans to be submitted in
engineering scale (decimal feet).
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 13 Created: 5 / 30 / 2007
[5/30/071 PFA has no comments or concerns at this time.
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 10 Created: 5 / 29 / 2007
[5/29/071 No comments.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/WW
Number: 9 Created: 5/ 29 / 2007
[5/29/07] Show location of the existing water/sewer services to the existing
house and the new water/sewer lines extending to the accessory building.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Tim and Janet McTague
216 South Grant Avenue
Fort Collins, CO 80521
Date: 06/ 01 / 2007
Staff has reviewed your submittal for 216 South Grant Avenue, Accessory
Building with Habitable Space, PDP - Type 1, and we offer the following
comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 12 Created: 5/ 29 / 2007
[5/29/071 Don Kapperman of Comcast Cable TV indicated that utility
easements (existing & proposed) should be shown in the alley way.
Number: 15 Created: 6/ 1 / 2007
[6/ 1 /07] On May 31, 2007, the Applicants submitted a request for
Modifications of Standards set forth in Sections 4.7(E)(3) and 4.7(E)(4) of the
Land Use Code dealing with side and rear lot line setbacks. This request is
being reviewed and evaluated by City staff, and a recommendation will be
made to the Administrative Hearing Officer at such time an administrative
hearing date is set.
Number: 16 Created: 6/ 1 /2007
[6/ 1/07] City staff has determined that this development proposal can be
scheduled for an administrative public hearing for a date & time to be
established by the Hearing Officer, City planner, and the Applicants. Steve
Olt will assist you with the scheduling.
Department: Engineering
Topic: Engineering
Number: 6
[5/ 21 / 07] Please add this note:
Issue Contact: Susan Joy
Created: 5 / 21 / 2007
"General Construction Notes # 1 through 18, 20 through 39, and 42 through
46 as listed in Appendix E-1 of the Larimer County Urban Area Street
Standards (LCUASS) shall apply and be followed for this project."
"The Construction Notes under subsection Street Improvement Notes and
Traffic Signing, and Pavement Marking Construction Notes in Appendix E-2
of the Larimer County Urban Area Street Standards (LCUASS) shall apply
and be followed by this project as applicable."
Page 1