HomeMy WebLinkAboutHIDDEN POND ESTATES - PDP - 11-07 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTINTERWEST C O N S U L T I N G G R O U P
` August 15, 2007
\
Basil Harridan
City of Fort Collins Stormwater
700 Wood Street
Fort Collins, CO 80522-0580
RE: Final Drainage and Erosion Control Report for Hidden Pond Estates Subdivision
Dear Basil,
I am pleased to submit for your review and approval, this Final Drainage and Erosion Control
Report for Hidden Pond Estates Subdivision. I certify that this report for the drainage design was
prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual.
I appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Sincerely,
Michael Oberlander, P.E., L.S.I. F' U 4261
ii
1218 WEST ASH, SUITE C WINDSOR, COLORADO 80550
TEL 970,674.3300 • FAX. 970.674.3303
N
FINAL DRAINAGE AND EROSION
CONTROL REPORT
I Hidden Pond Estates Subdivision
Prepared for:
Beld Developments, LLC
6215 Westchase Road
Fort Collins, Colorado 80528
Prepared by:
Interwest Consulting Group
1218 West Ash, Suite C
Windsor, Colorado 80550
(970)674-3300'
Revised August 15, 2007
May 7, 2007
Job Number 1055-039-00
0
LJ
w
w
ja
SITE
E. HARMONY RD.
HIDDEN POND ESTATES VICINITY MAP
SCALE: 1 " = 1000'
APPENDIX A
VICINITY MAP
A
6.2 Drainage Concept
The proposed drainage concepts presented in this report and on the construction plans
adequately provide for stormwater quantity and quality treatment for the proposed
project. Conveyance elements have been designed to pass required flows and to
minimize future maintenance.
If, at the time of construction, groundwater is encountered, a Colorado Department of
Health Construction Dewatering Permit will be required.
7. REFERENCES
1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March,
1986.
2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria
Manual", Volumes 1 and 2, dated June 2001, and Volume 3 dated September
1999.
9
5. EROSION CONTROL
0 5.1 General Concept
This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort
Collins Zone Maps. The potential exists for silt movement from the site and into the
existing drainage areas on the west and north sides of the site. Potential also exists for
tracking of mud onto existing streets which could then wash into existing storm systems.
The required performance standard for the site 83%. During construction and after final
paving and building construction, this figure is exceeded with the use of silt fence, wattle
checks, inlet protection on the upstream ends of culverts, buried riprap, vegetation, and by
using the new detention and water quality pond and a sediment trap during construction.
The erosion control escrow amount is $10,950
5.2 Specific Details
To limit the amount of silt leaving the site several erosion control measures shall be
implemented during construction. Wattles will be used where appropriate (in ditches,
swales and culvert entrances) and the boundaries of disturbance will have silt fence
installed. A vehicle tracking pads will be installed at the proposed drive connection to
Ziegler Road to control the mud being tracked onto the existing pavement. During
overlot grading, disturbed areas are to be kept in a roughened condition and watered to
reduce wind erosion. The proposed detention and water quality pond (Pond C) will be
used as a sediment trap during construction. All disturbed areas not immediately built
upon shall be seeded and mulched. This site is more than one acre and does require a
State of Colorado Stormwater Discharge Permit Associated with Construction Activities
prior to beginning work.
6. CONCLUSIONS
6.1 Compliance with Standards
All computations that have been completed within this report are in compliance with the
City of Fort Collins Erosion Control Reference Manual for Construction Sites and the
Storm Drainage Design Criteria Manual.
8
El
will release 0.8 cfs (0.18 cfs per acre) in the 100-year storm No new penetrations will be
needed into the ditch, no work will be done in the FCRID right-of-way.
Pond C only has 00.8' of freeboard between the 100-yr water surface elevation and the
top of the proposed berm. The pond cannot effectively be made bigger because of efforts
to limit disturbance in the Natural Areas Buffer. The spillway is 0.2' about the 100-yr
water surface elevation, so there is about 15% excess capacity in the pond before the
spillway would be used.
U Basin 7 includes the area that will sheet flow to Pond C. This area just includes a couple
of new lots in this basin; no common conveyance is required to the pond.
Basin 8 includes the east portion of the site and the outside of the detention pond
embanlanent. There is no way to detain this area, so it will free release (as it does today)
into FCRID. This basin is only 1.71 acres, and is completely pervious, but still
contributes 2.3 cfs to FCRID in the 100-year storm. This rate has been reduced from the
3.9 cfs allowed for the entire 17.0 acre site and is the reason for utilizing retention in
Pond A and overdetaining in Pond B and C.
Basin 9 is in the far northeast portion of the site. This area drains southeast into the
existing irrigation crossing of FCRID and does not drain to the ditch. Because this area
does not contribute to the release from the ditch, there is no detention proposed for the
area — it will not be touched with the development of the subdivision.
4.3 Drainage Summary
All drainage facilities proposed with this project as well as the private drives will be
maintained by the Homeowner's Association. There are no public facilities proposed
with the development. The site drains to FCRID at a rate of 0.23 cfs per acre (3.9 cfs for
17.0 contributing acres).
again will only have a single cross slope allowing for a single ditch rather than ditches on
both sides.
Basin 4 includes the new lots that will drain to the roadside ditch and ultimately to Pond
B. The roadside ditch in this area drains to an area inlet and storm pipe (Storm Pipe 2),
and then into Pond B. Storm Pipe 2 has been lengthened to prevent developed flows
n from running down the steep embankment in this area.
Basin 5 includes several new lots which drain to the north as well as Pond B has a water
surface elevation of 4888.0 and is spring fed. It is proposed to install a water quality
structure and 8" storm pipe with a headwall and orifice plate at the 4888.0 elevation. The
plate will be designed to release 0.5 cfs (0.08 cfs per acre) and will drain on the south side
of the pond where it will eventually reach the existing culvert into FCRID. With these
structures in place the 100-year water surface will be at 4890.8. The current top of the
pond is at 4891.5 to 4892.0, but there is not a standard spillway on the pond. It is
proposed to build an appropriate spillway in the same vicinity as the outlet pipe at an
elevation of 4891.0. This is not a tall enough structure to be designated as jurisdictional,
so this work should require nothing more than City approval.
This pond only has 0.7' of freeboard between the 100-yr water surface and the top of the
berm. This is mostly because of the addition of water quality to the pond. The water
quality depth provided is only 0.5', but the volume is more than double what is required.
It is not possible to provide an outlet structure that will function with a shallower depth,
so the 100-year WSEL was raised along with the water quality elevation. The spillway
will be constructed in concrete (to double as a trail), so elevations should be exact with
the construction, and this variance from freeboard standards should not be an issue.
Basin 6 includes the south central portion of the site where now lots will be constructed
as well as the proposed detention and water quality pond (Pond Q. These lots drain east
via roadside ditches and overland flow to the proposed pond. The pond has been
designed to be long and slim, basically just providing a berm to hold water against the
existing slope from the east. The bottom of the pond varies from 1% to 20X0 and at this
time, a trickle pan is not proposed in the bottom of the pond. The pond will have a
standard water quality and detention structure and will drain to the existing ground on the
east side of the pond. This area then drains to an existing culvert into FCRID. The pond
6
presently drains south into an existing channel and into the irrigation pipe which flows
over FCRID. Since this land does not contribute to the ditch, it is not accounted for in
any detention calculations.
4.2 Specific Flow Routing
A summary of the drainage patterns within each basin is provided in the following
paragraphs.
V Basin 1 includes the north portion of the existing home site and the northwest corner of
the subdivision. This area all.presently drains overland to the existing dry pond in this
area (Pond A). This pond was a functioning irrigation pond, but the inflow was removed
and it is now dry and only supports some wetlands in the bottom. It is approximately 5
feet deep and all water that drains to the pond is retained until it evaporates or percolates.
It is proposed to leave Pond B as is with no improvements. Using the City's 3.67 inch
100-year rainfall and the rational method C value, there is approximately 0.35 acre feet of
water draining to this pond in a developed 100-year storm. The pond has double the
retention volume at a depth of 2.6 feet and at 5.0 feet deep has 1.36 acre feet of volume
available. With four times the necessary storage (and the constraint of existing wetlands),
it is proposed to not build any additional facilities in this area.
Basin 2 includes the existing road right-of-way. Improvements in this area include
. paving a 20' wide private drive and a 6' crusher fine path. A shallow roadside ditch will
be constructed on the south side of the drive to prevent water from flowing to the
property to the south. The north edge of the drive and trail will generally match the
location of the north edge of the existing gravel drive. The trail and drive all will slope
south (no crown). There will be no disturbance near the existing hedge between the road
and the homes to the north. The drive and ditch are designed at approximately 0.5%
because of the existing conditions and will act as a water quality feature by slowing flows
from the area. This area flows east and into Basin 3 and is ultimately detained in the
existing irrigation pond (Pond B).
Basin 3 includes the southern portion of the existing home site. Flows in this area will be
routed in a roadside ditch to a culvert crossing the private drive (Storm Pipe 1). The drive
1 5
4. DRAINAGE FACILITY DESIGN
4.1 General Concept
Only 50% of the site will be developed with the project, but the City stated in the
Conceptual Design Review Meeting that even the protected areas must meet the detention
requirements for the site (0.23 cfs per acre, or 3.9 cfs for the entire 15.4 acre site and 1.6
acre right-of-way). This poses significant challenges with the existing Natural Areas
Buffers on the site. Detention ponds are allowed within these buffers, but any significant
grading to route flows to the ponds is not allowed.
Because of the nature of the project (relatively large lots, and only 14 total), a private 20'
asphalt drive is proposed throughout the site for access. The drive will have roadside
ditches as required to achieve proper routing of the storm flows. The northeast portion of
the site will continue to drain overland to the existing dry pond. It is proposed to use this
pond as a retention pond and not disturb the pond or the buffer area in any way.
Typically, this would not be acceptable, but in this case, the existing pond has available
volume for about four times the runoff of a 100-year storm.
The right-of-way and central portion of the site will be routed through grass lined
roadside ditches and culverts to the existing irrigation pond on the north side of the site.
It is proposed to utilize the upper portion of this pond to overdetain this contributing area
to 0.07 cfs per acre. To achieve detention, a small water quality structure, orifice, plate
and pipe is proposed above the operating level of the pond. If the pond reaches this level,
it will release at a reduced rate to the east and into FCRID. It is proposed to add a
spillway to this pond.
The south central portion of the site drains to the east and into a new detention pond
proposed adjacent to FCRID. This pond overdetains the contributing area to 0.18 cfs per
acre. This pond will be designed with a standard water quality outlet structure. The
proposed pond discharges to existing grade and then to FCRID through an existing
culvert in the FCRID right-of-way.
All of the land east of the proposed detention pond free releases to FCRID. This area
contributes more than half of the allowed runoff for this site (which is the reason for the
other ponds retaining or overdetaining). The land in the northeast corner of the site
4
0 3. DRAINAGE DESIGN CRITERIA
3.1 Regulations
This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage
Design Criteria Manual" specifications. Where applicable, the criteria established in the
"Urban Storm Drainage Criteria Manual" (UDFCD), developed by the Denver Regional
Council of Governments, has been used.
3.2 Development Criteria Reference and Constraints
The runoff from this site has been routed to conform to the requirements of the Fox
Meadows Master Drainage Plan. The Plan specifies that this site is required to provide
_ Stormwater detention to a rate of 0.23 cfs per acre. Water quality facilities are required
for project.
3.3 Hydrologic Criteria
Runoff computations were prepared for the 2-year and 10-year minor and 100-year major
storm frequency utilizing the rational method. All hydrologic calculations associated
with the basins are included in Appendix B of this report.
Water quality volume was calculated using the method recommended in the "Urban
Storm Drainage Criteria Manual". Detention volume was determined using the
"Rational" or "FAA" method. All pond calculations are in Appendix D of this report.
3.4 Hydraulic Criteria
All hydraulic calculations within this report have been prepared in accordance with the
City of Fort Collins Drainage Criteria and are included in Appendix C of this report.
ditch. The areas that drain to the existing dry pond in the northwest comer of the site and
_ the areas that drain to the existing irrigation pond in the north -central portion of the site
do not have outfalls to FCRID. The dry pond is quite large and was once used for
irrigation storage, but the flow to the pond was cut off by the development to the west.
dAny runoff to this pond simply is held until it can evaporate or percolate into the ground.
The existing irrigation pond is spring fed and is in use. This pond has a head gate that
releases water to an overhead pipe crossing of FCRID and to the land to the east. There is
a small portion of land in the northeast corner of the site that also drains to the overhead
crossing. There are no existing storm drainage facilities for these ponds and they have
adequate volume to retain existing storms.
There are no mapped floodplains on the property.
It should be noted that it is the intent of the project to disturb as little of the landform as
possible to keep the integrity of the project. The grading and drainage plans basically
grade the roads, swales and the new detention pond, but not full overlot grading of all of
the home sites. With the final design, there will be additional design so that the lot to lot
drainage can be accomplished simply by the home builders, and minimum opening
elevations will be specified. It is the desire of the Planning Department, Natural
Resources Department, Historic Preservation and the Owner to try to limit the amount of
disturbance with the project.
2. DRAINAGE BASINS AND SUB -BASINS
2.1 Major Basin Description
The proposed development lies within the Fox Meadows Master Drainage Basin.
2.2 Sub -basin Description
The southern portion of the site drains to FCRID; the north portion of the site drains to
the existing ponds and to the existing overhead crossing of FCRID. These drainage paths
will be generally maintained with the project with some changes. No off site flows other
than the existing right-of-way enter the site.
2
1. GENERAL LOCATION AND DESCRIPTION
�1 1.1 Location
Hidden Pond Estates Subdivision is located in southeast Fort Collins. The project is
unplatted and located in the West Half of Section 33, Township 7 North, Range 68 West
of the 61h P.M. in the City of Fort Collins, Larimer County, Colorado. See the location
map in Appendix A.
The project area is approximately 15.4 acres and is south and east of Woodland Park
Estates PUD and north of the AVAGO campus (Hewlett Packard). The Fossil Creek
Reservoir Inlet Ditch (FCRID) is adjacent to the east. The site access is from an existing
private road right-of-way that connects to Ziegler Road on the west.
1.2 Description of Property
The project contains approximately 15.4 acres along with an existing 60' wide right-of-
way connection to Ziegler Road which includes about 1.6 acres. There is an existing
house and garage on the property that will remain as well as an existing barn which will
be moved to the west portion of the site — the house and barn are considered historic to
the site. Approximately half of the site will undergo grading and other construction
activity. The subdivision will consist of a single large lot (1.7 acres) around the existing
house, relocated barn and garage as well as 13 additional residential lots which vary in
size from 15,000 square feet to 22,000 square feet in size. The project is in the Urban
Estate zoning and is being designed as a "cluster" development which requires that 50%
of the overall project be reserved as open space. Tract A (mostly on the north and east
sides of the site) meets this open space requirement. There are also several Natural Areas
buffers on the site. These include buffers to the existing windrow on the west, the ponds
and wetlands on the north, and the banks of FCRID on the east.
The existing road right-of-way has a very shallow slope (0.5%) toward the site; the
western portion of the site with the existing structures also has a very shallow slope. The
central and eastern portions of the site are considerably steeper and range form 5% to
10% to the east. The existing drainage patterns on the site are relatively complex. The
southern portion of the site and the existing right-of-way drain east and into FCRID via
overland flow over the banks or through an existing pipe from the site into the side of the
TABLE OF CONTENTS
TABLEOF CONTENTS...............................................................................................................
iii
1.
GENERAL LOCATION AND DESCRIPTION
1.1 Location...................................................................................................................I
1.2 Description of Property............................................................................................1
2.
DRAINAGE BASINS AND SUB -BASINS
2.1 Major Basin Description..........................................................................................2
2.2 Sub -Basin Description.............................................................................................2
3.
DRAINAGE DESIGN CRITERIA
—
3.1 Regulations..............................................................................................................3
3.2 Development Criteria Reference and Constraints....................................................3
3.3 Hydrologic Criteria..................................................................................................3
3.4 Hydraulic Criteria....................................................................................................3
4.
DRAINAGE FACILITY DESIGN
4.1 General Concept.......................................................................................................4
4.2 Specific Flow Routing.............................................................................................5
4.3 Drainage Summary ...................................................................................................7
5.
EROSION CONTROL
5.1 General Concept......................................................................................................8
5.2 Specific Details........................................................................................................8
6.
CONCLUSIONS
6.1 Compliance with Standards....................................................................................8
6.2 Drainage Concept.....................................................................................................9
7.
REFERENCES....................................................................................................................9
APPENDICES
A Vicinity Map
B Hydrologic Computations
C Hydraulic Calculations
D Detention and Water Quality Pond Sizing
E Erosion Control Calculations
F Figures and Tables
iii