HomeMy WebLinkAboutRIGDEN FARM, 15TH FILING - PDP - 11-09 - CORRESPONDENCE - (4)Number:10 Created:2/24/2009 Pending [2/24/09] In Fort Collins, 6-inch sewers would be private service lines not public sewers. If the service for Lot 2 is tied into the MH at the end of the 8-inch stub, all three 6-inch lines would be private services which would be allowed provided easements were granted on Lot 2 for the services to Lots 1 and 3. Minimum grade on a 6-inch is 1% not 0.4%. CLC Response: The sanitary sewer line has been modified to a 6" and designated as private. Slopes have been modified to be greater than 1%. Number:11 Created:2/24/2009 Pending [2/24/09] At final compliance, include the applicable standard details. CLC Response: Noted. Please see attached comments from the Post Office. CLC Response: Post Office comments have been addressed. We appreciate your review and assistance with this project. We look forward to your review and subsequent approval. Should you have any questions please give me a call. Regar , Daniel Madruga, P.E. Manager, Denver Engineering CLC Response: The Site Plan shows a dashed line identifying the turning radii required at all curb returns on the site. Number:26 Created:2/25/2009 Pending FUTURE PROJECTS: Please note that additional fire comments likely will be provided based on future, proposed structures. CLC Response: Noted. Department: Transportation Planning Issue Contact: Jennifer Petrik Topic: General Phone: (970)416-2471 Number 27 Created:2/25/2009 Pending [2/25/09] An access easement will be required for the private sidewalk. An easement will also be required for the section of sidewalk located on the Church property. CLC Response: A .six foot access easement has been provided for the sidewalk. Number:28 Created:2/25/2009 Pending Please make the sidewalk connection to the pedestrian ramps more organic to fit a more natural traveled path for wheel chairs, pedestrians etc... The current angle is sharp and would be difficult to maneuver. CLC Response: The pedestrian ramps have been modified to better fit the natural traveled path. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Phone: (970)221-6854 Number:7 Created:2/24/2009 Pending [2/24/09] The 8-inch water main that is stubbed onto the site must be abandoned at the main. It is not allowed to reduce water main to a small water service. Add notes to remove valve and install plug and thrust block. CLC Response: The existing 8-inch water stub to the site will be utilized for the additional fire hydrant requested by PFA. Number:8 Created:2/2412009 Pending [2/24/09] Move the water service for Lot 1 to the west so that it is on Lot 1. The water service must be straight and perpendicular to the main from the main through the curb stop and meter pit. CLC Response: The water service for Lot 1 has been relocated to be perpendicular to the main. Number:9 Created:2/24/2009 Pending [2/24/09] Discussion is needed on water service sizes. Total fees relating to a 2-inch service are nearly $181,000. and it is unlikely that a 2-inch is needed for these relatively small sites. Most sit-down restaurants would not even need a 2-inch. Office or retail uses would probably only use a 3/4-inch or 1-inch. CLC Response: Noted. CLC Response: Noted. Department: PFA Issue Contact: Carle Dann Topic: Fire Phone: (970)416-2869 Number:23 Created:2i25/2009 Pending WATER SUPPLY: Fire hydrants. where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: Commercial, 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter; residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter; residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. PLEASE NOTE: Applicant will need to install an additional fire hydrant internal to the project (adjacent to private drive). Please contact me about an approved location for this hydrant. Also, because of the size of the water main, hydrants in the area should meet minimum flow requirements and does not need a flow test. 2006 International Fire Code 508.1 and Appendix B. CLC Response: One additional fire hydrant has been provided at the end of the existing 8" water stub for the site. Number 24 Created:2/25/2009 Pending REQUIRED ACCESS: Fire access roads (fire lanes) shall be provided for every facility, building :or portion of a building hereafter constructed or moved into or within the PFA's jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: • Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. • Have appropriate maintenance agreements that are legally binding and enforceable. • Be designated on the plat as an Emergency Access Easement. • Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structures are three or more stories in height). If the building is equipped throughout with an approved automatic fire -sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. PLEASE NOTE: The area shown as Public Access must also be designated on the plat as an Emergency Access Easement (EAE). Thank you for showing the3 FIRE LANE - NO PARKING signs. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D CLC Response: An Emergency Access Easement has been provided. Number 25 Created:2/25/2009 Pending TURNING RADII: The required turning radii cf a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside 2006 International Fire Code 503.2.4 and Appendix D103.3 /designed in the plan sets before the project may go to hearing. All other applicable items must be completed in Final Compliance and prior to final plan approval. CLC Response: Noted. Number:18 Created:2/25/2009 Pending [2/25/09] Please show the approximate location of the street cut on the utility sheet in accordance with Chapter 25 of LCUASS and add the street cut note: Limits of street cut are approximate. Final Limits to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. CLC Response: The limits of street cut have been shown on the Utility Plan. The additional language has been added to Note #10 on the Utility Plan. Number 30 Created:2/27/2009 Pending [2/27/091 Please remove note 1 from the utility plan cover sheet. It is referring to itself? CLC Response: This note has been removed. Number: 31 Created: 2/27/2009 Pending [2/27/091 Please remove the public lands survey section line as that line weight doesn't appear to be used anywhere on this project. CLC Response: This line has been removed. Number:33 Created:2/27/2009 Pending [2/27/09] Please remove the site plan from the utility set or did you mean this to be more of a horizontal control plan? CLC Response: The Site Plan has been removed from the utility set. Number 34 Created:2/27/2009 Pending [2/27/09] Please show removals and approximate street cuts. Please note that if the existing curb and gutter can not be removed in such a way that the street asphalt is not damaged, then all street patching must be done in accordance with city standards. Just an fyi... that means that the street patch occurs at the lane line or in the middle of the travel lane when a cut is made parallel to the curb and gutter. CLC Response: Limits of street cut ,have been shown on the Utility Plan. Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power Phone: (970)224-6152 Number:2 Created:2/11/2009 Pending [2/11/09] The developer will need to coordinate a location for the electric transformer for the bank with Light & Power Engineering (221-6700). CLC Response: Noted. Number:3 Created:2/11/2009 Pending [2/11/09] A significant portion of the Light & Power charges has been previously paid. The remaining L&P charges plus the cost to relocaie the streetlight will apply. CLC Response: All easement call outs have been modified to match the Plat. Number:20 Created:2/25/2009 Pending / [2/25/09] Please see Matt Baker for repays due for Timberline, Custer and Illinois street improvements and those amounts will be due at the time of building permit. While there won't be a need for a building permit with this application, it's just something to keep in mind when you're ready to submit the actual project. CLC Response: Noted. Number:35 Created:2/27/2009 Pending ✓[2/27/09] Project name needs to match on the plat and utility plan. You can not name them two different things. CLC Response: The project name has been changed on the PDP to match the Plat. Topic: Plat Number 19 Created:2/25/2009 Pending [2/25/09] Please use the lighter grey scale for all existing features and the darker line weight for proposed. For instance, the utility sheet shows proposed work in grey scale when in fact they should be the darker line weight. The water line in the street is shown in a dark line weight and labeled as existing. The existing record easement line and the utility easement dedicated by plat line are too similar and are almost indistinguishable from one another. CLC Response: Line weights have been corrected. /Number:32 Created:2/27/2009 Pending �/ [2/27/09] Please define all abbreviations used on the plat. CLC Response: Abbreviations have been defined on the Plat. ZNumber: 36 Created:2/27/2009 Pending [2/27/091 Please remove all shading per Appendix A of LCUASS. CLC Response: Shading has been removed. v`Number:37 Created:2/27/2009 Pending [2/27/09] Please correct the Surveyor's Statement. Add in a signature line and correct the line after the Frank's name to read: Colorado Registered Professional Land Surveyor # CLC Response: The Surveyor's Statement has been modified. Number:38 Created:2/27/2009 Pending [2/27/09] Please correct the first paragraph of the Statement of Ownership. I can email that document to you if you email the request to me at sjoy@fcgov.com CLC Response: The Statement of Ownership has been modified. Topic: Utility Plans Number:4 Created:2/24/2009 Pending (2/24/09] Please see LCUASS for all utility plan requirements and go through and complete all highlighted items in Checklist E-4 with the next round of review. All highlighted items must be i V1111,'Number: 6 Created: 2/24/2009 Pending [2/24/09] Please see Transportation Planning for onsite sidewalk requirements. CLC Response: Noted. Number:12 Created:2/25/2009 Pending [2/25/091 9' Utility easements are required at the back of row along Custer and Illinois Drive and 15' along Timberline. VI/ CLC Response: The PDP drawings have been modified to correctly call out the 9 foot utility easements along Custer and Illinois Drive and the 15 foot easement along Timberline. Number:13 Created:2125/2009 Pending �[2/25/09] Please remove all information regarding Lot 1 as this project has not been submitted, reviewed or approved at this time. CLC Response: All information regarding Lot 1 has been removed from the plan sheets. Number 14 Created:2/25/2009 Pending �t [2/25/09] Is there an access easement on the Timberline Church property allowing access to their private driveway? If not, one will be needed before this development can be approved. A letter of intent to grant this easement signed by the Church property owner will be required prior v to hearing and the actuai easement itself will be required prior to final plan approval. v CLC Response: We acknowledge this requirement. We are currently in negotiations with the Church regarding this issue. We will have an agreement before final acceptance. Number.-15 Created:2/25/2009 Pending [2/25/091 This project proposal is a little difficult to review since there is no actual use proposed with this site. My comments at this time are fairiv limited but picase realize that when an actual site is proposed, the driveway locations, easements and layout will be reviewed at that time and subject to all current standards and codes. In other words, platting the project now does not guarantee locations of driveway cuts or that additional easements won't be required such as emergency access easements, access easements, etc, or that the platted easements today will work with the future use. You MAY have to vacate or dedicate additional easements with the future proposal. Those can be done with another replat or by separate document. Dedications or vacations done by separate document do have additional TDR Fees for each one. I just wanted to make sure that you were aware of the potential comments in the future so that you can plan ahead'as much as possible and most important, didn't get any surprises when this site comes back in again. CLC Response: Noted. Number:16 Created:2/25/2009 Pending [2/25/09) There is a 25' wide temporary siope easement dedicated off the back of Timberline... what triggers the vacation or termination of the easement? CLC Response: The 25 foot easement is not intended tc be vacated with this project. The slope easement is not within the boundaries of this project. Number:17 Created.2/25/2009 Pending [2/25/09] The easements do not inatch, fron" p'a, to utility plan.. m ELC CLC ASSOCIATES March 18. 2009 Emma McArdle City Planner City of Fort Collins 281 N. College Avenue Fort Coiiins, CO 80522 Ms. McArdle: Please find responses to comments regarding the Rigden Farm, First Filing Tract A Replat. Our responses to each of the City's comments are below in italics. RIGDEN FARM, FIRST FILING TRACT A REPLA T PDP - TYPE I SELECTION CRITERIA: Status = Unresolved ISSUES: Department: Current Planning Issue Contact: Dana Leavitt Topic: Plat Phone: (070)224-6143 Number 21 Created:2.25/2009 Pending [2/25/09] The following note shall be added to the Plat: Pursuant to Section 12-122. Promotion of conservation of the Municipal Code, No person shall create, cause to be created, enforce or 41 seek to enforce any provision contained in any restrictive covenant which has the effect of prohibiting or limiting the installation or use of Xeriscape landscaping, solar/ photo -voltaic collectors (if mounted flush upon any established roof line), clothes lines (if located in back yards), or odor -controlled compost bins, or which has the effect of requiring that a portion of any individual Ict be planted in turf grass. CLC Response: This note has been added to the Plat Department: Engineering Issue Contact: Susan Joy Topic: General Phone: (9701221-7656 Number 5 Created:2;?4/2009 Pending [2/24/09] All driveways must be constructed in accordance wit'! LCUASS detail 707. Curb return radii must meet LCUASS table 8-2 requirements. CLC Response: All driveways have been designed in accordance. with LCUASS detail 707. The note on the plan (ncte #3) has been modified to reference detai1707. Per a phone conversation between Armstrong Development and Susan the Driveways are classified as high volume driveways and the curb radii should be 15'. However teased on additional comments from PFA, a 15' radius would not aceommuo3te a 25.'. tui rnnq radius for the fire trucks. The driveway curb radii have been left at 20`. 8480 E. ORCHARD ROAD -SUITE 2000 -GREENWOOD VILLAGE - CO - 80111 - P 303 770 5600 - F 303 770 2349 DENVER - PHOENIX - SALT LAKE CITY - SPOKANE 2 hod. cb�wA